Loading...
763 Atlantic Blvd COMM20-0012 26 of 26 P5-PLUMBING DETAILSSECTION 15400 - PLUMBING1. SCOPE OF WORK2. SHOP DRAWINGS3. PRODUCT HANDLING4. EXAMINATION OF THE SITE5. GUARANTEE6. PRODUCTS7. FIXTURES8. FLASHINGS9. CLEANOUTS10. EQUIPMENT11. EXECUTIONGENERAL NOTESA. FURNISHING OF ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION SERVICES, ETC. NECESSARY TO COMPLETE THEINSTALLATION OF THE PLUMBING SYSTEM AND AS DESCRIBED IN THESE SPECIFICATIONS, AS ILLUSTRATED ON THEACCOMPANYING DRAWINGS, OR AS DIRECTED BY THE ARCHITECT.B. ALL HOT AND COLD WATER SYSTEMS WITH COMPLETE CONNECTIONS FROM THE WATER METER TO ALL PLUMBING FIXTURESAND EQUIPMENT REQUIRING WATER CONNECTIONS. THESE SYSTEMS WILL BE COMPLETE WITH CONTROLS, VALVES,EQUIPMENT, DEVICES AND INSULATION.C. ALL SOIL, WASTE, AND VENT SYSTEMS OUTSIDE AND INSIDE THE BUILDING AND SEWER CONNECTIONS TO MUNICIPAL SYSTEMAS INDICATED ON DRAWINGS.D. FURNISH AND SET PLUMBING FIXTURES, INCLUDING ALL THE REQUIRED TRIM AND SUPPORTS.E. TRENCHING, PIPE BEDDING, BACKFILLING, COMPACTION AND SOIL TREATMENT.F. ALL ROUGH-IN AND FINAL CONNECTION TO EQUIPMENT, FIXTURES AND SERVICE AREAS IF INDICATED ON THE DRAWINGS,INCLUDING NECESSARY TRAPS AND MISCELLANEOUS ITEMS AS REQUIRED. COORDINATE W/OWNER.G. FURNISH ALL FINAL PLUMBING CONNECTIONS TO HEATING AND AIR CONDITIONING EQUIPMENT INCLUDING CONDENSATEDRAINS, INDIRECT WASTE AND GAS PIPING.H. METERS AND UTILITY CONNECTIONS:a. WATER: COORDINATE WORK WITH THE LOCAL WATER COMPANY. FURNISH ALL LABOR AND/OR MATERIAL (NOTFURNISHED BY THE WATER COMPANY) WHICH IS REQUIRED TO CONNECT TO EXISTING LINE AND/OR SET METER.INSTALL ALL PERMANENT WATER SUPPLY LINES FROM THE POINT OF CONNECTION AND COMPLETE THE WORK ASSHOWN, ALL IN LINES FROM THE POINT OF CONNECTION AND COMPLETE THE WORK AS SHOWN, ALL IN ACCORDANCEWITH THE REQUIREMENTS OF THE LOCAL WATER COMPANY. TAP FEES SHALL BE PAID BY OWNER. (IF REQUIRED)PLUMBING CONTRACTOR SHALL PAY ALL WORK RELATED INSPECTION FEES BY AUTHORITY HAVING JURISDICTION.b. SEWER CONNECTIONS: COORDINATE WORK WITH THE LANDLORD AND/OR LOCAL UTILITY COMPANY. ALL WORK ANDMATERIALS SHALL BE IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL GOVERNING AUTHORITY. TAPFEES SHALL BE PAID BY OWNER (IF REQUIRED). PLUMBING CONTRACTOR SHALL PAY ALL WORK RELATED INSPECTIONFEES BY AUTHORITY HAVING JURISDICTION (IF REQUIRED).c. GAS: COORDINATE WORK WITH LOCAL UTILITY AND FURNISH ALL LABOR AND/OR MATERIALS (NOT FURNISHED BY UTILITYWHICH IS REQUIRED TO PROVIDE A WORKING UTILITY FOR OWNER, INCLUSIVE OF METER AND/OR REGULATOR. FURNISHSYSTEM FROM TAPPING POINT TO AND IN THE BUILDING AS REQUIRED AND SHOWN ON DRAWINGS. TAP FEES SHALL BEPAID BY OWNER. PLUMBING CONTRACTOR SHALL PAY ALL WORK RELATED INSPECTION FEES.I. GAS PIPING TO HEATING, VENTILATING AND AIR CONDITIONING