Exh 8C June 26, 2000 ;:°~. _ r CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Milling and Paving for the Public Works Department SUBMITTED BY: Robert S. Kosoy, Director of Public Works ~~ DATE: June 20, 2000 BACKGROUND: The Milestone Company was awarded the bid for milling and paving of several streets for the Public Works Department. This work has been completed, and City staff has been very pleased with their workmanship. Their original bid came in at a total of $235,663.17, well under the budgeted amount of $403,000.00. Many streets were patched during the 1999 Water System Improvements Project, and some of the remaining funds can be used to mill and pave these areas. Staff contacted Raymond Grode, Division Manager with Milestone Company, and he agreed to honor the bid prices for additional milling and paving. The Public Works Department is requesting that the following streets be milled and paved: Live Oak Lane from Selva Marina Drive to Saturiba Drive. 14th Street from East Coast Drive to Beach Ave. Club Drive from Beach Ave. to Ocean Blvd. Robert Street from George Street to Mayport Road. Lewis Street from George Street to Mayport Road. Jackson Road from Francis Street to Mayport Road. The contract rate is $4.13 per square yard. There is approximately 9,954 square yards, for a total cost of $41,110.12 to mill and pave the above streets. The contractor originally included East Coast Drive from 12th Street to 15`'' Street, Beach Ave. from 8"' Street to Club Drive and Ocean Blvd. from Club Drive to 10th Street, but these streets are candidates for drainage improvements within the next five years and were eliminated until the other improvements are complete. BUDGET: This work will be funded from Account number 130-5002-541.63-00 in the Road & Streets Division. The amount budgeted for FY99-00 is $403,000.00, and even with milling and paving these additional streets, we will only have spent $276,773.29. RECOMMENDATION: Award the above list of streets to be milled and paved by The Milestone Company. ATTACHMENTS: 1. Contractor's Proposal 2. Map REVIEWED BY CITY Jun-20-00 02:42P Milestone Co Asphalt Div 904 696 8030 .' MR. PHIL NODINE CITY OF ATLANTIC BEACH 1200 SANDPIPER LANE ATLANTIC BEACfI, FL 32233-4318 RE: REVISED CONTRACT EXTENSION BUDGET 6/20/00 The Milestone Company -Asphalt Division will honor the unit the uait rates presented in the Atlantic Beach Milling and Paving Contract (P.O. # 22131) with the consideration that the specifications are consistent with the original contract. The Unit Rate and Quantity Breakdown for the proposed 6 additional streets is as follows: (Estimate pending final f eld measurement) CITY OF ATLANTIC BEACH ADDITIONAL STREET PAVING STREET NAME FROM TO AREA S.Y. LIVE OAK LANE SELYA MARINA DR. SATURIBA DR. 2,463 14TH. STREET EAST COAST DR. BEACH AYE. 1,480 CLUB DRIVE BEACH AVE. OCEANBLVD. 1,015 JACKSON ROAD FRANCIS ST. MAYPORT RD. 1,846 ROBERT STREET GEORGE ST. MAYPORT RD. 1,506 LEWIS STREET GEORGE ST. MAYPORT RD. 1,644 9,954 Contract Quantity in Rate S.Y. Square Yards = Extension ~s $4.13 9,954 ~ 41,110.12 Please review this option. If further clarification is necessary, feel fine to contact me. P_02 8C June 26, 2000 l Grode Manager ~~`/N~q~'~J ~/~ LQC~T ~ d~lj ~~1..~~IV~ ~ ~V ~~ ~ ~~~ ~i L ~..~ ~ June 26, 2000 F tll i ~-ND P~Vl~G Q GRANDE DRIVE ES < 'k~ si7 p.- ~~ N I _ LAKES CIRCLE E3 1~.~ B ~~-~ - N4DERA COURT E6 Z FM' Y !'R"". ~" ~. F A~~ MARINA CIRCLE F3 ~ "T ° ~' S ` \ A ORr - __ ~ ~. ° Rte-' Y~5 MARINA DRIVE Ei ,~ ~w~. • - AE ROAD E2 r r Y -- ~ - ~iH'N 57R¢T' 'Yk^~~ ~R iLE LAND? NG ROAD F7 ttAS vARK ~ A' a.E REACX COURT F7 ~ ~ T. ~ ~ ~ - -~ ! -~-~ *~»~ H-E REAM DRIVE F7 FAIRWAY ~ ° i .A HGVLEVARD Y. D6 STREET FL VILLAS DR. ~ C ; ~ !~, t ~, i ~~'., . r DRIVE E2 ~ N ~ y ~ ~ ~ £ y~ ;,~ CDI~ nc 3 1 ~ &a ' ~ ~ ~" RDAD nz {^ O~~A~,u+ ING TURTLE COURT E. E7 5 J ~ """~ - ' 7 IuRH~! COURCDURT v. E2 ~ ~ n w+ z ~A . .Y ROAD C3 W l I c 2T STREET HI ~ F" 1{I ~ ~ ~' _ STREET H2 Q ~'- IVANT AVENUE E1 h V DRIVE EI ~ d wRU!Ceu~'as6 ~ ME ~ ` } ~ 4 VERDE DRIVE ES ~ ~ ~ ~ _ Y ROAD D2 - -•:. - _ - STREET H1 CJ .'~' - 1~ r - ,IRRCLE D6 ~ T77M STREET ' 17M SL ~, _ a _ NORTE CIRCLE E6 ~ ~ ~~ ~~ _.: .,, ' . ~' ' - TSSTREET H3 - a - i I W LANE D3 ~ ~ J s ~ c ~ ~~ f i ^ ~ ~ - RROAD DI ~ ~` ?LAZA A3 ~~'tJ) NG LANE D2 - ~ ~ o ~ z s . Ac~E~ FNT o ~~' $ ~ a ~ ~ A.rrs ~ . ~y ~ ~: ~. o ~ ~ .!4 ~y ). S.G~ - vAV ~ 8 A . CORPORATE LI IT .:.: ~^ 1 fA~ - MUflM ROAD r M R t~ ~ ~ •.