Loading...
PUD Site PlanRev 3-16-17 (2)Development Area Construction Staging AreaAccess Drive Sidewalks Nature Trail Pond Expansion Utilities-Lift Station Temporary Construction Staging Parcel 2 Line Independent Living Units Conservation Area Exi s t i n g L o o p R o a d Acquisition Parcel A (COJ LUZ: MDR- RMD-C) Existing Fleet Landing Campus 2.4 Acres Expansion Parcel Proposed Improvements Atlantic Beach COJ Pond Expansion Lift Station AccessDriveSidewalkNature Trail Fleet Landing PUD Modification Exhibit D PUD Modification Site Plan Prepared By: Naval Continuing Care Retirement Foundation Inc.February 15, 2017 REV. 3-16-17