Loading...
Exh 8A.....m ~, ~~r _ 8A June 26, 2000 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Completion Report of 1999 Water System Improvements Project and Approval of Final Change Order Bid No. 9899-26 SUBMITTED BY: Robert S. Kosoy, P.E., Public Works Director ~~ DATE: June 15, 2000 BACKGROUND: The project to replace existing undersized water mains at various locations throughout the City is now successfully completed. The project was designed by the Smith & Gillespie Engineers, Inc., and bids were received on July 21, 1999. The low bid was awarded to the construction firm of Gruhn May, Inc. of Jacksonville, Florida for $639,349.08. The final construction cost for completion of the project is $615,389.27, which results in the project being under the currently approved total by $23,959.8 L During the work, every effort was made to lessen the impact of the construction on residents, and complete the project under budget. A great deal of credit must go to the City's own resident inspector, and the City's water distribution crews who were on site during the entire period. of construction, and proposed many time saving ideas to improve the project. BUDGET: The City Commission awarded the project to Gruhn May, Inc. for a total of $b39,349.08 on July 26 1999. RECOMMENDATION: Approve the Final Change Order for a credit of $23,959.81. ATTACHMENTS: 1. Final Change Order 2. Finallnvoice REVIEWED BY CITY MANAGER: ~: ~, _ - 8A June 26, 2000 CHANGE ORDER Contractor: Gruhn May, Inc. Owner: City of Atlantic Beach Date: 6/15/00 6897 Phillips Parkway Dr. N. Jacksonville, FL 32256 Attention: Mr. Gordon Gruhn City Bid No. 9899-26 Project: 1999 Water System Improvements Project You are hereby requested to comply with the following changes in the Contract Documents: I. Revised Scope of Work DECREASE INCREASE IN IN CONTRACT ITEM UNIT CONTRACT PRICE $ NO. DESCRIPTION QTY UNIT PRICE $ PRICE S _>;;,. 1 Delete Bid Items Not Utilized ''~yX' y'~......:fi.: ;;... ..Y.. TOTALS '~$3~?r~~~. NET CHAN E IN G CONTRACT PRICE €:~< 3 The final contract price to date therefore is $615,389.27 The date of the Final Inspection was June 6, 2000. Accepted By:!s6R v+r (s. G.t ~~.r Contractor Approved By: Owner . Date: ~/~y/zaaa Date: r-, J 1 ~ GRUHN MAY, INC. 6897 Philips Parkway Dr. North Jacksonville, Florida 32256 Owner City of Atlantic Beach ATTN: PUBLIC WORKS 1200 Sandpiper Lane Atlantic Beach, Fl 32233 PRQGRESS BILLING Application 7 Period 06!07/2000 Job Location A.B. Water Line Improvements ATTN: PUBLIC WORKS Application For Payment On Contract Original Contract ...................................... 6 3 9 3 4 9. 0 8 Net Change by Change Orders ..:............. ` - 2 3 9 5 9.81 Contract Sum to Date ............................... 615 3 8 9 .2 7 Total Complete to Date ............................ 615 3 8 9 .2 7 Total Retained .......................................... Total Earned Less Retained .................... 615 3 8 9.2 7 Contractor's Certification of Work The undersigned contractor certifies that, to the best of the contractor's knowledge, the work on the the above named job has been completed in accordance with the plans and specifications to the the level of completion indicated on the attached schedule of completion. Contractor ~/ Date ~ ~~ -~_~~~~ '~'~ g~~27dR~ ~~ ~G~ L/f(~/?~JvL7 Less Previous Billings .............................. 511415.7 7 Current Payment Due ............................... 10 3 9 7 3 .5 0 Balance on Contract ................................. Terms: Invoices are due and payable 1 month from the date of invoice. All overdue amounts will be charged a service charge of 18.00% per month. Please make checks payable to: GRUHN MAY, INC.. ~,, Thank you for your prompt payment °o 0