`. _ .. ( l6TM STRELT ~~ -.iMK51DE DR R Cd1NiRY G.UR LAND ~,V _ GvrL'R CWUUxrtt axrtR I LINK4DE CDURT N ' i~ STREET ~ d TSTr1 OUDLLY STREET ~ ~ ~ '~ ~ -,' t < I c ~. SINU0N5 ROAD S H ~ ~ LRYC5IDE DR ~ >~ 6~ ~ ~ l 14TH <~•.'~ LEw15 STREET I p 1 ~ o ~t .~ ~ _ . N Opq ST r I ~ 1 ~ < Ys Z~ - _ _ DQIMA.PS S/D ~ _ ~ °2o- N' m ~,.__,' - .. wALr~R RoAO I o s ff Ili ~ ° ~ -. 1 I 7 2 ~~ y I T3N ~pgT -- EDGAR STR / STANLE'I ROAD v~ ' ~ '`~ O u i rACUtt Ax fApr ' ~^F.T izTH STREET / JACKSON ROAD JACKSON RO 1 1 I o UNK9DEIDRrVE ~ I c ¢~ I I I S : ' g~ Z I I I W ; d FT I ~~ __ $ 11TH ~$IRE~ - ' _< / ARDELU ROAD 3 ~ ~ I ~ 3 ~ " 11T1M STREET - < i I O ~ AT{Mm~ ZI I ~ I ; ~ ~ "' Y ~ xT xnl 9 ~ _~ .. '~" --.__ /y/~-- _e OONNER~ ROAD ~ ~ .~- ~~ Nry ~ -~ ~ tOiM SIRY --~~ --- . T . ( 3, I ~~ ~ ~~ ,~~ ~~ ~~ SE4.VA LAKES a 11 ~ ' 1OTN STREET . •$/ ~~T ~ I S.AIIFrS{I DRIVE R I t ~ s ~ p~ :~•s •. / ~yS~ 3a' I ~ ~ SELVA LAI~"~ o ~ sT~l sntEET • ~ ~ ~ a .i I AMHERJACK (qNE ~y ~ RwG,N KEY Y 1 "~ ~ - / ~m`3 I ~ HoNrrA ROAD ~ ~ 4A ~ ~+'~ aR I ,,.~ ~ ~ 3; I %AZA ~-• ~- ® gill STREET _ _ 1_ T-~ _ _.- ""_ _ -' A Pala ..., rncET - .. • ~~ MAYPORT ROAD WATERMAIN IMPROVEMENTS ~ ^ ~ ~ ~ ' , ~ CITY OF ATLANTIC BEACH 6 °4 att a- ~ Anaxnc eEaa+ 0 e~w an a: . NEPTUNE BEACH o ~ ~ a a~ACH azw att of r n a ,ua~savHUE D ~ a BEACH Z n ~~ Au D ,~ Z PCNni VEO eEAa+ RA _ ~ u INDEX OF SHEETS COVER SHEET 1 PLAN do PROFlLE OF STA. 30+50.00 - 31+80.00 2 PLAN do PROFlLE OF STA. 31+80.00 -33+10.00 3 PLAN do PROFlLE OF STA. 33+60.00 - 33+10.00 4 PLAN de PROFlLE OF STA. 34+50.00 - 35+50.00 5 PHASE I. M.O.T. PLAN g ~ 7 PHASE II M.O.T. PLAN 8 do 9 POTABLE WATER DETAILS 10 GENERAL NOTES it r ~ ~ CONNELLY & WICKER INC. CONSULTING ENGINEERS 1711 S f/fnl STREET IA48B EYERAEO COAST PARKIYIY ,NGKSAYNLLf BfACN, RAADA 31150 OfSRN, RLWroA J151O (904)19-7995 • fax (9os)1I1-n1e (9Of) 8J7-f151 • fAx (90!) d17-781X APRIL 27, 2000 CWI JOB N0. 0001-06 o. i 1 7~ \~ . \~ . \~- ~ \~ \\ N N ~ ~ ....-~~~ 0 IF01 TC7.~~ ~ari-r5o1 SDUTR FLEX P1PE fBl ~-~. I I, u .ul vlllL/IJ/ 1 F - - i CA 0 5 r oo r 50 1. o ER T, R~"b E K Rde~ted For ContbucGoR -' / ~ Co ell & Wi I k P/~I Ral . . ~ nn c er nc. y , MAYPORT ROAD 0001.06 B.C IA B, ~ Consulting Engineers WATER MA I N I h~'ROVEMENTS . c~Mw STA 30+50 00 TO 31+80 00 B E K TNrDro.iy6lMprogrlrofCawlhiYk4rlne PNEPAAEOFOR . . . S~Wr . . , R w:~a~arca~caac~w~~av Jacksonville Beach, Florida CIiYOFATLANiICBEACH i,aoo EEK RrEllirolle6eurdrnrryetMrpa(MNd Desiin, FL• Cashiers, N. C. ~1f1 41o be rclorad an rpwrL No. Uilo Rerhion 8 Rr E inra APB I l 27, 2000 EXISTING WATER M N TO MAIN IN SERVICE UNT1L WA LINE 1S ACCEPTED FOR ERVICE:~ .XISTING W TER MAIN THEN HALL VALVE BOX o ~~ ' G lNSTAIL 2 VALVE W/ VALVE W/ x 150 TEE, 250 GATE X AND COVER, 150 GATE k AND COVER, 9.SM OF 150 aa~E ~l m G.4G PAr ~ 'g ~ I II I PROPOSED BELL SOUT PROPO D BELL SOUTH I ~ C I INSTALL x200 50 TE ' IN ~ t 50 PAIR CABLE fBY 0 NERS1 50 PAI CABLE (BY OTHERS) I i VALVE W X AND ER i I z I~ ~ o cu., ~o.rocfoae END LYOVER BRIDGE coNFUCr No.3&4 0 I ~ ~ 200 car aaE w x o~g I ~ ~ I~ ~ I I ro STA. 2 +89.121 ~ RAMP 200 fN57ALLn,250x 150 TE , 2DO WATER MAIN ~ ~ I O Z00 D I E E 4CON T ~ i ~ I EXISTING FIRE H/ ANT f0 4M OF 150 D I P! 80TrOll=2.15 I ~ . . , TO EX/S7 200 WA R MAIN ~ ° ~ ~ ~ i C ; ~w II ' ~ . . . T / ~ RCP ZQRM ~ uH , m 2 m ~ oNf ~ PROPOSED BELL SOOT ~ ~b I o ,`~ PROPOSED ELL SOUTH 150 GA E VALVE W X TOP=L39 ~ ~ ~Q I ~ sroRr Y OTHERSJ n AND COVER, 150 3-WA ~ v7 ~ EXl ING 200 IT VAL wooo l; 400 I PIPE fB I II ; ; h f11 4 PVC (I m W ~ w sefo d~' ' f1J 1200 PAI CABLE FIRE HYDRANT I ~ ~ TO REMOV I 2 FLICT N o. CON I I ; a-.I fBY OTHER II I ~ I ONE STGPo I 600 RCP STORM ~ " ~ INSTALL (21 150 45' 8 ND h roNC. Btac I 70 8E PLUGGED 8 emmrNc BOTTOM=1.70 250 D.1. WATER MAfN ~ ~ ;I~ m ; ', I WITH AND A OUT 8Y OTHERS ANDONED STRUC LIRE TO BE REMOVED BY O HERS cN " Ila ~ EXISTING f r0 8E RE RE HYDRAN PROPO D BELL SOUTH OVED TOP=1 24 I I f90 0 1 E (STING fPE TO 8E REMOVED BY OT ERS i $ , 50 PAR CABLE f8Y OTNERSJ . I __ "' ~ 0,40 PAW . NECES NE R W ARY. TO AVOID CONFLICTS - ~ II I ~ ~ SIGN ue ~ r.a L FENCfEXlS / LI " ~`~ coN. aacf 1 B LONG $lDEWA r Sr coNC POtE 74,5 W/ IGHr OF 900 RCP cork POtE r SIGN 1 2 CC FENC • ' '~--~ I ~ ` . . w/ ucHr ~ g I 1.4 OF 900 - - _ - . E -- Hr ~ / ......... ... ....... ~ h. B ...... ... ....... -oe.... .._ .................