EQUIPMENT, AND WATER HEATER.A. WITHIN 15 DAYS AFTER AWARD OF CONTRACT, AND BEFORE ANY PLUMBING MATERIALS ARE DELIVERED TO THE JOB SITE,SUBMIT TO THE OWNER THREE (3) COMPLETE SHOP DRAWINGS IN ACCORDANCE WITH THE PROVISIONS OF SECTION01300 OF THESE SPECIFICATIONS, INCLUDING ALL PLUMBING FIXTURES, TRIM, DRAINS, CLEANOUTS, PIPING, VALVES,INSULATION, HANGERS, SUPPORTS, EQUIPMENT AND DEVICES PROPOSED TO BE FURNISHED AND INSTALLED. SHOPDRAWINGS SHALL NOT BE REVIEWED UNLESS THEY BEAR THE REVIEW STAMP OF THE GENERAL CONTRACTOR.A. IN THE EVENT OF DAMAGE, IMMEDIATELY MAKE ALL REPAIRS AND REPLACEMENTS NECESSARY TO THE APPROVAL OF, ANDAT NO ADDITIONAL COST TO THE OWNER.A. ALL CONTRACTORS SUBMITTING PROPOSALS FOR THIS WORK SHALL FIRST EXAMINE THE SITE AND ALL CONDITIONS,INCLUDING LOCAL RULES & REGULATIONS, THEREON AND/OR THEREIN. ALL PROPOSALS SHALL HAVE TAKEN INTOCONSIDERATION ALL CONDITIONS THAT MAY AFFECT THE WORK UNDER THIS CONTRACT. LACK OF THIS INFORMATION WILLNOT BE CONSIDERED AS JUSTIFICATION FOR EXTRA COST OR ALLOWANCES TO THE CONTRACT PRICE.A. ALL WORK PERFORMED UNDER THIS SECTION SHALL BE GUARANTEED TO BE FREE OF DEFECTIVE MATERIALS ANDWORKMANSHIP FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE OF THE WORK BY THE OWNER.B. UPON NOTICE RECEIVED FROM THE OWNER, ARCHITECT OR ENGINEER, OF FAILURE OF ANY PART OF THE GUARANTEEDEQUIPMENT DURING THE GUARANTY PERIODS, THE AFFECTED PART OR PARTS SHALL BE PROMPTLY REPLACED WITH NEWPARTS BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL LABOR REQUIRED TO PERFORM GUARANTEEDSHALL BE INCLUDED AS PART OF THE COMPLETE WARRANTY.A. DESCRIPTIONa. SOIL, WASTE AND VENT PIPING: BELOW FLOOR TO 5'0" OUTSIDE BUILDING AND YARD PIPING SHALL BE A.B.S. ORP.V.C. SCHEDULE 40 PIPE AND FITTINGS IF APPROVED BY LOCAL AUTHORITY, OR STANDARD WEIGHT COATED CAST IRONSOIL PIPE AND CAST IRON/NEOPRENE GASKET FITTINGS CONFORM TO ONE OF THE STANDARDS LISTED IN TABLE 702.2OF FPCP (6th EDITION). YARD PIPING, WHERE UNDER A SUPERIMPOSED LOAD CONDITION SUCH AS A DRIVEWAY ORPARKING AREA, SHALL BE SERVICE WEIGHT CAST IRON SOIL PIPE AND CAST IRON/NEOPRENE GASKET FITTINGS.b. ABOVE FLOOR SHALL BE A.B.S. OR P.V.C. SCHEDULE 40 IF APPROVED BY LOCAL AUTHORITY, OR STANDARD WEIGHTCOATED CAST IRON PIPE WITH NEOPRENE RUBBER GASKETS, OR HUBLESS CAST IRON PIPE WITH NEOPRENE RUBBERGASKETS AND STAINLESS STEEL CLAMPS (CLAMPS ALL OR EQUAL) CONFORM TO ONE OF THE STANDARDS LISTED INTABLE 702.1 OF FPCP (6th EDITION).c. HOT AND COLD WATER PIPING: ABOVE THE FLOOR SHALL BE TYPE "L" COPPER WITH 95/5 SWEAT SOLDERED ANDWROUGHT COPPER FITTINGS. UNDER BUILDING SLABS SHALL BE TYPE "K" SOFT DRAWN COPPER TUBING WITHOUTJOINTS UNDER FLOOR. LOOP FROM WALL TO WALL. OR CPVC MATERIAL PIPING; CONFORM TO ONE OF THE STANDARDSLISTED IN TABLE 605.3 AND 605.4 OF FPCP (6th EDITION) BASED ON INTENDED USE OF PIPING. ALL HOT WATERDISTRIBUTION PIPE AND TUBING SHALL HAVE MINIMUM PRESSURE RATING OF 100 PSI AT 180°F.d. CONDENSATE DRAIN PIPING:ꞏCONDENSATE DRAIN PIPING SHALL BE GALVANIZED SCHEDULE 40 OR P.V.C. FROM HVAC ON ROOF AND OTHEREQUIPMENT UNLESS STATED OTHERWISE.