Exh 8A8A May 22, 2000 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Core City Sanitary Sewer Improvements Project, Bid No. 9900-11 SUBMITTED BY: Robert S. Kosoy, P.E., Director of Public Works ~~ DATE: May 15, 2000 BACKGROUND: A requirement of our Florida Department of Environmental Protection (FDEP) Consent Order No. 95-2971 is to complete improvements to the core city sanitary sewer system to correct inflow and infiltration problems. Construction of this project must be completed no later than December 30, 2001. The sewer improvements were originally planned to be completed in conjunction with the core city stormwater project, using an "open cut" method to completely replace all utility piping in the area. Due to the impending Consent Order deadline for sewer improvements, staff designed and bid the sewer rehabilitation using trenchless technology to meet the time requirement and avoid disturbing the roadway as much as possible. The specifications were based on extensive cleaning and videotaping of the sewer lines by Video Industrial Services, Inc. and smoke-testing performed by the Florida Rural Water Association. in addition, rehabilitation of sewer mains and manholes was included in the project. Contractors were required to review the large volume of materials at the Public Works Office, which included detailed sewer televising logs and tapes, smoke testing results, and core city sanitary sewer survey plans, included as part of the original England, Thims & Miller design. Four bidders were prequalified to perform the work. Three contractors submitted bids, along with all the required documentation. Insituform Technologies, Inc. was the low bidder as shown in the following table: Note: During the bid analysis, calculation errors were found and corrected on Insituform 's bid document for~Idditive Alternates 1 and 2. BID N0.9900-11 Insituform Kinsel Industries, P.M. Technologies, Inc. Inc. Constructian Base Bid -Sewer rehabilitation from Ahern St. to 10"' St., from East Coas $1,520,615.80; t $1,908,830,00 L,/ $2,588,3.00.00 ~,,'' Dr. to Sherry DrJSeminoie Rd. Additive Alternate 1-Sewer "' - $960,836.80 $1,218,74,5x.00 $1,63425.00 rehabilitation from Ahern St. to 10 t~ Street, East of East Coast Dr. Additive Alternate 2 -Replace dead- $349,720.80 $407,660.00 $458,700.00 end cleanouts with manholes at ` `' various locations. Page 1 y 8A May 22, 2000 BUDGET: The low base bid for this project is $1,520,615.80. Funds for this project aze budgeted under the Utility Revenue Bond Fund, Account No. 480-0000-533-6300 where there is $1,090,000 available for sewer rehabilitation. We have also received grant award from the Department of Community Affairs (DCA) for $300,000 that can be applied to the project. We were recently informed that we will be receiving a $350,000 grant through the Governor's Water Advisory Panel. RECOMMENDATION: Award the low base bid only to Insituforin Technologies, Inc. in the amount of $1,520,615.80. Authorize the use of $300,000 in DCA grant funds and $350,000 in Water Advisory Panel grant funds to be used for the project, and authorize a temporary transfer from Sewer Utility Reserves in the amount of $430,615.80 until the grant funds are received. ATTACHMENTS: I. Bid tabulation form. 2. Bid analysis. 