~ ........... ............. _ .-. ......... .. ... ,,,, .---... ... - ---- --.. ~~---- - ..........---- --- T 600 !PE BT --- --- ---- -- aT ------ -- - BT PI E TO - -- B1 - - ---- -- ----- ' BT- ~-- ......Br•Ir2oPPa3 ----- _ - -~- ~. - ~ °• ~=: - ~ - . .. 1 0 p :. ... .. ..... ..e5owu...--aIsIGN.............. .N D.i:'WAF R'MlJN...........25owN...-.. . ...--- --- - . - - - - - - - - -~ - - - - - - II -~ ~- ---• -~••-z _ MH - - EOU w - - ~TFft=RS-TO y~€MBVE-Ct7R~INtET~OP- - - - - - - - - - - 2sowN. _. lGN....... .. ~H~Z~ddGzlCf:W1FH•:MANNOLf:TDP.: - ~_-.- ~v.RCe. ...:e~i-izoab' - - - - - - _ - - •- - ..~. _ _ _ _ __ w S CTURE T~ BE REMOVE EXISTING ! AI RE VE ~ Y TREKS 150 WATER MAIN VALVE INSTALL 250 45'-BEND ~h o ~ `~ ~ ' TO BE WITH GR GE`~ T &1t & ~ILLED 8 2+QQ TO BE PLUGGED W/ GROUT ~/ OTpER5 AND Y OTHERS AND ABANDONED (2 .SMJ I INSTALL f2J 250 45' BENDS 833+00 X~~ ~ BANDON (~ OM1! PAVEMENT REPLA EMENT ~ 800 ~ I N 20'39'14" E ~ 30. OF 450 RCP STRU RE TO BE REMOVED BY OTHERS o. m I I TRU TURE TO BE R VED ~ ~ a y m I I 232+Qp ~ ~ pORT ~ N 20'39'14' E STA. 832+54.30 ~ 800 33+DO Q• I=~ =1 ~I m CONCRETE BARRIER WALL ~ STA. 83 +76.47 ~ 800 ~ I ,~ a O a~' z p 25.6 OF 490X770 RCP STA. 10+00, W. 3RD ST. EXISTING WATER MAIN r0 RENAIN 1N SERVICE NTIL NEW WATER LINE ~ ` - ~ - - a `~ ~ m ~ W 2ND ST STA l0+00 00 I I m ~ RAMP 200 ~ ~ ~,~ o N 20'39'14" E 15 ACCEPTED fOR SERVICE, EXISTING A ~ . . . . , N m ~ IOOmm PROP SED BELL SOUTH FIFX PIPF (RY OTRFRSJ @ 90o END APPRGA N SLAB (mti°Q STA. 731+95.1?1 ~ RAMP 700 ~amm N 20'39'/4" E MAYPORT ROAD X 0i'R'"• Released Fa ComUutGon ~ Projat Rat Drairp B.E.K. I /~ y Connelly! & Wicker Inc. MAYPORT ROAD BBOI.ae ~'"" Consulting Engineers W V TS M B.c.K ar ~ ATER N I N I tub RO E ~ N ~idid iNoOrrwiy4lMPOwrholtaurn7~tltdorin~ PREPARED FOR STA. 31+60.00 TO 33+10.00 6aWt B.E.K, ,n• n net a e. ryrodocN y cepiod'n.AON p in Jacksonville Beach, Florida Irioo o.c, prL 1t4noUeMuoEaugelMrpgoelad Destin, FL Cashiers, N. C. CITY OF ATLANT I C BEACH wl„ 9.E.It. ~ aen,.lan,aanaw+~ Ra o~l~ Ramon 8 Re E iwta APRIl27, 2000 SMeI 3 _ol 1 ' NE sroRr WC+DD NFCICT No. 5 / 81.35 T 0~ D.l. WATER LIMN TOLL=2.b i i ~ I I F m m I I I ~, I o B . 0.4o POSED ELL SOU7 PAIR C fBY 0 0 F 600 RC ro Lv EXISTING 0 BE RA1S .--- HE 1 YDRANT 150mm O --~ ~ pRppO 50 PAI ro RO 4" ED BECC S TH I CABLE OTHERS ~ D BELLS PVC m I I I I ( l I I I I I ~ I '~ 3 I ~ J I I EXISTING flRf HYDRAN ro I INSTALL 250x 150 TE , ~ ~ G~VALVE W/ ' 0 2 10 X ® ~D ~ 5NE0 CONFLICT ~ ~p BOTTOLI=! 150 D.I. 6 o ~ ca ER LIA/N sraRV c. e~ocx ur~DiNC ~ 74. - I ~ I ~ ~ I I ,~ I -~ ; ~ ' 9 RCP , s o. rn .30 N HST 1 AT E x VALVE W/BOX ILI OF 150 D.l. P 'BENDS, CONNEC 1 E, 2.4 .7 - 0 (Il (BY 0 PAJR C ( • THER I ~ WoaD PoLE i I I ILf OF 150 DJ. PIPE, CONNECT TO EXISTING a l50 WATER LIA1N a ~ g STA. 8 cA ~r~ +9.23 ~ 800 ~_~~ I TOP=1.48 c! FeNC~ 1 2 RE src ~ ~ c cDNC Pam wlr I ~` ~ STA. b DD ~ W. 5TH ST. .,. { r$ T. R/W LINE I SI . . o 19 5 OF 900 R wi ucl+T • - I co NC Po1E Bt - - - - - '~- - - - - - c t . - CP BT - - - - - - - BT - - - - - - - - - ~ , - r ..........: .. BT'Bfi .. ..... ... ............ . . -~.......... - - - - - - - - wi l1GHT ... l_ T-.. BT ...0~5. 5CJ: ?CF::: ~~ .~ ~,.~/..~ ..~.R~,p . 250 WFF L _ . ~ .. ........................... ......... $T 0 - - ......... 250 WN.... . .......... .. ' : - ~ .: FF- ..- .. _ ..... .. ' Lt N'::: NEW ~ ' ' I wATER - ' ' ~= D . s ®- ~ ~ ' - ..6 ..... U 2-0G-PA-)--- - s° / ~ ~1 H 1500 - --- ..~.. . . - R 1 - 1900 PA 1 ~ - 6i . : - :.., ~.~......:.. _..:: _..: _..._ai- 1900 FF~1 •'250'W.V..... ----_ ._---__ - ------ ~ --_.- 1 1 .IN TO ~ INSTALL l21 -__--- --.---- -.