1473 Marshview RERF20-0059 Receipt el"- INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes,inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: Power Pole Final Plumbing Silt Fence Final Electrical Piers/Stem Walls Final HVAC Underground Plumbing CC Final Underground Electric Final Building* Foundation/Footing *For new living space:When all construction work including electrical,plumbing, mechanical,exterior finish,grading,required paving and landscaping is complete Slab** and the building is ready for occupancy,but before being occupied **FORM BOARD ELEVATION CERTIFICATE MUST BEON-SITE FOR SLAB INSPECTION Swimming Pool Steel Retaining Wall Footing Swimming Pool Safety • Driveway Electrical Grounding&Bonding Sewer(Building Dept) Swimming Pool Final (Bldg) Sewer Tap(Utilities Dept) Swimming Pool Final (PW) Additional inspections may apply to your project if your project Rough Electric* contains these elements: Rough Plumbing/Top Out* Formed Columns/Beams* Rough Mechanical* Masonry Cell Fill *When all rough electric,plumbing,mechanical are complete but before any work is *When forms and reinforcing steel,anchor bolts,sleeves and inserts,and all covered up. electrical,plumbing and mechanical work is in place,but before concrete is poured. House Wrap Structural Steel* Wall Sheathing *When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. Roof Sheathing OTHER: Tie-down Framing Connections OTHER: Rough Framing OTHER: Roofing In Progress OTHER: Window/Door In-Progress OTHER: Insulation Ceiling Insulation WallR - S HI fQL. Exterior Lath vF ^1 Permit Type Stucco Scratch Coat Exterior Siding In-Progress Ri.c., RF- zo _ ws9Brick Flashing&Ties Permit No. Early Power 1 473 N\ sHVI€ w Gas Rough - 1 + Job Address Gas Final* *When all gas piping is complete and wallboard is installed but before gas is WE �1LTI 4xPik:4:1 attached to any appliance.All outlets must be capped and pipe pressurized at a 1 minimum of 15 lbs. Contractor POST THIS CARD WITH PERMITS AND PERMIT Building Department Public works/Utilities Fire Department DOCUMENTATION IN FRONT OF BUILDING Phone:904-247-5826 Phone:904-247-5834 Phone:904-630-4789 Fax:904-247-5845 Fax:904-247-5843 Fax:904-630-4203 INSPECTION LINE: 904-247-5814 MUST CALL BY 4PM PREVIOUS DAY FOR NEXT DAY INSPECTION Construction Hours per City Code:7am-7pm Weekdays;9am-7pm Weekends DESCRIPTION ACCOUNT QTY PAID PermitTRAK $109.00 RERF20-0059 Address: 1473 MARSH VIEW CT APN: 170704 0095 $109.00 BUILDING $105.00 BUILDING PERMIT 455-0000-322-1000 0 $105.00 STATE SURCHARGES $4.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R12039 $109.00 Printed: Tuesday, March 24, 2020 2:39 PM Date Paid: Tuesday, March 24, 2020 Paid By: Commonwealth Roofing Co Pay Method: CREDIT CARD 7 1 of 1 Cashier: FJ Cash Register Receipt City of Atlantic Beach Receipt Number R12039 $rS JIJr, Cash Register Receipt Receipt Number o 15 City of Atlantic Beach R12039 �\� DESCRIPTION I ACCOUNT QTY PAID PermitTRAK $109.00 RERF20-0059 Address: 1473 MARSH VIEW CT APN: 170704 0095 $109.00 BUILDING $105.00 BUILDING PERMIT 455-0000-322-1000 0 $105.00 STATE SURCHARGES $4.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R12039 $109.00 Date Paid: Tuesday, March 24, 2020 Paid By: Commonwealth Roofing Co Cashier: FJ Pay Method: CREDIT CARD 7 Printed:Tuesday, March 24,2020 2:27 PM 1 of 1 1