Loading...
Exh 2Az~ Report on Strategic Planning Process City of Atlantic Beach, Florida Apri124, 2000 The Mayor and Commission of the City of Atlantic Beach recently completed a process to identify and prioritize strategic planning goals. This report summarizes the top issues and values that the Mayor and Commissioners utilized in prioritizing the strategic goals, lists the goals, average scores and descriptions in order of their priority, reports on the specific action steps that the City staff anticipate to accomplish the strategic goals, and last, reports on the results of the Strategic Planning Process Survey that was distributed by the City's Facilitator at the end of the process. Throughout this process, the City utilized Ed Preston and Associates, Inc, as the Planning Process Facilitator who was contracted through the University of North Florida in Jacksonville. Mr. Preston's report, "Environmental Analysis'° and "Prioritization Grid" is attached as Exhibit A. Top Ideas A number of top ideas surfaced during the first Strategic Planning Workshop through a joint brainstorming session involving the Mayor, Commissioners, and top staff. The top ideas resulting, with their respective ratings, are listed in priority order as follows; • infrastructure, planning, preventative maintenance, age and repairs (S) long range Planning (8) • information technology/GiS needs (6) • codes,. enforcement, weakness of the zoning and comprehensive land use (5) • park development master plan and maintenance (4) • competitiveness (3) • personneUtalent (3) • threatened by debt (3) Top Values Much like the collaborative effort to come up with top ideas, the second strategic planning workshop generated a list of top values which are listed as follows: • integrity • strategic plan • fiscal responsibility • availability of resources • public safety Stra~e~c Planning Priorities'. Report on Strategic Planning Process ,April 24, 2000 Page 2 After review of the top values and ideas, the City Commission then prioritized goals. Each elected official scored each of the goals with any number from one to 100 (100 being top priority and 0 being lowest). The average priority between the five elected officials then became the ranking criteria. These are summarized in order as follows: Average Item Score Description Core City Project 98 Storm water, sewer and water improvements for the Core City Area Multi-Year Financial Planning 96 Preparation of cost projections fox future O & M, revenues and capital costs; prepare multi-year budget estimates Zoning Code 86 Includes revision of current zoning code and zoning related steps to preserve the residential character of the Core City area.. _~aintenance of City facilities 84 Includes maintenance of City buildings, landscaped areas, streets, signs, parks, and other non utility facilities. Mapping 84 Upgrade and improvement of City mapping ability with particular emphasis on computer based {GIS} capabilities. Mapping to include not only city utility systems, but zoning, tax information, streets, and other important map characteristics, Information Technology 80 Rapid development of City's Information Technology SystemsfTelephone System and telephone systems to improve service to the public and promote efficiency internally, Utility System Planning ?6 Create, follow and periodically update master planning for City's utilities including water, sewer, wastewater, sanitation and storm. drainage. Water and Sewer Efficiency 67 includes several projects to improve the efficiencies of the water and sewerfwastewater operations to reduce future costs and possibly postpone the need for rate increases. --- Report on Strategic Planning Process April 24, 2000 Page 3 Performance Indicators 64 Creation and routine monitoring of objective numeric performance indicators for all City departments and divisions. Enhancing the Character of 63 Includes a variety of small projects including Atlantic Beach landscaping, improvements in the Town Center area and other commercial areas, enhancing beach access points, and various other improvements. Personnel Systems 62 This includes the creation and use of job classification and pay systems. Septic Tank Conversion 60 Encourage the elimination of the City's 300 remaining septic tanks that have sewer availability through use of financing and other incentives. Acquisition and Developmem of 39 Includes several pazks in various stages ranging from New Parks initial conception to land acquisition, construction, development,. and management. Public Information 36 Broaden the scope of communications with the public provided by the