- 250 45' KENOS ' ' ' N I OP78'18,25" RT. EXISTING WATER LIMN TO REM AI 833+00 W/BOX AND COVER ~ ~ytr' ~ 'Ty ~~~O,y p ~ CS A f ~ PER FDOT ST D NT P.l. 234+23.551 $ RAMP 200 CNS CL (21 250 45' BENDS ~° A ,vy ~ ~ CCEPTED FOR SERVICE E~75 WATER MAIN TN N SHALL BE ~ B00 ®AR S SEE TYPCCA DETAIL 00'44'00.62" RT. o N 20°39'r4" E N2P57"32"E '8 CONCRETE SIDEWALK m L70 45 ENO,A70 GATE VAL REMOVED r9.5 Of 0 RCP STRUCTURE TO 8E REMOVED BY ~ h ~ ' ' ' 233+00 TO EX TING L70 PIPE W17H~ L70x TAPPING LEEVf ~ N 20 M 39 E ~ 1 ~ RAMP 200 234+00 ~ SURVEY LIAYPORT 3 N 2039'/4" E o 24.4 OF 450 RCP MAYPORT ROAD " " N2f23 14 E "~ 0 -' CONCRETE SIDEWALK 60,9 OF 450 RCP ,~ T BE PLUGGED & TO 8E PLUGGED & N 20°3974" E 89.1 OF 450 RCP FILLED w1rH GROUT V` FILLED WITN GROUT ENO RETAINING WALL BY OTHERS AND STA. 233+70.427 Nt9'22'33°E ~ 900 ' I A AN NE n9 OMI AB N0 0 ED l15. M1 , BE a ' C J AA I BM F P. X CU 0 T P F .W EL 3 99 I I exi ti g de ove n of r in - - - - - -- - - - - - - - - - - - - - - - - - m RO S D R E Ew WA ER M N I 0 C I h 4 0 CP 0 I CA 30, ~"b Relesed Far Comlruclion E.K ~ ~ ~ 35q ,40 Connell & Wicker Inc 1. E 45 . P`p" ' ~'"" . Br~ ~ . MAYPORT ROAD o U i.B6 ` B.~.µ By ~ Consu ting Engineers WATER MA I N I ttR'ROVEMENTS cneded STA 33+00 00 TO 34+50 00 B.E.K iFworwtMblMOreo.rlselCoiwNylwcrurlrc. PAEPAAEBFOR . . . B""' . Q rd:eotleMrpredsedntpied'nwAebrb Jacksonville Beach, Florida CITY OF ATLANTIC BEACH ~laoo R. E.N. prl RNrolda nsa an s~•Nha pofKl ero Destin, FL• Cashiers, N. C. wler b le tK rNand an rrowrt Ne Wle Reviian Br Re E ewer APAIL 27 2000 BAeet 4 of 11 ~:STA B34 v6.29 ~ 800 crruecH % I I I ~ I ~ - --%////////////////~ 1NST CL 250x 200 TEE, I o i I 'STA1~;o+ ~ w. sTrr sr. 2 ~ ATEE VAS G T~X I II "', PROPO ED BE SOUTH 50 P CABL~(B1',OTHERSI -~ ~•, ~ VALV W/BOX ANO COVER, 1 ro I I~ ~: II I~ _ ~' 8N 200 D,1. pIPE, N ', I~; I CONN CT TO EXISTING ~ d II wGbo ~~~~ ~ I I F- p Z00 ATER PAIN ~ °o GAZE ~ - TO AWID EXf5T1 G STORM I ~ ~IN: I ~ ~ `. II 11 uAr~eox SEWER STRIICTU E ~ _ ~ ~ EX/S 1NG F1RE HYDRANT ~ m ~ GNE sraRr I ~ ~ 040 ALM IN TALC 250x 150 TEE, ~ I ~' I I ~ ~1 ~ RESlOENCE 1.8 CONC. SIDEWALK ~ ' ~ I~, IM Of 150 D.I. PIPE, (!J 4" PVCticHr'; ~'~ I '1 m CO NEC7 TO EXISTING ~ (1J 900 p,~E~ BLE ,n ?' K w ' ~ flRf HYDRANT LE 1 I src,N I °, tic r ~ (BY OTHERSI ~~ A~I ~ " ~ ~ e 7NG PccE ~ ~ ' '~- -' ~ I ~ 1 ', sic E IST. R/W L1NE ~£ 4 slc ' ~~. ~i: ~ I` N ~ - - - - - - _ ~ , s, , , cnrv ecx CCNC ROLE .. t~ i/ LIGHT ....... -.... ....-. er ~ .. ......:. . ......... ~..... 1.8 CC FENCE -... pE...... ' - - -' O SGN !~' 1' ~ 0.85 CEDAR ... ._... . gT. ... --- ~ BT. "-•. I ', 8r T~~ -"oE~... _ POLE ~... ~...... P F -~ .._ ... ........pE .... P .... ...e7. F900•PR!'2505VM .................... ..,,, r~. .:-::.: ~.: ~:~ 5 p.. 0 '.:.'8.. °::::: " .. .... W1:f. ... ......: ;f3i (90~ PR 1.:::......... ..1.~... ..~ ...... ...... 250 ~WN-:...... .~~.'.~.. \ ~ ~ ,~ ---- s ..........._. ~ ~~... ai f60 - ---- - BT- ~~'._:........__.... INLE \ 1.5 OF 600 RCP ~ ~ \ i ' lNSTACL~ 2-250 45' BENDS. EXISTING WATER MA1N TO REMAIN °j ~ STA. 835+50.547 ~ 800 = I CONNECT TO EX/ST1NG IN SERVICE UNTIL NEW WATER UN °j 250 WAFER MNN c'v ~ STA. 35+50,547 ~ SURVEY, 1.676 LT. IS ACCEPTED FOR SERVICE, EX15T1 G \ I 835 ~ o H N SHALL BE ~ 3 ~ 800 N 2P57'32" E 35 ~ ~'s ~'~ ~ SURVEY MAYPORT ® !' XIST, R/VV UNE - FO W~//l~1GH'T ............................ ~- ~ V~ .....__ ................ (311600 PRI .. 36+~ CONCRETE 51DEWALK . , N 20'J9'14' E CONST, 60.9 OF 450 RCP o PAVEMENT REPLACEMENT 235+00 ~~ -P PER FOOT STANDARDS \ .9.3.5+00 ~ I I P PO ED GR R W TE M N m exi t! gr a ove 'n ate in 0, ! E IS ING 25 W. TE M} A1N 60 R P C 0i'a"'d E'K' 4 5 Released Fa Canelruelion -' ~ ~ 5 0 Connell & Wicker Inc 5 50 r• ER . 6 4. `'"" °riwn a„ ~ . MAYPORT ROAD oop p ~, ,ob e.c.~ e, ~ Consulting Engineers WATER MA I N I MPROVEMENTS `"""" STA 34+50 00 TO 35+50 00 B.E. K, ThitW"wpBllxaroafr~eawurtMa""fK PREPAAEDFOR . . , sw, a`' Ma.~va~"v~neaero"an.nd"rM Jacksonville Beach, Florida CIT Y OF ATLANTICBEACH ~:eoo B.E.K. OIfLI(ien"IICA"wWMry"IMrpqul+M Dest in, F L ' Cashiers, N, C. u.l" ~ Ie M nlurn.a m np,nl xa GI. n.vnl"n B R" E +ra APRIL 27, 2000 Slnl 5 _ d l l • ~ ~ ~~ ~r~ r>~ anol3o I oasoio aroa i II ~: I (: I I ~' 1 I I 1 II kl~l I '.11 .• I ~+~ ~~ f y'I 3 I 03S010 ~ 11 ;~ I I aaoa o ~.I 3 W ~~.I it ~ ~~ ~WORK AR -..-~ .-.-.~.~ L- 7 ~ . - ° -a ° °- ° ° i ° ° ~ - ` • ~ - ~~ - - . - - -I -~ _--~.-_ .-.n~.-_-Q-- 96.0 .h;III ~ y; • • A • _` ~_ _` ~_ \ / \ / °m ~ ~ „~>~ra,~, \ ~ o an0130 °asmo °roa ` ~ ~ • i ,-- - - ~ ~ Ov3Hv II ~ i ~ ~ ~ j ;" " I AaOM I ~I 'i I ~i i l i l ovoa I~ ; li ill ~ ~ - -~ I ~ Ilal III , i :I I);I I I I II 1 r II ;I I I 1 I I I Ivl ~ II 1 1 1 1 II ~ I I I I I I( I :II I I II I I END I I ~ . fA 133+00 I ~+ ~+~ ° Y~- ~ ~ = - - --- ~ / 34 f ~ I : i I 50.0 • • • e ~ •a'01• • • e • • e • • • • •~ • • • s • • • • H'm 4 ~ I I I ~ I I, I ~ I p i 0 5 25 _ ~rl 117,'1 11 , ~ /® III , >laohv . I I : ~ ~ END I 1 .' II ~I III OAO WORK ( II ovap I¢I II ilil I IIIJ I.