ꞏCONTRACTOR SHALL FURNISH AND INSTALL MIN. 1" COPPER CONDENSATE DRAINS ON COOLER/FREEZEREVAPORATOR COILS, WITH TRAP ASSEMBLY AND 2" AIR GAP ABOVE DRAIN AS SHOWN ON THE DRAWINGS. FREEZERCONDENSATE PIPING SHALL BE WRAPPED WITH HEAT TAPE WITH A MINIMUM RATING OF 10 WATTS PER LINEAL FOOTFOR ITS ENTIRE LENGTH WITHIN THE FREEZER COMPARTMENT.e. INDIRECT WASTE PIPING: SHALL BE TYPE "L" COPPER WITH 95/5 SWEAT SOLDER AND WROUGHT COPPER FITTINGS (SEEPLUMBING PLAN FOR REQUIREMENTS) UNLESS OTHERWISE INDICATED.f. NATURAL GAS PIPING:ꞏGAS PIPING INCLUDING TAP AND SERVICE SHALL BE INCLUDED. COORDINATE METER LOCATION WITH LOCALAUTHORITY.ꞏUNDERGROUND GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH LONG RADIUS STEEL WELDINGFITTINGS. PROTECT PIPE AND FITTINGS WITH TRANTEX WRAPPING TAPE APPLIED IN ACCORDANCE WITH THEMANUFACTURER'S RECOMMENDATION. OTHER TYPE OF PIPE PROTECTION OF EQUIVALENT QUALITY WILL BE OPTIONALWITH THIS CONTRACTOR. INSTALLATION OF GAS SERVICE PIPING AND MATERIAL SHALL MEET WITH LOCAL GASCOMPANY'S APPROVAL.ꞏGAS PIPING ABOVE GROUND SHALL BE SCHEDULE 40 BLACK STEEL WITH 125 LB. BLACK MALLEABLE IRONSCREWED FITTINGS AND SUPPORTED AT INTERVALS NOT TO EXCEED 8'-0" AND AT EACH CHANGE IN HORIZONTALOR VERTICAL DIRECTION. GAS PIPING COMPOUND AT JOINTS SHALL BE IN COMPLIANCE WITH NFPA BULLETIN NO.54 AND LOCAL APPLICABLE CODES AND SUITABLE FOR NATURAL GAS SERVICE.ꞏGAS PIPING SHALL SUPPLY, WATER HEATER AND KITCHEN EQUIPMENT IF INDICATED ON DRAWINGS BY THISCONTRACTOR.ꞏMOISTURE TRAPS SHALL BE INSTALLED ON EACH PIPING DROP FOR WATER HEATER AND KITCHEN EQUIPMENT.ꞏALL SUPPORTS SHALL BE PIPING SHALL BE PROVIDED WITH SUPPORT IN ACCORDANCE WITH SECTION 407 AND 415FBCFG (6th EDITION).g. STORM DRAIN LEADER: SAME AS SOIL, WASTE & VENT PIPING.h. INSULATION : ALL WATER PIPES, RAIN LEADERS AND ETC., SHALL BE INSULATED. PIPING SHALL BE INSULATED TOPREVENT EXCESSIVE HEAT LOSS, CONDENSATION AND SWEATING. ALL PIPES RUNNING IN UNCONDITIONED SPACE SHALLBE PROTECTED AGAINST FREEZING. ALL PIPING SHALL BE INSULATED WITH AT LEAST 1" THICK FOAM INSULATION HAVINGA CONDUCTIVITY NOT EXCEEDING 0.28 BTU PER INCH/H xSQ.FT PER FBCEC (6th EDITION) SECTION C404.4 AND FBCP (6th EDITION) SECTION 607.5. AS MANUFACTURED BY ARMSTRONG ARMAFLEX OR APPROVED EQUAL AS INDICATED ON PLANSAND NOTES. AS MUCH OF THE INSULATION AS POSSIBLE SHALL BE SLIPPED ON TO THE PIPING AS THE PIPING IS BEING CONNECTED IN ORDER TO AVOID CUTTING THE INSULATION. ALL BUTT ENDS AND ANY NECESSARY LONGITUDINAL JOINTS SHALL BE SEALED