City. Mayport Road Corridor 33 Improving the commercial area along either side of Mayport Road using zoning, code enforcement, landscaping, and other city services. Action Plan City Staff has already begun taking steps to accomplish the goals set forth by the City Commission. Several steps have been devised in each of these top goals which are listed in the attached "Strategic Action Plan", (Exhibit B). These action steps include who each goal is assigned to, estimated beginning and completion dates, and comments. It is anticipated that this action plan will provide the format for periodic reporting during the coming yeaz. Additional steps will be added for future reports or modified as needed. Presently, only the top seven. goals are listed with action steps. As the year progresses, and time becomes available, the status of steps under other goals may also be listed Survey A Strategic Planning Process Survey was distributed both to elected officials and top staff at the end of the Strategic Planning Process. Respondents were asked to rate each of the ,, Report on Strategic Planning Process '` , April 24, 2000 Page 4 questions with one of five responses ranging from "strongly agree" to "strongly disagree." The questions, along with the frequency of answers for each, follows; Straatgly Don't Strongly Qaestion Agree Agree Know Disagree Disagree I believe the strategic planning method we 2 9 0 1 0 used this year worked well. I believe the location. ofthe session at the 0 4 2 6 0 Commission chambers worked best. I believe the location of the sessicai at the Sea 1 S 1 2 0 Turtle worked best i believe the strategic planning process served 3 7 Z 0 0 well to establish long-term priorities. I believe the strategic planning process worked 5 S I 1 0 well to consic~r all of our ideas. I believe some sort of strategic planning 5 6 1 0 0 process needs to be repeated every year. I believe the strategic planning process worked 5 6 0 l 0 well to inch~de tap. City staff. I believe strategic planning is generally 7 5 0 0 0 beneficial to the overall coxnrnunity. I believe we invested enough time to do a 1 4 4 3 0 satisfactory job. Summary; The Mayor and Commission have now prioritized the major goals for the City Staff to accomplish in the coming year. This is an extremely important process because the City does not have the time or other resources available to do all things well. Periodic reporting of the ongoing steps needed to accomplish these goals will be done quarterly throughout the year and input from the City Commission will be requested each time to determine if the staff is "on the right tcsck." e ,3 _ Report on Strategic Planning Process ```~', April 24, 2000 Page 5 Any good strategic action plan must be subject to periodic adjustment so as to accurately reflect the changing needs of the community it serves. The City Commission and top staff have indicated a need to revisit this plan formally at least on a yearly basis. If major events such as a hurricane happen to require an immediate change to this prioritization, then the City Commission should feel free to change them as necessary. However, because these are all projects that are long term in nature, success in any given category will. require long term commitment. Unless emergency conditions occur, it will be best to leave the top priorities in place at least for one year. EKl P~ & sanc~at,~,, ln o,~,, ~~~~ ~ ~~~ -- - En~ironmentalA,nalysis City of Atlantic Beach ,~ PlanningWorYshop ~• d P s SPrmg:Zi100 ~~ ®~~ con mue ~ This commission needs to kee all a es on ' as a What are onr core City staff shoald be We helppeople p y their government to ~ disr~ver~te best •~ valves. driven by ... ideas be driven by ... Project Pazpose To prioritize Initiatives Integrity (Code of ethics, Ethical behavior, Doing tE-e right thing, not the most popular) 9 Availab~7ityof resources 6 Public safety 6 lnclusionary 2 Playgrounds, tree canopy, activities 2 Responsivegovern- ment 3 Taxes 2 Existing laws I Commonsense application of laws 1 Open government 1 Openess & citizen participation 1 Preservation of emvirornnent, ambi- ance l Good looking city Economy Frugality Fioancialreserves The viability and survivability of the City Non factual ruts The sile~rt majority Perfonnattce indica- tors Familyoriented Fiscalresponsibility Fairness(Equalityof 4 (economy, effi- all people under the ciency, bottom line) y law, Equal appplica d Efficient & friendly on ofthe Iaw 3 government Strategic Plan 3 9 Quality of skills 2 Honesty in everyday Citizen needs 3 Professio~lism dealings 1 2 Infi~astructure maintenauceplans Humantouch Innovation 3 1 3 budgets Teamwork Autonomy 1 Costs of doing 1 Pristine ditches bus~ss Quality l Excellent service Service mentality Good customer service Caring government understatuling Sensitive to citizens Initiative L L Top Values Integrity Strategic Plan Fiscal Responsibility Availability of resources Pablic Safety PlanninFaciitatas Strategic ~'a~` ~~,>~ Plaaningworkshop ~p4~`) "3~a~i~9 ~Pr~455roadcom PriorittizationGnd l'age4 City of Atlantic Beach Spring, 2040 Project List Cost Citizen Time Howwell owwe o a We help peopple Imiract does it line ap does it How doable ~ ~ .