~ 1 al I•~u ` II ~ - I l a II I I ~1 J 11;11 ~ I :~ ~ I II ~ ~~~~~ a ;'011 ( II _ ~ ~~: ~~•~ ~ti ~l ~ ~:Il~~ 1 v, ~ 1 I ; II I' I i ~ ~~ I ~~ II , . I: i 50.0 ~ x ~1 ~ ~ ~ 60.'0 _ L .. R-}. - .. . , ... ., ..................- ---__......s~---...._... _ ..o... ---- ~____ - -1s ,..._,~.M1 ° - ° - - I °- ° °- - ° ° ~ ° ° ° _° ° o °~ ~ h •- • h W • • e. • • • ~~. e 0 ! \ aim i ~~ \ ~~''~^^ ~° • ~ \ V 7 F 1 _, - ~ - r /~~~ ~ ~ ~ YPORT ROAD IS.R. AfAJ ~ I ~ I TEMPORARY CURB WITH 1 LEGEND ruBC1tAR PosT ~ T.5 o.c. ~ ;, ~ ~' (TYPICAU '" ~ ~~ ® WORK AREA 4 I I I1c~ [] I TYPE !1 BARRICADE OR B^ I ,~ 8 DRUM W/TYPE 'C STEADY ~ I I `• BURNING LIGHT ~ I p I~~}-. p TYPE I OR TYPE ll 8ARRICAOES OR VERTICAL PANEL OR CONE -•- DIRECTION Of TRAFfIC (FOR INFORMATION ONLY! .. ~• =~~j~=--==~~---~=--- . ~__1__ ~._~,i~ IL ~~ ~• ..~ i I ~ ~I ~ ~ I , II r '° ~I '~I i. ? N II I III I :~I L •11- I #•~ TYPE m BARRICADE W/ fLASHiNC ucHr WAI^•d Rdessed For ConslrucUon I 11 C ll Wi k I °`pN ' ~""` B.E.N. ~ yy onne c er nc. & MAYPORT ROAD o 0 ,.06 a'"" B Consultin En meers L 9 9 WATER MA I N I MPROVEMENTS B.C.Ai Y PHASE I M.O.T. PLAN TM prwiy b IM nw•r~t ar c•.~•y - wtlx i m PRE PARE B FOR 5~, B.E.K. rdAn•ImMr•p•d•eMarmpwd'e•hderi• Jacksonville Beach, Florida TY F AT ANT Irlooo o~c• B ~,, „„,~,,,,,,„,,~,„,,,,~„~,,,,•, Desiin, FL• Cashiers, N. C. CI I C BEACH O L a,„ .E.K. YUbta~uMaonr t Na 0•r• Reri•im Ay a. E :ra APRIl27, 2000 Snnl 6_N I l Ilu I~~I ( I I III I I ROAD WORK I I Ipll I III I ; ~~+ Irl 1) ; I III i 1' r I~,~. I I I III;; °11 II II;;~ I ~ I I IIIIII.I~ Ilyl I.III .III I 1111 I I I ~ ~ IIII ~ III I ~ II II I I I I II,II o11 ill ~'~ ~ II ~ I( ( anol3o I I ,i i I I I 1 t; II I I I I I ON3 I I :I I (1 I ~~~ H 10 1"III ~I 11 I I I I I ~( 1 :11 ~ II I I I I I c l I,:I I I I I I I I I I II;I11 ~ I III 03S010 13 Ilu~ ~- -J I,IjI 3111 i I ovoa I : L I J ~./ 1111 I I ~~~ ~~ ~~_ -~~ r 1 ~ti 1 ~ ' B.E.K. a ~.~E ~b B. E. K, B.E.K. W <oa ~"yrQ OYi ~~< I I D:;Q 36+00 ~ I ~ ~ so.o` * - -- --- r----- ~ - ----- ~w ~ ~ z z~~ _ ..~ iW~ - - ~ - - ~ ~.-.-. ~~~ .-:-.:-:-Y- - - Q -- --- ~ ',1...,....~: MAYPORT ROAD fS.R. ALAI 1 I I ~ I ,~ I I 1 I ( I I I ~I 1 I Rdased For Camlrudion (I~' rns Dn:nt 8 !M a"ary ar cem"y a wwr i "o. a! w "N !o b naedueM a coyr! in •h"1" a M oaL n 8 ne! a s x.e en a7 oltw aaNc! ud I I i ~a ~~ 0 5 25 !:1000 I ., 11 I / I LEGEND WORK AREA 8 TYPE I1 BARRICADE OR DRUM W/TYPE "C STEADY BURNING LIGHT 0 TYPE I OR TYPE N BARRICADES OR VERTICAL PANEL OR CONE -- DIRECTION OF TRAFFIC fFOR INFORMATION ONLY! TYPE !!I BARRICADE W/ fLASHING LIGHT Connelly & Wicker Inc. Consulting Engineers Jacksonville Beach, Florida Deslin, FL • Cashiers, N. C. MAYPORT ROAD WATER MA I N I MPROVEMENTS PREPAAEOFOR CITY OF ATLANTIC BEACH PHASE I MO. T. PLAN Piaj"cl Nar 0001.06 Snhr 1 11000 Ddu APAIL 7 a~~ °~ i / ? i4 3 ~ 5 O ~~, 'I ~ ~~ s ' >- ~~ y a ~, /~, ^\ ~~ 30 ~ .` -' _-, I \`~ ~ ~~ J~ ~~ i i w_!i ~ Y ~ ~ Z~1 ~1 ~ I ~ / w aI I '. i °~ I r~ L 0 ~ __ ~ ~~ Y• 1, m s. ~,,, l t ~ 111 .*"' SA Qj60 ~1~ 1 ,~ ~1~4~t 139 L i 1 ~ I ~E 1~~ 1 1, I 1 's I t.~ `° .' ~ ~' l ...~ ~~ o i~_~~I a ~'- ~ I `~ / ~' ~ ~~~~~ ~ mil/ l . ~ r ,I;. ~ ~ I~ I t~ ~ I ~ yp~ I I E~POR, ' `' U~ULAf ', ~: I i ~ TYPICAL ,,, I ;,,~I - ro~ - ~" ~ 4 I m .. - ~ -: - -TEMPORARY CURB WITH TU&lLAR POST a T.5 O.C. (TYPfCAU I I §I 'II ~II '. I ~' 41 ;II ,III I all Il ,I.I ,II I ) .I it ~I II ~I .I. II 3 I ~. i~ 32+00 wORK AREA I I Io :.a .--.~7.. ..-.7...---.s_... :.... a ~ - - - - L - -~ ~ - Am ~ _ _ _ , --~~.-..-.-.a. /~~ ~~\ `11 ~ -~ \ \ / LEGEND ` t 1~\ 1,1,1 ~ , 1\ ° : ~ ~ ~ WORK AREA '1 111 ~ ,~~ ~ ~~ •,U " 1 1, °I~' ~ 8 DRUM W/TYPER' ~STEAOI •,~ 1, 1 ~ ''~, N BURNING LIGHT 1 ~ ~ 111 1 1 ~;, 11,~~ .'a p TYPE / OR TYPE I! ,1 11,1 , OR VE CAL PANEL OR CONE ~ ~ ~~~ 1 1 (~~'~, ~~ -- DIRECTION OF TRAFFIC r ~' , `11, ~1 `1 (FOR INFORMATION ONLY) 1~1 1 1 1 •~' 1 ,1 ~~ TYPE 1!! BARRICADE W/ FLASHING LIGHT a~~ Rekued For Comlrucaon /~ ~ ~ Connell & Wicker Inc. B.E.K. y MAYPORT ROAD k~ ~ Consulting Engineers w B. C.LI B, ATER MA I N I h~'ROVEMENTS ~~ Thb pr~hlM pre°erlyd Lawry LLkW lrs PREPARED FOR PHASE I I MO. T. PLAN 0.--.