Loading...
Exh 4CAGENDA ITEM NO. ~-~ _.._ \ DATE: ~~~~~~ CITY OF ATLANTIC BEACH CITY COMNIISSION MEETING STAFF REPORT AGENDA ITEM: Replacement of Hydropneumatic Tank at Water Plant No. 4 Bid No. 9900-8 SUBMITTED BY: Robert S. Kosoy, P.E., Director of Public Works '~°`'~.~'''~ DATE: April 18, 2000 BACKGROUND: During the annual inspection of the hydropneumatic tank at Water Plant #4, severe pitting was found on the interior upper portions, and the inspector recommended replacing the tank as soon as possible. Bid packages were sent to nine firms. Bids were received from four bidders on Apri14, 2000. All bidders submitted the required documentation, including a 5% bid bond The low bidder for the project was Crruhn May, Inc., with a fatal bid of $37,858.70. BUDGET: Funds were budgeted for this project under the Buccaneer Water Capital Improvement Account No. 400-4301-533-6300 in the amount of $25,000. Because we were able to purchase other items in this account well under budget, there are sufficient funds available for replacement of the hydropneumatic tank. RECOIVIlVIENDATION: Approve the low bid of GTUhn May, Inc., for Replacement of Hydropneumatic Tank at Water Plant No. 4, Bid No. 9900-8, in the amount of $37,858.70, authorize the City Clerk to send notification of award to the low bidder, and authorize the City Manager to sign the construction contract. ATTACHNfENTS: 1. Bid analysis 2. Bid tabulation form 3. *Bid specifications and documents on file with City Clerk. REVIEWED BY CITY MANAGER '~ Bid specifications are book length document~'and it is impractical to make copies. These documents are available for review in the Lily Clerk's office. CITY O~ ATLANTIC BEACH PUBLIC WORKS DEPARTMENT REPLACEMENT OF HYDROPNEUMATIC TANK AT WATER PLANT N0.4 B1D N0.8800-8 Aeril 18. 2nnn 81D ITEM: 1. Remove existin h dro tank 2. Provide and instail new h dro tank 3. Disinfection of new tank Gruhn Ma Inc. $2 930.00 $30 557.00 $930.00 CEM Ente rises inc. $2 500.00 $32 163.00 $1 000.00 Jack Ethrld a Tank Co. $4,025.00 $38 480.00 $1 995.00 Sawcross inc. $15 000.00 $29 300.00 $5 000.00 Subtotal $34 417.00 $35 663.00 $44 500.00 $49 300.00 10°r6 Contin enc TOTAL $3 441.70 $3T 858,70 $3 566.30 $39 229.30 $4 450.00 $48 960.00 $4 930.00 $64 230.00 c L REPLACE HYDROPNEIIMATIC TANK AT WATER PLANT NO. 4 BID NUMBER:9900-8 TABULATION OF BIDS Date of Opening: Apri14, 2000 . Page 1 of 2 REQUIItEMENT Ce d Ha Gruhn-May, Envi ntaI in ar PIn ing C s ction Inc. Re ove in 'es Document Requirement Checklist Insurance Certificate (at / least one original) Three references roof of Occupational ..ease ' Three copies of all bid requirements Bid Bond Total Dollar Amount of Bid $ $ $ 3, ~_ ~~~,~7 • $ $ .. F~'~ <REPLACE ffYDROPNEUMATIC TANK AT 'WATER PLANT NO.4 BID NU.M73ER:9900-8 TABULATION OF BIDS Date of Opening: . April 4, 2000 Page 2 of 2 REQUIREMENT CEM ENT SA'DVCR(?SS E ' ETHRIDGE DBA SUN INC GEO N TANK SHINE PNT CE i Document Requirement Checkli t ` / s r Insurance Certificate (at least ne ori i l na o g Three references Proof of Occupational ense ..d nree copies of all bid re uirements / / f q Sid B oz~d ~ / ~ Total Dollar Amount of Bid $3~~,'~~~.3~ $~~~~~• ~ $ $ ~$. ~.~O.~e $ .. '~~