~ ~ ~ ~ ~ discovef>~le besf (Thousands) ~1_lp) (Years) with core address top ~ it• o ~ ~ ~ a a ~~ values? issues? C~ A~ 1. Develop LT. Sysbeun 10's '. ~rOjt'.Ct PorpoSe Deep COLS Map- 10's To prioritize 3. Develop perfamance 1's initiatives 4. Dew~op Pasgmel 10's 8+ 3-S Mediinm High High 80 80 100 90 50 80 6 7 3-5 High High High 100 80 100 90 SO 84 S i t t4lediwn Low High 80 80 50 60 50 64 9 ', 5. Begin Multi-year 1's+ Staff Financial Phoning 7. City Faality Mairrte• I00's Dance (Packs & Roads, non-utilities) s. s-lo M Sanitation (C~tal) 9. CamQleie Coe City tr$ M ~.1~ 10. water & sewer 10's ~«~ u. Pablio hdarmati~ loo 12. AcquisiCica & 100's -1 M Derelopmant of New Parks l3.ltt~rovrmrnts to 10's+Smff Mayport Road Casridor 14. Enhancing the I00's Character of Athotic Beach 15. Septic Tank halo- mentation 5 12 Medium Low High 80 80 50 50 50 62 11 Z 2-3 High High FOgh 100 100 100 100 SO 96 2 8 3-5 1Figh Hagh Hrgh 80 90 100 ~ ti0 84 4 7-9 3.5 High High Medium 100 100 50 70 60 7G 7 7 3-5 Hrgh FOgI- ITigh 100 100 100 100 90 98 1 7+ 2-3 High Iilgh Hrgh 100 60 50 65 60 67 8 3-i 1 Low Medium Hrgh 40 ti0 0 30 50 36 14 6 3-5 Low 1Figh Medium 25 40 10 40 80 39 13 4-6 3-5 Law Low High 25 40 10 40 50 33 15 7-8 3-5 High Mediuon Hrgh 25 50 100 40 100 63 10 ~ High High 100 60 I00 40 0 60 12 16. Zoning Code Fnforceax:nt high ITigh High 100 60 100 70 100 86 3 Ed Proston & Associates, Inc. . ~,~~~~ sa~tegic Env~lronmen~ c~nc City of Atlantic Beach P.QBat/7D06 m4~aooe Planning Workshop f~nalySlS eye ~ Spring, 2000 pop ooer~oe EPro~567eplcam d K f~ Project Purpose To prioritize initiatives WeaImesses we Strengths we want Threats we must address Opportunities we want to strengthea~ to build from caa't ignore Maintenance 1 Lack of a strategic P~ I Lack of beautifica- tion & tree canopy on major streets i Laage needs im- pmvement Parks Lack of talented personnel Lack of mapping Equal representation of all areas Poorcommunication Lack of money A people flyover west to east Adantic Boulevard commercial area Mayport Toad Advancedplanning Stormwater Utilities competition Stafftraining 1 2 from JEA, JTA, 1 United Water Cant funding Community Loss of personnel 1 irtvolvemant 2 Teenagers Z Existingbuiidings A seise of commu- ~~' Quality of Gfe Departmental cooperation Natural beauty Limitedrevenues 1 Beach reaourishment 1 I-sided agreements with the City of Jacksonville Consolidated gov- emment 14layport freeway Limited land for growth and expan- sion Over regulation (SJRWNID, State interference Traffic Hurricane Other natural disas- ters Lack of leadership Crime /drugs Recession Utility efficiency 1 Computersystems 1 Salaries going up 1 Outdoor oriented populace Utility sorvice district boundaries Bedroom cammu- nity Beach /Ocean Stable population Beach renvurish- ment Land purchases Uniting the comm~- Conununication in & out Partnerships and privatizing Litigation Community center construction now, JTA .parks and recreation Terrorists Economic use of the beach 1. (: C Ed Preston & Associates, Inc. Planning Fadlitators v.a eoxaaos ~, ~~~ ~,~,~ e We hey people discover if-e best ideas Project To prioritize initiatives Shrategic Planning Workshop Trends to expect in Trends to expect in privatizing capital expenses Recycling sewer Billing expansion efllu~t 2 Water system Increasing expenses, limited revenue Utilities 1 Garbage More expensive borrowing Maintenance Inflaation Utilities billing Annexation Time Takingresponsibility for all areas in the city l Environmental Analysis ~'~ Citq of AtlanticBeach Page 2 Spring, 2000 {continued) Trends to expect in revenues Trends to expect in Top Ideas uh7ities Rate study Natural increase in Expanded water & Iafrastruch~re Z propertytax evatua- sewer lines extend. P~iug, preven- lionsandrising ing to all areas tative maintenance, User fees property values l ~~ repau~s l 8 New commercial New regulations Long range Increase in state development 1 plug revues 8 Lower forfeitures Customer focus A need to increase for police l Information Tech- nology! GIS needs revenues 6 A slowdown in the