~_, atl a a°t t° E° npodupE a °op1M N MwN r M e.E.K. Jacksonville Beach, Florida °"""`ro1e°iuidani~°'°a'~'°'°" Desiin, FL• Cashiers, N. C. CITY OF'ATLANTIC BEACH R. , N. Y 4 be nlan! en rpanl II Ir' ~ Ir ~~ N II 0 ~r cuRe w~rH ~I ~ II ~ POST p 7.5 O.C. In 3 II ~' I I ! `I ~'~ II oa3HV I I~~\ END aa3Ha HaoM III' ~aoM avoa i, ROAD WORK avoa ~ I~ fl f II III I lk I I I~ II II ~~ • ]` ' • I • I NWORK AREA ~ III° III " I. ~ I••~.~ ~ ~~ I VIII: ~~~~ I I I 1 END ' I ROAD WbRK : I I r-- -- tiaI 2Q9 I ~ ; I :III I •'1QGQ„ - . END oa3Ha qll ,( RDAD WbRK papa P ~i ~ I I II;I~ ~~~ ~ - I Ilu - ~ ~,~,~, . I,II..I I .~ .~ , i i I ~ II ~ I; I i I I i~~II °pl~; l I I Il:Illpl I I I I I~I'rl I I I IIaIII I (u TEMPORARY CURB WITH I .TUBULAR POST A 1.5 O.C. I I a ~~ f~ ICAL) _ 133+00 I ~ I' ~ ~ \ WORK AREA O _ ~ --- -- -- =_~~~- - - - - - ,I~ ^_• - - - 1 •- 9W - - ' - - ~ - ~hlU ~~ -. _- - - ~ - -.~.-_ -.F -..=.=__ _ _= J ~ _ ---- _ ~ MAYPORT ROAD (S.R. A/AJ ~/\~ ~(~ Prgiel Has I aniip oool•os Satyr laooo ai°, a'~h° LT R.~ Emin.n LPGI 19) ~nnn e._.i 8 s I 1 ~. ~~, ' --~ \ ' ob3Hv I I ~i i~; li i t >IaoM ' I :i , I ovoa 1 l , II„ III I I I I I "I I 'III I I I~) I II I I END I I I ill I III :III ROAD WORK ( I I IIaI :li Ili II'II I III I .I I IIII ~11I~ I~ I I I „I :III I I:,l I I ~ I I i i 1, I I I; II I, I I I 111:11 ;II Ili I I Iiil :i iI ~7j ;III o~aHv ~ I I ' ~ ~~I END oyoo~p ~ I ~ OAD WORK ~lw~l IIJ I all~,`~ ~ II ~ _ ~~ ; J I I III I I~~'I ~` II ~ III .I.. II I I, q ,: i t 'IIII :II III I I ~ N IIII III II . II J I I:II II I i a I III TE~fPURARY CURB ITH JTEppPO CU BI 17N N u, TUBULAR POST B .5 O.C ~I TU6U f~OST~01 .5 O.C, i w fTYPIC U ~ II l // WOI~i NRE , i m' I WORK AREA i` •~ •~ _ _ _ A _i _ _ ~W W ~; >"w Z~~ - - - - iW~ - - - - - ~: ~:: i ~~ ~ P; II , ,~,;~ ~ Illl ~~~- lo II II [~ I I II II ~ I 'I I, i., ~ I ,, ~~ ` I // ~ II II Q _ _ \~ rn WORK AREA ~I Ih I~~i I~ I,II I ~~II - ~ * Ili,~- ~I I~~~ - 4 u _ III 50.0 III II II END II ROAD WORK ~~ 36+00 -- 60.0 ~~e~jA,` A __ __ ~ _ A A 9 A 1ATA AAAAAA.AAA AA\ _ ~ .A •A A A 1 AtlA~A~A-A~ - - -i- - F - ~ - - - - - - - >:.~ ~ f „m . ... (('~----~---- 1__„„„_.~; MAYPORT ROAD fS.R. AIAJ Ic_ ~~ ... I I ~ ~ . ~_J -~ ~ ~ I I rEl I III ~ sl ~ III ~ I' I a'p I I i II ' ~ I I --4% - I I ~' I Ifl ~ .~..: - F - -- - ~ - - ~- - 60,0 ~ - ~ - - - - - ---- T- ~ ~ ~ / 1~ 1 `~ 1~ ~ II ; I l LEGEND WORK AREA I ( TYPE 11 BARRICADE OR 8 ORU~! W/TYPE 'C STEADY I BURNING UGNT 0 TYPE f OR TYPE fl BARRICADES OR VERTICAL PANEL OR CONE I -- DIRECTION OF TRAffIC ; ffOR INFORMATION ONLYI ~ TYPE fl! BARRICADE W/ I fLASN1NG UGNT ~.,,,~ B E K Relessetl For Construction ~ ~ Co nell & Wi k I Prgal Nai Oreriq . . . ~ ~ n er c nc. MAYPORT ROAD DDD,.DB gC µ Ay ~ Consuting Engineers WATER MAIN INff~ROVEMENTS , C^'~b PHASE I I MO T PLAN B E K TNeDre:MMlMweowira(CawsiLWdwlnc PRE PARED FOR . . sru. r . . , U eed'smlleberepedwedweopedinwwMaN Jacksonville Beach, Florida CI TY OF AiLANT I C BEACH ~ l:looa B E K pwL IlimlleMueedanerryolMrwolecleM Deslin, fl Cashiers, N. C. alet . . , 'sbM rtlwnea en reount Nn Dele Reenbn Bi A E new APRIL 27, 2000 SMeI 9_of ~ 1 ;z 0® 5 1:1000 -'y°a oYa ~ a v ~ ~ s= a o: 60 .0 -i~= ` Fit •1 FUl LEnCTx OF RPE SEE NO7E ~4 CENIENm AT YABID~ PROPOSED CROSSING' 3S LB~UNOER PAMHG 3d ~ r OEPM YAAIES I N N SEE N016. ~E J6 1tl}I. U NO ER PANNC PROPSEp WATER 1WN FXISIING Ml1IY RPE SRE a TYPE VARES. NLL IENGRI OF YAIDARM BOX OF YWUFACTURERS VARES SEE NOTES RECOMYENOA710N fOR JODm DEFLECTION. PIPE OENTEAED AT CROSSING. t PIPE I SEE NOTES, MA%IYUAI 80X OF YWUFACNRER'S + - SEE NO RECOMMQIOARON FOR ,lONXf DERECIION. YIN. HORIZONTAL IENGM REOURW yl I MAE HORIZONTAL LENGTH REOUIRW MIN. HOAROMAL fENGiH REOUIREO I WN. HIXEROMN. LENGTH REOUREp AS PER MWUFACNRER 10 DEFLECT I V10TIIGILY TO AV010 OBSIRI1CfI0N~9' wN.l 9' YIN. AS PER YNIUFACIURER TO DEFl.ECi ~VERTIGILY TO AV010 ORSIRUCRON.,I AS PER YNLUfACTUflER TO DEFlECT I VERTICNLY TO AVOID OBSTRUCRO(L I B' YIN.) AS PEA MWUFACNRER TO DEFLECT 9' TUN. I yEARCALLY~ SiRUCIIa~ NOTES: NOTES: I: IF EXSTIHG UIIUII' RPE S A WA11A AWN B-NdIES OF SEPAINTION 6 REWWE0. UqR AWNp I6S CNgCp~p~9090.5 R 0 . IPEp SEPAAEATID+AN~C gW[ BE C~~pT17N0ER E%ISfI NNN TOF PfiPONONE Y/%W M I. If E%ISTINC UOUIY PIPE IS A WATER MhN J, LpCATBIC WIApiO REppMEp. SEE DEFNE W-44. B-INCHES OF SEPAP/,TION 5 REWIRED. j ~ry R A5 A pp C U J TNT SPACIN66 FOR I1 L S9NGS , E p NE R E yam, yNiyNHryE~SEpWFER,~ 9W ' ~ WA iER R 5f tI 0 Y SEWER, tg I N . 