WITH RUBBER BASED ADHESIVE.A. SEE DRAWINGS FOR SPECIFICATIONS.A. ALL PIPING AND VENTS PASSING THROUGH ROOF SHALL BE FLASHED WATERTIGHT WITH SIX POUND TO THE SQUARE FOOTLEAD USING SLEEVE FLASHING WITH BASE EXTENDING AT LEAST 12 INCHES IN EACH DIRECTION BEYOND THE OUTSIDEDIAPHRAGM OF THE PIPE. TURN SLEEVE DOWN A MINIMUM OF 1-1/2" INTO TOP OF VENT PIPE WITH LEAD FITTINGSNUGLY INSIDE OF PIPE. ALL GAS VENT CAPS SHALL BE FITTED WITH LEAD FITTING SNUGLY INSIDE OF PIPE. ALL VENTCAPS SHALL BE VANDAL PROOF. VERIFY APPROVED FLASHING MATERIAL AND METHODS WITH ROOFING CONTRACTOR TOENSURE A COMPLETE JOB. SEE DETAILS ON ARCH. SHEETS.A. SEE DRAWINGS FOR SPECIFICATIONS.A. WATER HEATER: FURNISHED, INSTALLED BY PLUMBING CONTRACTOR.a. SIZE, CAPACITY, TYPE AND MANUFACTURER AS INDICATED BY DRAWINGS.b. N/Ac. THE WATER HEATER, GAS OR ELECTRIC, SHALL BE PROVIDED WITH ALL TEMPERATURE AND SAFETY CONTROLS INCLUDINGASME AND ANSI Z21.22 RATED TEMPERATURE CONFORM TO ASSE1070 AND PRESSURE RELIEF VALVE, GAS PRESSUREREGULATOR (IF REQUIRED), DRAIN VALVE, EXPANSION TANK, ETC.d. PLUMBER SHALL MAKE WATER, GAS AND RELIEF LINE CONNECTIONS WITH CUTOFF VALVES AND DIELECTRIC UNIONSIN WATER AND GAS LINES.B. VALVES, COCKS AND FAUCETSa. UNLESS SPECIFICALLY INDICATED ELSEWHERE, THE VALVES SHALL BE DESIGNED FOR NOT LESS THAN 160 LBS.WORKING PRESSURE AND SHALL COMPLY WITH SECTION 606 OF FBCP (6th EDITION) 2017. THE VALVES SHALL HAVESUITABLE VALVE BODY PATTERNS FOR CONNECTION TO THE PIPE FOR WHICH THEY WILL OPERATE. ALL VALVES WITHRISING STEMS SHALL HAVE BACK SEATS FOR PACKING UNDER PRESSURE. ALL VALVES AND CONNECTIONS SHALL BECONSTRUCTED WITH MATERIAL COMPLY WITH LEAD CONTENT STANDARD PER SECTION 605.7 OF FBCP (6thEDITION) 2017. APPROVED EQUAL GATE VALVES AND CHECK VALVES AS MANUFACTURED BY STOCKHAM, WALWORTH,LUNKENHEIMER, SCOTT, HAMMOND, CRANE OR WATTS WILL BE ACCEPTABLE.b. GATE VALVES SHALL BE OF AN APPROVED TYPE AND COMPATIBLE WITH THE TYPE OF PIPING MATERIAL INSTALLED INTHE SYSTEM. ALL VALVES INTENDED TO SUPPLY DRINKING WATER SHALL MEET THE REQUIREMENTS OF NSF 61.c. CUTOFF VALVES UNDERNEATH LAVATORIES, TANK TYPE WATER CLOSETS, SANITARY SINKS AND WATER COOLERS SHALL BECHROME PLATED ANGLE STOP VALVES WITH SOFT ANNEALED CHROME PLATED COPPER CONNECTION PIPES ANDCHROME PLATED ESCUTCHEON PLATES.d. GAS COCKS FOR ALL EQUIPMENT: SEE DRAWINGS FOR REQUIREMENTS.e. WATER CUTOFF VALVE SHALL BE OF AN APPROVED TYPE AND COMPATIBLE WITH THE TYPE OF PIPING MATERIALINSTALLED IN SYSTEM. ALL VALVES INTENDED TO SUPPLY DRINKING WATER SHALL MEET THE REQUIREMENTS OF NSF61.f. EXTERIOR HOSE COCKS AND VALVE FIXTURES TO BE NON-FREEZE TYPE. SUPPLY SHUT-OFF VALVES IF INDICATED ONPLANS.A. PIPINGa. ALL PIPING SHALL BE RUN CONCEALED EXCEPT WHERE SHOWN OTHERWISE ON DRAWINGS.b. VALVES, TRAPS, CLEANOUTS AND OTHER APPARATUS