Privatizing Anticipate increase rate of increases due Codes in gas tax reveanues to ('united growth Takeover / competi- Enforcement, lion threats quality of, weak Transportation Grants uses of, zoning, comprehensive impacts Billingimprove- land use Permit fees meats 5 Citiz~ and political .:forces acting to limit Retro construction Water wars ParkDevelopment revenue expansion 1Vlaster Plan, Forging ofprivate / Inca water quality maintenance Antiapate increase public partnerships 4 in sales tax with like Town Center Elimir-ation of septic Competitiveness inflation tanks 3 Increase in bed tax Increase in storm revues Personnel( Talent water revenue 3 Decrease in locally generated revenues Threatened by debt 3 .. City of Atlamic Beach, Florida Strategic ActionPlan -04/17144 Strategic Priority item Estimated Start date Estimated Completion Date Status Comme~s 1. CORE CITX PROJECT (Bob Kosoy) a) Sanitary Sewer Improvements OSI01/00 O5/Ol/0I Bid specs out Per DEP Consent Ceder, must be ~ by 12/31!01 b) Sherry Drive 03/1S/41 10/31/Ol Contractor for Core City Storm Water Project will be instructed to co~lete Sherry Dove first c) Stormwater/Water *Preliminary Design 06126/(10 C+ngoing *Final Design 07!01/00 Ol/I5/01 *Constrnaron 04/09/01 02!15/02 2. MiIL1~YEAR FINANCIAL PLANNING (Nelson Van Liere) a) Develop a multi--year financial planning format fez Atlantic Beach badget 04/10/!10 06!30/00 b) Submit Preliminary Capital Improvements Plan to City Commission 06/30!00 08/01/00 c) Adopt Fy00/01 Budget with multi year planning 09/25/40 d) Refine project milestones and cost schedules 11/01/00 e) inventory 01/01/01 3. ZONING CODE (George Worley} a) zoning Code revisions *CD Board submittal to Commission 05!08/00 Aar `., 04/24/00 ~~, Strategic Priority item Estimated Start date Estimated Completion Date States Commems *Adoption of code revisions by Commission 06/26/00 subject to completion of public hearings b) Comprehensive Plan revulsion *CDB to choose Comp Plan cons9dtat~ OS/16100 06/12100 *Comp Plan changes ready for Commission reviewlpahlic heariags 08/31/00 *Finat adoption of Comp Plan changes 10/31/00 c) Protection of told Atlantic Beach character *7ourt workshop with Commission/CD Board to discuss OS/31I00 joint meeting may include both discussion of zoning ordinance and Old Atlantic Beach issues *Presentation of recsmnmendatwons from CD Board to Commission 07!10/00 4. MAINTENANCE OF CITY FACILITIES a) Road maintenance (Bob Kosay) *implement new software tracking system for roadslinventory OS/1S/00 07J1S100 *Completion of maintenance plan 08/15/00 *Implementation of yearly maintenance plan lOrolroO b) Street sign mau>icenance (Bob Kosoy) *Clean/repl~e street sigma as needed o4/18100 09/01/00 c) storm drainage cBob It;OSOy) *Improvements on W.13~ Street 09101/00 02124/01 ~j~ is ~y ~ design *Improvements; Stanley to Jackson 06/30/00 replacement of a deteriorated storm drain Pay ''• 04/24/00 ~,.. Strategic Priority item Estimated S#art date Estimated Cmnpletion Date Status Comments *impravements on Atdella Road 07/28/00 replacement of deterioratai storm drain * ditches 09/30/00 Skate Road, Cavella Road, Aquatic Drive, and W. levy Road *Seminole Road 02ro7ro1 osr~0/01 ~, ~, ~~ *Impravements in Royal bairn 07!01 09roz if fmided in oo-01Fiscal Year Budget d) City.Padcs (Timmy Johnson) *Inventory all facilities, equipment, grounds 04/18/ 06/01100 * Prioritize needed repairs, estimate cost 06!01/00 07!01/00 *Budget for repairslreplacements 07101/00 10/0I/00 5. MAPPING a) Identify/budget and acquire necessary software and hardware (David Tlmmpson) b) Utility mapping overlays (Bob IC~oy) *~ installation OS/15100 *Traming of Public Works personnel 06/30/00 *Sen+er base maps completed by constiltant : Master Plan with mapping ongoing *Watez ~m g ~ prey fended Sti~egic Priority item Estimated Start date Estim~ed Completion Date Status Comments *Stormwater mapping Only Core City area funded presently P~' ~~ 0~4I24100 ~. Strategic Priority item Estimated Start date Estin>a#ed Completion Date Status Comments 6. INFORMATION TECHNOLOGY 5YSTEMlTEI.EPHONE SYSTEM {David Thompson) *Select T£ Consoltant 04/05100 OS/02!00 Ongoing *lteview existing system 05102(00 05!15/00 *Identify needs for development 05!15100 07/01/00 *lteporbing/Budgeting 07/01/00 07/15/00 *Implemeurtation ofPlan 08/15/00 Ongoing 7, UTILITY SYSTEM PLANNING (Bob Kosoy) a) Sewer Master Plan *60% presentation to City Cummissuon 06/12!00 *Complete e~aerucy analysis 06/30!00 *Compiete Master Planning report Ongoing b) Water Master Plan 10/09J00 05/10/01 Contingent upon receiving budget funding P ~;."~, 04/24!00 `~.~.. ~a