2, F p{ISRNO URU1Y pIPE 5 A FORCE IWN, SVIRARY SEWER, 4. DFPiH OF BVRY TO BE J6 MINMUY N PAVED AREAS YF/SUREO RECWYED WATER YVN pR STORY SEMFR iB NCHES OF F N d V TM M , REWIRE0 6 AICfI CAL ANO ERSRND J. U]C171N0 WIRWO REOUREO. SEE DEfNI W-M , AOY FlNLStiED CW1OE, DEPTH Of RURf TD BE W YINIIIUY SEPAAATtON 6 REOUREO. P' THLS E MPRACTICN. ANO F)OSDNO M UNPAVED ARF/5. MUTT' AWN IS CBW, CBOS Oft O.L RPE, SEPARATON CAN BE REDUCED TO 6-INCHES. A ML LENGTH OF PPE SWJ.E ~ CEVTEAED OVER EK6'INO UII17Y MNN 10 PROVIDE WXIMUM JoMr sPAaxc roR Au cROSSMts. Ufl mut R N.TS. N, DEPTI vARIEs J6 Y~N. UNDER PAVING FULL IENCM OF EX15mNC UOIM RPE PPE CENTERED rrrrrr~~~~~~~~ Ai CIIDSSIN0. SEE HOLES. + PROPOSED WATER IWN J SIZE a TYPE VAAPS SEE NOTE THE IFNCiIi OF TIE RPE ro BE RESIAAWED EACH NECW.NIOAL JODIr 90E OF BEND SHILL GE N ACCORDANCE WITH TABLE 11 i/4,22 i/Y roA MECHANICAL RESTWNf LENGTHS, (SEE OETNL / CA 4g BENDS W-31) ALL WINIS 20' IAN. EACH SIDE OF E7ISIING (SRE VARIES) PIPE SHALL BE MECMANMVLY AESTRANE0. (IYPRE~ISIZmE AS CURED F PPE NOIFS 1, IF FXSLNC UIIN'f PIPE S A WA7FR WJN UUURRR ~~Sg~TC~9, PIPEwf~,PTO~N CA' BE B-NCHES OUFDISFEryPNNTONISS AEOIAAED. CNHryE~Sp~FE~~ ~~ON~FONLNq~1WN O R E W 2.~N~LS PEDU~READRB'~ DIP~CIL AND E%SiINC J. JLOG7INC yAR66WCF0~AliREO. SEE DEFNL w-41, B[LBIS~EE~IB~EB.~Nq unlmES - vECIWw'rJ. K BRASS DONOFlGnON TAG INDXAIWG "HATER', VALVE SRE a VALVE TYPE flNEr OR EPOXY TO NSIOE OF VALVE BO% (MAX) Y BELOW U0. 7000 PSI CONCRETE PAO- J (IMP.) •~4 AEINF. BAR (TYP.) ;~ ~(23~{ ~" - H~ DAD ,!0' LIMN. V1J.YE 1 7d MIN. (3E MIN. UIVOER PAWJC) ~ SEE~Np1E j4 ~"l'^'" 9' YINNUY 3d uN. 3d YIN. W OER PAWNC PROPOSED WATER YW 92E a 714E YAi11ES ~ YECHWIGL JOINT pRg 17 i/e,22 I/Y OR /9 BENDS (Slff VATUES) IXISDNC ~ + PIPE UDt17Y THE lEHG7Fl OF THE PPF TD BE FUJ. LENGTH OF PPE CENTERED AT AESTRICIED EACH SIDE OF REND CR059NC, SEE N01F5. SHALL BE N ACCORDANCE W/TABIE RESIRAWEO JONT (TmJ FOR A1EaCIUNIOIL RESRLVNT IENGRS, SIZE AS REDUUdD (SEE OETNL W-31) ALL JOINTS 2O YN. FACH SIDE ~ EXISmEC RPE SHNl BE MECIYNIUJLY RESTWNEO NOIFS : I. 6 FASTING UIElIY MPE S A WATER YUN CENTERED OVER EXISNIC URLlIY YNN LO PROVIDE WVMW JNNT 8-INCHES OF SWNW7gN S REOURm. SPACING FOR AJl CROSSMGS. 2. if E7ISEING Mt71Y RPE S A FORCE YNN, SANTPRY SEWER, J. LOGTNC WIRING REWIRED. SEE DETNL W-44, REQNMEO WAFR YNN OR STORY SEWER, IB NCEtES ~ SEPARA1gN S REOUIRE0. li THS S IYPPACpCAI AND F%ISIING 4. DEPTH Of BURY TO BE ]0' AONIYUY M PAVED AREAS MEASURED UmRY WJN S C90O, 690.5 DR D.I, PPE, SFPAPATDN CAN BE FROM FlN191W GRADE DEPTH OF OURY 1D BE Jd ARNIMUM N AEWCEO TO B-OJCJIES A FULL LENGTH Oi PPE SHALL BE UNPAVED ARFAS, _t Y SMCOTH NOSED BIBS D BE flEMOVEO) 1/Y (iBEBE REMOVED) BNIY YVI ~ TTBe--I~--W1~~ BeNY MIN I I r~pEELALy PWN'~B~. ~~ I I C[APkRD BVXFRL SHEEIN 1(4 D 4 NIN 1/4&'. __ NIIF SECAON f•IpN ~~~WJ'SECfIDN SHfEim 7AFNCH ~ ~ ~ UNSHEE7m TRENCH D COMPACIEO GRINWR. IM7EAYL COAC~RFIF ARdI ~&i17 CORPOM110N (TO flE3WN) ~4°W $,'~~atl: UNGISIUBAEOV F~HI y~OHET NOTES: 1. POURED N PIAEE (NOT PRECAST) CONCRETE PAB SHNL BE FLUSH WGH CRNE Z. LOUTNC WINING REOURED. SEE DEAR W-M. VNYE k BOK FOR UXPAVEB IW[.71016 N.TS, Released For B.E.K ICGeR R.R,S.II BY 711dked Tde Oro.Vq h tM enW.Ny el CameRy t lew. Ye. B.E.K, and k rot ro e nprea9ae a aaYe Y .ndt v Y ),~, pert Il Y net ro M reed an sy aNer Defect and R C.W r a w relemll a requaL WAEA MAN (siZE a TYPE VARIES) NOTE: I) IOCATON OF SAMPLE POINT RIBA SWll NOT RE WITHIN TiE AWDWAY BUT ROUTED TO TIE ROADWAY SHOULDERS (NON- TRAFFIC N]FAS) OF THE AQAO (WTENE APPLXYIgIE) Z) TEE WNIRACTOR SIWl BE RESPONSIBLE NA IFIE REYQVAL OF ALL PPNG a PRONGS NolEO A'7FR BACTEWOLOGICAL CIEARENCE FROM THE HEAL7H OEPNLiYENT. 