SHALL BE INSTALLED IN AN EASILY ACCESSIBLE LOCATION.c. SOIL, WASTE LINES 2-1/2" AND SMALLER SHALL SLOPE 1/4 INCH PER LINEAL FOOT AND 3" to 6" SHALL SLOPE 1/8INCH PER LINEAL FOOT IN DIRECTION OF FLOW PER FBCP TABLE 704.1, UNLESS OTHERWISE INDICATED OR REQUIREDBY LOCAL CODES.d. HOT AND COLD WATER LINES SHALL BE AT LEAST 6" APART WHERE PIPING IS PARALLEL.e. ALL WATER LINES SHALL BE RUN OVERHEAD AND DOWN PARTITION WALLS UNLESS NO WALL IS PROVIDED; THEN RUNLINES UNDER SLAB TO POINT OF TERMINATION. ALL LINES SHALL BE CONCEALED UNLESS NOTED OTHERWISE ONPLANS.B. HANGERS AND SUPPORTSa. COPPER PIPING SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED 7'-0" AND AT EACH CHANGE IN HORIZONTAL ORVERTICAL DIRECTION. HANGERS SHALL BE FEE & MASON PLASTIC COATED HANGER, FIG. 381 OR APPROVED EQUAL BYGRINNELL. HANGER ATTACHMENT TO STRUCTURE SHALL BE AS REQUIRED. HORIZONTAL SUPPORTS FOR PIPING SHALLWILL BE IN ACCORDANCE TO SECTION 308 OF THE FBCP (6TH EDITION).b. GAS PIPING SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED 8'-0" AND AT EACH CHANGE IN HORIZONTAL ORVERTICAL DIRECTION. STEEL PIPE HANGERS SHALL BE GRINNELL FIG. 104 OR FEE & MASON FIG. 199. ATTACHMENT TOSTRUCTURE TO BE AS REQUIRED. HORIZONTAL SUPPORT FOR PIPING WILL BE IN ACCORDANCE TO SECTION 407 AND415 OF FBCFG (6TH EDITION).c. HANGER RODS SHALL BE STANDARD BOLT STEEL WITH MACHINE SCREW THREADS, 3/8" DIAMETER MINIMUM.d. ALL PIPING UNDERGROUND SHALL BE FIRMLY BEDDED ON THE BODY OF THE PIPE, AND BELL HOLES PROVIDED ATEACH BELL. ALL PIPING SHALL BE INSTALLED IN GRADED TRENCH. EXCAVATE, BACKFILL AND SUPPORT PIPING ASHEREIN BEFORE SPECIFIED.e. FINISHEDꞏINDOOR FINISHES-HANGERS AND CLAMPS FOR SUPPORT OF BARE COPPER PIPING SHALL BE COATED WITH COPPER COLORED EPOXYPAINT, B-LINE DURA-COPPER®. ADDITIONAL PVC COATING OF THE EPOXY PAINTED HANGER SHALL BE USED WHERENECESSARY.-HANGERS FOR OTHER THAN BARE COPPER PIPE SHALL BE ZINC PLATED IN ACCORDANCE WITH ASTM B633 ORSHALL HAVE AN ELECTRO-DEPOSITED GREEN EPOXY FINISH, B-LINE DURA-GREEN®.-STRUT CHANNELS SHALL BE PRE-GALVANIZED IN ACCORDANCE WITH ASTM A653 SS GRADE 33 G90 OR HAVE ANELECTRO-DEPOSITED GREEN EPOXY FINISH, B-LINE DURA-GREEN®.ꞏOUTDOOR AND CORROSIVE AREA FINISHES-HANGERS AND STRUT LOCATED OUTDOORS SHALL BE HOT DIP GALVANIZED AFTER FABRICATION IN ACCORDANCEWITH ASTM A123. ALL HANGER HARDWARE SHALL BE HOT DIP GALVANIZED OR STAINLESS STEEL. ZINC PLATEDHARDWARE IS NOT ACCEPTABLE FOR OUTDOOR OR CORROSIVE USE.