3. Drawing of project area. 4. Example of sewer televising logs from core city area. 5. Comparative prices. *6. Bid documents and specifications on file with City Clerk. *Bid specifications and documents are lengthy and it is not practical to make copies. These documents are available in the City Clerk's office for those who wish to review,them. REVIEWED BY CITY MANAGER: \ Page 2 TABULATION OF BIDS Date of Opening: CORE CITY SEWER PROJECT - May 1, 2000 BID NO. 9900-1 i ~e 1 of 1 KinseI Insituform P.M. ads - REQUIREMENTS Industries Construction Barr 'lips Documents Requirements Checklist Signed , Bid Bond (5% ofBid) / t/ ~''~ Insurance Certificates, Original + two copies ~ ~ ~--~ Bid submitted IN TRIPLICATE (3 sets) ~ (~'~ Acknowledge Addendum #1 and Addendum #2 ~ ~ ~ (~ TOTAL BASE BID $ $ $ $ ~ 9~ goo SJ~o l~/~.5~ ~~,~S~~ TOTAL ADD ALT #1 $ ~i~~~s $ ~/~ / '~ ' i ' $ 9S ~~s ~a5 TOTAL ADD ALT #2 $ y~7~~o $ /~3 ~°S`~J ~~~ ~~ _ $ CITY OF ATLA:BEACH 'l~ BID ANALYSIS 5/?J00 - BID N0.8800-11 ~ CORE CITY SANITARY SEWER IMPROVEMENTS U 7 item No. Descri tion Est. Unit ..._..... _ .... .... Unit .......... ..... Amount ....wa, .......ar. Unit .ca Amount r.o,. awnaa,u Unit auun Amount BASE BID• Q Price Price Price 1 Mobilization 1 LS $1.00 $1.00 $60,000.00 $60 000.00 $20,000.00 $20,000.00 2.a. install limn or i eburstin existin i e,10" 5500 LF $40.00 $220 000.00 $74.00 $407,000.00 $120.00 $660,000.00 2.b. install limn or i eburstin existin i e, 8" 6300 LF $38.00 $239 400.00 $66.00 $415,800.00 $100.00 $630,000.00 3.a. Reconnect existin services, under avement 220 EA $2,820.00 $620,400.00 $2,500.00 $550,000.00 $3,000.00 . $660,000.00 4.a. Reconnect existin services not under avement 75 EA $2,385.00 $178,875.00 $2,000.00 $150,000.00 $2,500.00 $187,500.00 5.a. Install manhole liner or coatin in existin manhole 50 EA $1,121.00 $56,050.00 $1,400.00 $70,000.00 $2,000.00 $100,000.00 6.a. Re lace existin manhole with new manhole 10 F~ $4,890.00 $48,900.00 $3,500.00 $35,000.00 $5,000.00 $50,000.00 7 Re lace existin manhole rin and cover 50 EA $375.00 $18,750.00 $550.00 $27 500.00 $750.00 $37,500.00 8 Tree rotection 1 LS $1.00 $1.00 $5,000.00 $5,000.00 $3 000.00 $3 000.00 9 Sftework 1 LS $1.00 $1.00 $15,000.00 $15,000.00 $5,000.00 $5,000.00 Subtotal $1,382,378.00 $1,735,300.00 $2,353,000.00 10% Contin en $138,237.80 $173,530.00 $235,300.00 ~ N~r.w•n it TOTAL BASE BID ~ . .~-mow... ".~ 51,520,615.80 51,908,830.00 62,588,300.00 1 Mobilization 1 LS $1.00 $1.00 $40,000.00 $40,000.00 $3,000.00 $3,000.00 2.a. Install limn or i eburstin existin i e,10" 1350 LF $40.00 $54,000.00 $74.00 $99,900.00 $120.00 $162,000.00 2.b. Install finin or i eburstin existin i e, 8" 6800 LF $38.00 $258,400.00 $66.00 $448,800.00 $100.00 $680,000.00 3.a. Reconnect exlstin services, under avement 125 EA $2,820.00 $352,500.00 $2,500.00 $312,500.00 $3,000.00 $375,000.00 4.a. Reconnect existin services not under avement 45 EA $2,385.00 $107,325.00 $2,000.00 $90,000.00 $2,500.00 $112,500.00 5.a. install manhole liner or coatin in existin manhole 35 EA $1,121.00 $39,235.00 $1,400.00 $49,000.00 $2,000.00 $70,000.00 6.a. Re lace existin manhole w'rfh new manhole 10 EA $4,890.00 $48,900.00 $3,500.00 $35 000.00 $5,000.00 $50,000.00 7 Re lace existin manhole rin and cover 35 EA $375.00 $13,125.00 $550.00 $19,250.00 $750.00 $26,250.00 8 Tree rotection 1 LS $1.00 $1.00 $3,500.00 $3,500.00 $3,000.00 $3,000.00 9 Sitework 1 LS $1.00 $1.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 Subtotal $873,488.00 $1,107,950.00 $1,486,750.00 10°~ Contin enc $87,348.80 $110,795.00 $148,875.00 TOTAL ADDl7NE ALT. #1 $960,836.80 51,218,745.00 61,635,425.00 ADDITNE A LTERNATE 2 1 Mobilization 1 LS $1.00 $1.00 $15,000.00 $15,000.00 $3,000.00 $3,000.00 2 Re lace dead end cleanouts with manholes 2D EA $2,745.00 $54,900.00 $3,000.00 $60,000.00 $3,500.00 $70,000.00 3.a. install limn or i eburstin exis6n i e, 6" 2550 LF $45.00 $114,750.00 $62.00 $158,100.00 $70.00 $178,500.00 4.a. Reconnect existin services, under avement 40 EA $2,820.00 $112,800.00 $2,500.00 $100,000.00 $3,000.00 $120,000.00 5.a. Reconnect ex~stin services, not under avement 15 EA $2,365.00 $35,475.00 $2,000.00 $30,000.00 $2,500.00 $37,500.00 6 Tree rotection 1 LS $1.00 $1.00 $2,500.00 $2,500.00 $3,000.00 $3,000.00 7 Sitework 1 LS $1.00 $1.00 $5,000.00. $5,000.00 $5,000.00 $5,000.00 Subtotal $317,928.00 $370,600.00 $417,000.00 10%Contin en $31,792.80 $37,060.00 $41,700.00 TOTAL ADDITIVE ALT. #2 $349 720.80 6407,660.00 6458 700.00 BASE BID PLUS ADDITIVE ALTERNATE N0.1 $2,481,452.60 $3,127,575.00 $4,223,725.00 BASE BID PLUS ADDITIVE ALTERNATE N0.2 $1,870,336.60 $2,316,490.00 $3,047,000.00 BASE BID PLUS ADDITIVE ALTERNATE N0.1 & 2 $2,831,173.40 $3,535,235.00 $4,682,425.00 N N N ~ O O O ~~~ ~,,.,~~ 4 ~~' .~"k~.b,,.,7.~.: i ~~ ~~ -~.... ~-:; -~, ~~ h.~ ~- ~ f ~~~ f3 ~ i~ j M ~~~d 1f} Vj ti %~ S '«. ~~~fl ~! ~~ 8A ---.. May 22, 2000 /~7`ach~'rl~if ~} Video Industrial Services, Inc. ATL BC H 113 Sheridan Road Birmingham, AL 35214-4671 Phone: (800) 34i-1425 Fax: (312) 666-5810 CORE CITY. Site ID Ci Street Date Time ATL BCH 5TH ST 10/6/99 ~ 11:30:00 AM ~ M.H. Start Startin De th Startin Ft M.H. - Sto Endin De th Endin9 Ft9 ~ MH44 ~ 6~~ ~ 0 [ M H43 ~ C~~ ~- 356 -1 Pipe Direction Pipe Size - Irregular Pipe Size T e of Pipe Jointlen th i W~ ~ 8 ~ _~~ Cla~~~~ TapelD Counter Start Counter End _ Surface Cond. Camera Direction r DS8 1(- 0 -~ 2810 ~ ~ Paved -} Downstream ~ Comment Disc Se ment VAAAB000011 2 Mt i44 Distance Category Category Details Service Address Pict1 Comments ' -•0 `"- 1 Manhole Upstream : ~,\ • 1 71 Pipe Material Change to '~,~ PVC ~`.~• 1.9 ~ 64 ~ Pipe Broken '~ •4.1 ~ ` 72 Pipe Material Change to ~ .. '~. ` VCP `~,;' •, '• 14.3 47 Crack Longitudinal `~.. •26.8 47 Crack Longitudinal ~. •32.4 51 Connection Factory Left '•54.4 50 Connection Factory Right ~~.~'~•71.5 47 Crack Longitudinal ~'• 76.7 51 Connection Factory Left _ •~ ~"•89.5 71 Pipe Material Changeto , PVC ~•98 72 Pipe Material Change to ,; VCP ~f Y _ ~'•., •109.8 71 Pipe Material Change to \~ `- PVC , , '~, ~ • 120.1 72 Pipe Material Change to ~ •, ~ VCP `~. ~\~ 123.4 ` ' 51 Connection Factory Left ~, • 129.4 50 Connection Factory Right •156.1 47 Crack Longitudinal 1NFILT -205.1 50 Connection Factory Right (( \\~ -•222.5 45 Crack Circular INFILT J1 :~\ •226.5 47 Crack Longitudinal -229.9 71 Pipe Material Change to ~~ .. PVC , `.•239.6 51 Connection Factory Left '•241.5 72 Pipe Material Change to VCP "^^~ `~., `, •252.8 47 Crack Longitudinal •256.6 71 Pipe Material Change to PVC `~,,`~~ '•269.1 72 Pipe Material Change to ~, \ ~ VCP ' ~ `•, • 278.5 50 Connection Factory Right ~~. ~•2H5.5 71 Pipe Material Change to PVC •305.3 72 Pipe Material Change to VCP ' `-.'i~.i 7 R~. rlr.vs I'rv~nariirv. 7 .t a ATLANTIC BEACH PUBLIC WORKS DEPARTMENT COMPARISON FOR SEWER LINING PROJECTS May 20D0 Ilnit Prir_ac fnr CIP17 Sewer RnhehllitnNnn Item Deserlptlon Core City Sewer May 2000 Current JEA Contract Ptlce A.B. Sewer Llning 1999 Jax Beach Llning 1997 Comments Install lining in 10" ipe $40 $47.00 $55.00 $48.00 Additional hourly pum ing rate charged to JEA for b pass pumping, cost included in AB bid Install lining in 8" ipe $38 $43.00 $50.00 $42.00 Additional hourly pumping rate charged to JEA for bypass umping, cost included in AB bid Reconnect services under avement $2,820.00 $2,847.00 NIA N/A Additional $450 charged to JEA for cleanout, cost included in AB bid Reconnect services not under avement $2,385.00 $2,847.00 N/A N/A Additional $450 char ed to JEA for cleanout, cost included in AB bid Install lining in manholes Spectrashield $1121 fiberglass $4020 fiber lass $4000 N/A Replace existin manhole with new mh $4,890 N/A N/A N/A Not included in JEA contract, or in the last AB project Replace existing manhole rin & cover $375 NIA N/A N/A Not included in JEA contract, or in the last AB roject N N N C O O