Loading...
Exh 4Br t ~ a 4B May 22, 2000 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Manhole Rehabilitation 2400 -....CDBG, Bid No. 9900-12 SUBMITTED BY: Robert S. Kosoy, P.E., Director of Public Works ~'~~ George Worley, Community Development Director DATE: May 1S, 2000 BACKGROUND: Gee & Jenson. conducted a survey of sanitary sewer manholes at various locations in the City to determine rehabilitation needs. The resulting report noted several manholes in the Donner Subdivision were moderately to severely deteriorated, and in need of rehabilitation or replacement. Plans and specifications were developed by City staff. Invitations were sent to eight bidders , with two vendors declining to bid due to the project's small size. Four bidders were prequaiified to perform the work. Three contractors submitted bids, along with all the required documentation. Gruhn May, Inc. was the low bidder as shown in the following table: BID N0.9900.12 Gruhn May, Petticoat Callaway Inc. Contracting, Contracting, Inc. Inc. Base Bid -Manhole $45,412.40 $61,061.00 $76,099.00 rehabilitation and/or replacement in the Donner Subdivision Additive Alternate 1-Replace $12,793.00 $17,850.80 $12,711.25 dead end cleanouts with manholes on Ardella Road Total Base Bid Plus Additive $58,205.40 $78,911.80 $88,810.35 Alternate 1 BUDGET: The low bid for this project is $58,205.40. This project will be funded by Community Development Block Grant (CDBG) funds, which are available in the amount of $72,000.00. CDBG funds are budgeted each year for infrastructure improvements in low income areas. The project listed for these funds during the budget process was replacement of he water line on Richardson Lane, however, we were able to complete that project last fiscal year as part of the Ardella Road Water Line Replacement Project. Page 1 .. 4B May 22, 2000 RECOMMENDATION: Award the low base bid and. additive alternate no. 1 to Gruhn May, Inc. in the amount of $58,205.40, and authorize the City Manager to sign the construction contract. ATTACHMENTS: 1. Bid tabulation form. 2. Bid analysis. " 3. Drawing of project area. *4. Bid documents and specifications on file with City Clerk. *Bid specifications and documents are lengthy and it is not practical to make copies. These documents are available in the City Clerk's office for those who y~ish to review them. REVIEWED BY CITY Page 2 ~""^' BID TABULATION 4B May 22, 2000 BID NO. 9900-i2 MANHOLE REHAB DATE OF OPENING: 5/ 10/00 gip""' Note: Licensing was handled in Pre-Qualification CITY OF ATL .1TIC BEACH MANHOLE REHABILITATION 2000 - CDBG BID ANALYSIS -BID N0.9900-12 Gruhn May, Inc. Petticoat Contracting Callaway Contracting Item No. Description Qty. - Unit Unit Price Amount Unit Price Amount Unit Price Amount Base Bid Items: 1 Mobilization 1 LS $3 500.00 $3,500.00 $7 800.00 $7,800.00 $4,121.84 $4,121.84 2a Fibe lass m.h. liner 4-6' 3 Fro $4,695.00 $14,085.00 $6 975.00 $20 925.00 $6,495.88 $19,487.64 3a New coatin in m.h. 4-6' 3 Fro $1,265.00 $3 795.00 $889.00 $2,667.00 $3,958.64 $11,875.92 3b New coatin in m.h. 6-8' 2 EA $1 485.00 $2,970.00 $1 186.00 $2 372.00 $4,707.13 $9,414.26 4a Re lace m.h. w/concrete/fibe lass lined 4-6' 2 EA $5 830.00 $11,660.00 $8,020.00 $16 040.00 $4 967.36 $9,934.72 5 Re lace dead end cleanout w/coated m.h. 4-6' 1 EA $3 974.00 $3,974.00 $4 471.00 $4,471.00 $4 534.02 $4,534.02 6 Tree rotection 1 LS $400.00 $400.00 $235.00 $235.00 $474.60 $474.60 7 Sitework 1 LS $900.00 $900.00 $1,000.00 $1,000.00 $9,338.00 $9,338.00 Subtofal Base Bid $41,284.()0 $55 510.00 $69,181.00 Ten ercent contin enc $4,128.40 $5,551.00 $6,918.10 Total Base Bid: $45,412.40 $51069.00 $T6 099.90 Additive Alternate No. 1 Items: 1 Mobilization 1 LS $900.00 $900.00 $2,500.00 $2,500.00 $538.00 $538.00 2a Re lace dead end cleanout w/fibe lass m.h. 0. 1 EA $4,840.00 $4,840.00 $6,132.00 $6 132.00 $3 677.36 $3,677.36 2b Re lace dead end cleanout w/fibe lass m.h. 4- 1 EA $5,390.00 $5,390.00 $6,471.00 $6 471.00 $4,218.72 $4,218.72 3 Tree rotection 1 LS $200.00 $200.00 $125.00 $125.00 $474.60 $474.60 4 Sitework 1 LS $300.00 $300.00 $1,000.00 $1,000.00 $2,647.00 $2,647.00 Subtotal Additive Alternate No. 1 $19,630.00 $1 S 228.fl0 $11 555.68 Ten ercent contin enc $1,163.00 $1 622.80 $1 155.57 Total Additive Alternate No. 1 $12,793.00 $17 860.80 ~ $12,711.25 TOTAL BASE B/D PLUS ADDITNE ALT. NO. $58,205.40 $78 911.80 $88 890.35 ~C N N N O O O