-HANGERS AND STRUT LOCATED IN CORROSIVE AREAS SHALL BE TYPE 304 [316] STAINLESS STEEL WITH STAINLESSSTEEL HARDWARE.C. PLUMBING FIXTURESa. FURNISH AND INSTALL ALL PLUMBING FIXTURES COMPLETE WITH ALL EQUIPMENT FITTINGS, TRIMMINGS ANDACCESSORIES, AS SPECIFIED. OPEN FRONT SEATS WITH NO COVERS AS MANUFACTURED BY CHURCH WILL BEACCEPTABLE.b. ALL FIXTURES SHALL BE GRADE A. THE NAME OR TRADE MARK OF THE MANUFACTURER SHALL BE PRINTED ORPRESSED ON ALL CLOSETS AND LAVATORIES, AND A LABEL, WHICH CANNOT BE REMOVED WITHOUT DESTROYING IT,CONTAINING THE MANUFACTURER'S NAME OR TRADEMARK AND THE QUALITY OR CLASS OF THE FIXTURES, SHALL BEAFFIXED TO ALL FIXTURES AND NOT REMOVED UNTIL AFTER THE WORK HAS BEEN ACCEPTED.c. EXPOSED PIPING TO FIXTURES SHALL BE A PRODUCT OF THE FIXTURE MANUFACTURER OR APPROVED EQUAL ANDSHALL BE:ꞏWATER: CHROMIUM PLATED IRON PIPE SIZE RED BRASS.ꞏWASTE: CHROMIUM PLATED TUBING, EXCEPT WASTE CONNECTIONS TO KITCHEN OR SCULLERY SINKS AS NECESSARY.d. STOPS AS MANUFACTURED BY THE FIXTURE MANUFACTURER, WITH METAL-TO-METAL SEAT, SHALL BE PROVIDED FORALL FIXTURES AND EQUIPMENT. REFER TO SCHEDULE ON DRAWINGS FOR MANUFACTURER'S AND MODEL NUMBERS USEDAS GUIDE SPECIFICATIONS. NUMBERS AS LISTED REPRESENT THE COMPLETE WORKABLE OUTFITS WITH ALL BRASS TRIMASe. FIXTURES SHALL BE WHITE UNLESS OTHERWISE NOTED.f. FIXTURES FURNISHED BY THIS CONTRACTOR OR BY THE OWNER SHALL BE FITTED WITH NECESSARY WATER SUPPLIES,STOPS AND TRAPS WITH CLEANOUT PLUGS UNDER THIS SECTION OF THE SPECIFICATIONS.D. TESTSTHE PERMIT HOLDER SHALL MAKE THE APPLICABLE TEST PRESCRIBE IN SECTIONS 312.2 THROUGH 312.10 TO DETERMINECOMPLIANCE WITH THE PROVISIONS OF FBCP (6th EDITION). ALL PLUMBING SYSTEM PIPING SHALL BE TESTED WITH EITHERWATER OR, FOR PIPING SYSTEM OTHER THAN PLASTIC, BY AIR.E. CLEANING AND PROTECTIONa. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DEBRIS AND LEFTOVER MATERIALS FOR WHICH HE ISRESPONSIBLE, CLEAN ALL FIXTURES AND EQUIPMENT AND REPAIR ANY BLEMISHES IN THE FINISH. THE CONTRACTORSHALL BE HELD RESPONSIBLE FOR REPLACING FIXTURES WHERE DAMAGE RESULTS FROM FAILURE TO PROVIDEPROTECTION DURING INSTALLATION.b. FLUSH OUT PIPES: AFTER THE PLUMBING PIPING HAS BEEN INSTALLED, INSPECTED AND APPROVED, THE PIPINGSYSTEM SHALL BE FLUSHED TO REMOVE ANY FOREIGN MATTER FROM THE PIPES WITH CHLORINE OR HTH SOLUTION TOSANITIZE THE NEW PIPING OR AS REQUIRED BY THE LOCAL AUTHORITIES PER SECTION 610 FBCP (6th EDITION).F. MAINTENANCEa. ALL PARTS OF THE PLUMBING FIXTURES AND ASSOCIATED EQUIPMENT SHALL BE MAINTAINED BY THE CONTRACTORTHROUGHOUT THE GUARANTEE PERIOD. ONE MONTH AFTER FINAL ACCEPTANCE OF THE BUILDING BY THE OWNER, THECONTRACTOR SHALL GO OVER ALL THE FIXTURES AND TEST ALL WORKING PARTS AND PUT EVERYTHING IN GOODWORKING ORDER. ALL FIXTURES, INCLUDING TRAPS, SHALL BE THOROUGHLY CLEANED AND ALL PARTS PUT IN GOODWORKING ORDER.b. PLUMBING CONTRACTOR IS REQUIRED TO CLEAN THE DRAIN LINES PRIOR TO TURN OVER.c. PLUMBING CONTRACTOR SHALL PROVIDE REDUCED PRESSURE BACK FLOW PREVENTION DEVICE ON THE MAIN DOMESTICPIPING CONFORM TO SECTION 608 FBCP (6th EDITION).d. CONTRACTOR SHALL PROVIDE BACK FLOW PREVENTION DEVICE FOR DISHWASHER, ICE MAKER AND SODA MACHINE PERFBCP (6th EDITION) SECTION 608. FOR D.W. APPROVED BY ASSE 1001, FOR ICE MAKER APPROVED BY ASSE 1024AND FOR SODA MACHINE SHALL BE APPROVED BY ASSE 1022.1. IT IS THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO REVIEW THE PLUMBING PLANS ANDWRITTEN SPECIFICATIONS TO BECOME FAMILIAR WITH THE FULL SCOPE OF WORK. IN ADDITION, THISCONTRACTOR SHALL COORDINATE WITH AN OWNER PRESENTATIVE TO FULLY UNDERSTAND ANYREQUIREMENTS NOT SPECIFIED HEREIN WHICH MAY CONSIDER PART OF THIS CONTRACT. THE PLUMBINGCONTRACTOR SHALL VISIT THE SITE AND NOTE ALL EXISTING2. CONDITIONS, AS WELL AS ALL CONDITIONS TO BE MET. LACK OF THOROUGH UNDERSTANDING SHALL NOTCONSTITUTE AN EXCUSE FOR ERRORS OR OMISSIONS, NOR FOR A REQUEST FOR EXTRA COMPENSATION.3. THE CONTRACTOR FOR THIS WORK SHALL CAREFULLY INSPECT AND ACQUAINT HIMSELF WITH EXISTINGCONDITIONS IN ORDER THAT HE FULLY UNDERSTANDS THE WORK REQUIRED. HE SHALL FIELD MEASUREAND VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE PROCEEDING WITH THE WORK.4. ALL PLUMBING AND GAS INSTALLATIONS SHALL CONFORM WITH THE FOLLOWING CODES AND STANDARDS:a. FLORIDA BUILDING CODE - BUILDING (6TH EDITION) 2017.b. FLORIDA BUILDING CODE - MECHANICAL (6TH EDITION) 2017.c. FLORIDA BUILDING CODE - PLUMBING (6TH EDITION) 2017.d. FLORIDA BUILDING CODE - ENERGY CONSERVATION (6TH EDITION) 2017.e. FLORIDA BUILDING CODE - FUEL GAS (6TH EDITION) 2017.f. FLORIDA FIRE PREVENTION CODE (6TH EDITION).g. NFPA LATEST EDITION.h. ASHRAE STANDARD 62.1 (2013)i. NATIONAL ELECTRIC CODE (2014)5. PIPING LAYOUTS ARE DIAGRAMMATIC AND INTEND TO SHOW GENERAL ARRANGEMENT, SIZE ANDCAPACITY. ALL OFFSETS ARE NOT NECESSARILY SHOWN. CONTRACTOR SHALL ARRANGE ANDCOORDINATE THE WORK, FURNISH NECESSARY OFFSETS, VALVES, VENTS AND FITTINGS TO AVOIDCONFLICTS WITH OTHER MECHANICAL AND ELECTRICAL SERVICES AND WITH STRUCTURAL ANDARCHITECTURAL ELEMENTS.6. PLUMBING CONTRACTOR'S WORK SHALL INCLUDE ALL WORK AS INDICATED ON THESE DRAWINGS.7. ALL TEMPERD WATER PIPING SHALL MAINTAIN A MINIMUM TEMPERATURE OF 110°F. HOT WATER OF 140°FFOR DISHWASHER AND (3) COMP.SINKS.8. COORDINATE ALL PIPING ROUTING WITH WORK OF OTHER TRADES PRIOR TO INSTALLATION.9. VERIFY INVERT ELEVATIONS AND EXACT LOCATIONS OF SEWERS TO WHICH NEW SEWER LINES ARE TO BECONNECTED BEFORE INSTALLATION.10. INSTALL ISOLATION VALVES AT EACH DOMESTIC WATER BRANCH TAKEOFF AND INSTALL UNION AT EACHPIECE OF EQUIPMENT, FIXTURE AND APPLIANCE SERVICE POINT CONNECTION. PER FBCP (6th EDITION)SECTION 606.1 AND 606.2.11. INSTALL PRESSURE REDUCING VALVES ON BRANCH LINES SERVING FIXTURES AND/OR EQUIPMENT, WHENWATER PRESSURE EXCEEDS 60 PSI.12. INSTALLATION OF MEDICAL GAS SYSTEMS SHALL BE COVERED BY NFPA 99. MEDICAL GAS PIPING AND SYSTEM DESIGN IS NOT IN SCOPE OF WORK.BRANCH CONNECTION SHALLBE OFF TOP OF CW SUPPLY PIPEISOLATION VALVECWTRAP PRIMER - LOCATE IN MECH. RM. ORAS SHOWN ON PLANS. SEE NOTE 21" PRIMER TUBESEAL PIPEPENETRATION AT FLOORPIPING LOCATED BELOW SLABSLOPE TO FLOW BY GRAVITYFLOOR DRAIN WITH TRAPPRIMER CONNECTIONFINISHED FLOORNOTES:1. TRAP PRIMER SHALL ONLY BE USED TO SERVE SINGLE TRAP. PROVIDE DISTRIBUTION UNIT WHERE MORE THAN ONE TRAP IS SERVED BY TRAP PRIMER.2. IN FINISHED AREA, ROUTE PIPING WITHIN WALL AND LOCATE TRAP PRIMER ABOVE ACCESSIBLE CEILING.3. ALL INACCESSIBLE PIPING, SUCH AS PIPING BELOW FLOOR, SHALL BE SOFT COPPER WITHOUT JOINTS. 4. ALL OTHER PIPING SHALL BE HARD COPPER WITH SOLDER JOINTS.COLD WATER MAINTRAP PRIMER DISTRIBUTION UNITWATER SUPPLY LINECHROME PLATEDESCUTCHEONSTUD WALLWALL SHEATHING1X BLOCKINGEARED 90° ELBOWSILICONE SEALANT ATWALL PENETRATIONQUARTER TURN CHROME PLATED BALL STOP, VERIFY CONNECTION TYPE & SIZE W/EQUIPMENTFLEX CONNECTION BY PLUMBINGCONTRACTOR UNLESS NOTED OTHERWISESEE PLANSTEEL OFFSETWALL BRACKETCINCH ANCHORSCINCH ANCHORSINSERTSANGLEANGLEU-BOLTSU-BOLTSU-BOLTSU-BOLTSTURNBUCKLETURNBUCKLEWELDED STEELWALL BRACKETADJUSTABLEPIPE STANDTHRU-BOLTEYE BOLTSI-BEAMCLAMPSWOODJOISTFLOW BALANCING VALVEWATER HEATERFIN. FLOORHWVBCWHWCW SUPPLYPD3/4" FULL SIZE DRAINRVASME TAP RELIEF VALVERELIEF VALVE DISCHARGE TERMINATE OVER DRAIN PAN WITH VISIBLE AIR GAP2.0 GALLON THERMAL EXPANSIONTANK OR AHJ APPROVED CALIBRATED RELIEF VALVE DEVICE. TERMINATION OF DEVICES SHALL BE APPROVED BY AHJ.AQUASTATHWR105° HWRRECIRC. PUMPTHERMOMETER (TYP)(3" DEEP & 12" HIGH BASE)GALVANIZED STEELOVERFLOW PANMOP SINKWALLPLUGGED TEE W/CLEANOUTCHROME WALLCOVER & SCREW MAY EXTEND AS A WASTE OR VENT. REFER TO PLANS.FLOOR LINE1/8" BENDBALANCE OF PIPING SAME AS CLEANOUT TO GRADEREVISIONSPROJECT NUMBER:ARCHITECTURE, DESIGN & DRAWING SERVICES# AA 26001108BRIAN P. FREDLEY, ASSOC. AIA, PROJECT MANAGERDALLAS B. PEACOCK, AIA, ARCHITECT# AR 0009706207 FAIRVIEW AVENUE, DAYTONA BEACH, FL, 32114PH: (386) 257-0502 FX: (386) 257-1050E-MAIL: bpfdesign@cfl.rr.com WEBSITE: bpfdesign.netDATE:SHT NO.ARCHITECT'S / ENGINEER'S SEALSCALE: AS SHOWN#1325 S. Bumby Ave. Orlando, Florida 32806PH: (407) 896 7411 / FX: (407) 896 7412EMAIL: epgroup@att.netCA#8126MTF2003903/19/2020CURALEAF ATLANTIC BEACH - INTERIOR MODIFICATION MEDICAL MARIJUANA FACILITYP-5PLUMBING DETAILS & NOTESGENERAL CONTRACTOR: T.B.DPROJECT LOCATION: 763 ATLANTIC BEACH BOULEVARD, UNIT 1, ATLANTIC BEACH, FL 32233OWNER/DEVELOPER: : CURTIS BARKMAN, DIRECTOR OF PROJECT MANAGEMENT, PALLIATECH, INC., 301 EDGEWATER PLACE, SUITE 405, WAKEFIELD, MA 01880 PH:(781)451-0160FARSHAD ANTIKCHI, PE 72998NTSP-52FLOOR DRAIN WITH TRAPPRIMER DETAILNTSP-53TYP. WATER SUPPLYCONNECTION DETAILNTSP-55TYPICAL PIPE SUPPORT DETAILNTSP-51ELECTRICAL WATER HEATERW/RETURN DETAIL.NTSP-54WALL CLEANOUT DETAILPLUMBING FIXTURE SCHEDULE