1/d TRp. SAARF TAP Connelly ~ Wicker ~c Consulting Eng~eers Jacksonville Beach, Florida Destin, FL • Cashiers, N.C. HAIf SECTION SHEETED TRENCH COEIPACIED ~I D YN P~WNIXEO~R ADN~FOAF~ A IMSHEEIED iRTRENCH Ml11P L TRFN ~ u CONCREIF RAnF BFTNNN OETA! ~ ASC A N.TS. MAYPORT ROAD WATER MAIN IMPROVEMENTS PREPARED FOR CITY OF ATLANTIC BEACH ~'e~ \ L IR G~N r La~ ~..ENp ~' ~~ l~ ANOLE OF 1 L UPPER ~GON RUN ~•. RUN lGti y LOWER BEND OW~i N C d ~-~~ BRAHCH 11 ae TIRUST . P ~q~ 1HRIlST • P IN I euF VA1VF DY9IEOL JONT Od 7/~ RFF/DR SAFL PoO s7FD As IEDJRm ~ ~ 1' PWE ~ d R'E OD M W I~ 3%1' IR B NH sEE IBDfWR SUMP ROES ff JpIT (RPG'L) OE1M W-IS YVN SIQ TAENCN ~ SECDON Uh514ETFD 1ADiCX 3-WAY FlRE HTi1R,W1 CnYP/GiFn 1 1/1 SQ, NUT ~ q 4'x4' SOWAE : d IHH1f CONCRETE SUB a1NmIA1ELY BE L FRANGIBLE OW & r 1d MAT( Bc t 12 ' YN. R n ° FLANGE a IEYEL Rr,vr OFCRAOE 3000 wi CONCRETE •/~+ REBAA P' IEONC~ Bc ~ ~ ~Y WAER VALVE ROZ 11 O.C. EACH WAY FlNISH~~~•\ I/1 Bc ~~ YM. WIEPNAL~ ~~ 11 l SHAPED BOTOM p,5 g SIIRAJRE UNOSRN~ED SOIL HALF SECAON ILNf SECTON SHEETED iRENLX UNSHEEIED 7RENCH SHAPED BOTTOTY RNJPm BIDXFlLI RFDmN • oET I C Aee R N.TS, H19PANT PIPE SLEEVE AS REI As aEpIIRED~ ADDmE TYPILIS PROFIT e BELL JL 70 PLNN ENO ./YECHANTCAL AESIINWERS TEE BOLT CWAPMG O ~ 1St PRDAI F es BELL JL TO pIAM ENp Ir/MECHANICAL RFSRUDJERS ~1EE BOLT `MNG RERIWINEO BELL JOINT SECTIONS ~ . R6TPAINED YECJAVOfJJ. JONi L ~ _. '~^IU~I~NT a~ TD PREVINr THE INOIUSION DF CEYENr INTO 1HE POC%Ef pF ' BEDLIGER •• '• THE RESERNNf RNCS, A COVFR OF 16 mO POLYERIWENE S AEpUiAEp NUMBER tlF TIE RODS REWIRED Y-B' AWN - 2 RODS DOE A005 id-1Y AWH - 4 RODS ~„~ 14'-Zd AWN - 6 RODS 24'-]S TAW - 8 R005 ~ ;, ® 4Y-Id YAN - f0 RODS 3>~;( TN ~ CO' I; A CNRR WHEN ALL OF THE JOINTS TO BE USED INSIFN OF TOTN. ARE RESIRJJNm, FORCE RESIFWNEO tENCTi (OPT%MVJ.) A BNANCES FORCE B SIZE AS PER iHRUSr BLOCX DEfNI (W-]B). SEE DETNLS W-SB a W-]7. FORCE A g ~ .. FlRE HYDRMR IATERU •• L•xIMYW lfllDiX TO BE RESIR411FD DN rACH 90E DF NfiMC (FEEL) ~ ~ ~ !! ® ~ ~ C !! 3 ~ 5 A ~ ~ 4 ~ R 4 I ~ ~ ~ ~ i ! § ~ ~ B ~ ~ 4§ ~S ~ ~ ~ ~ CC tl p ~~ ~g 3 ~5 1 7 1 7 II 70 - mn 7 - 9roreh 39 70 / 7 0 / 1 n/a 0 Z 5 f0 7s 30 - ran I - brand 55 7J / / 11 / Z 75 e 7 e tJ 32 30 - ran I -band 77 70 / 5 it / 3 JD LO • e le 30 7D -run I - bmndl N N / 0 T7 / 1 79 17 + 9 11 IS 70 -run T - braid 1N 4I / s ID / f 50 1/ 5 TB 11 et 20 - rw 10 - been 110 b / 9 17 / 4 ]D 10 1 11 3] S7 3D - rve 30 - bvrch 171 N / ID 76 / 5 ]D 11 0 it 20 dt 1D - Tun Al - Yanah 115 W / II to / 5 ZO a0 7 13 7e N 70 - Iwl 55 - Maneh I!1 le / 72 M / d >9 11 0 le 72 70 30 - iul 50 - 6amh te65 77 /'tl 37 / 7 SB ]0 9 le Y 03 7D - ran 77 - ammh 711 O? / f7 N / 6 77 J/ ID II w 105 10 - rvn 115 -bond ass IDs / A st / 10 7/ rNIXA ~1WfFlt' T PEN I MURYI! AT O0.0VIq CD/t ero, 7 un>nm C„ 1 aD, a HOLE OPEN Nb7ESC ~FEE~HfwP SF SIRP 1)IDCATNC MIRING REOUTAEO. SEE OETNL W-14 2) FlRE HYDRANTS SHALL BE N5TAilID BEIWEEH BACK OF CURB AVO FACE Of SIDEWAIX EXCEPT WHERE CONOmONS AND/OR AECUUOONS PROHIBR. TE 0.005 ! MF uN~~r_uA7 RTRxCg N.iS. NOTES i, Tobla aaumpdonc PVC pipe, Safely Faclar • 15, Test preaaun . 150Pei Sdi • GY ar SM, 3 fL bury depth to lap of pipe, Tench type 3, Bro,ch on Tn 's ens Tee emdlar Than nn a(M eT:e and ZO lent of pipe R imldied poet the tea on Bu rvn Bide (amdYr bronoh eizm mud ba rnN7datad bJ de engineer). Yerlied afleeb on 3 (eel deep an lop and B tnt deep on 9atlam RlOueare an edeuloled for onr efn ratluclien, Other caldlUolW rll regale addRlonal ealculaUone. 2 N fkBnge mwt be rcahdned. Ono d Ue IDtloeing meNode ma( be aced: A Mechanicd roetrdnh of RNinq and at edfocenl )dnta to o Length oe epadBed In eh9r4 A lk rode o! Rftlnq and Througqh Jolnte !o o Yngth ae epeelRed M chart 3. Payment for ratrainte at Ninq ehdl 6e NuFudad nth the CtUnq pormenl. PgmeM far rmlydM at d'MOroe 'L' (mm Rllfnq 7holl be ce A TO It. Jo1nG .en indolled. 4, V4M rpb9inh shall be rnlydnad the Swne dialance of h9dlantDl plugs. Project Na: I Oreeinq 0001-6 WATER DETAILS Seolf : N,T,S. Ogle ®"~, . ~ J L ALL VDRK AND MATERIALS SHALL BE IN COMPLETE ACCORDANCE VITH ALL RELATNE SECTIONS OF ATUNi1C BEACH STANDARDS, AND F.DAT. STANpARDS AS APPLICABLE (LATEST REVlSIDN) AND STANDARD DETAILS, B, ALL VOAK SHALL BE PEAfORNE- IN A SAFE MANNER. ALL SAFETY RULES AND GUIDELINES OF DS.HA. SHALL BE FOLLOVED. THE CONTRACTOR SHALL BE VHOLLY RESPONSIBLE FOR ANY INJURIES OF HIS OR HER EMPLDYCES, AND ANY DAMAGE TD PRIVATE PROPERTY DR PERSONS -IIRING THE COURSE OF THE PROJECT. ALL COSTS ASSOCIATED YI1H COMPLYING VITH O.SH.A REGULATIONS AN- THE FLORI-A TRENCH SAFETY ACT MUST BE INCLUDED [N THE CONTRACTORS BID. 3. THE CLWTRACIDR SHALL BE RESPONSIBLE FDR VISITING THE JDB S[TE PRIOR TO PREPARING THE BID FUA THE PURPpSE Of FaM1L1AR121NG HIM [Nt HERSELF VITH THE NATURE AND E%TENi OF THE WORK AND LOCAL LONO1T10NS, EITHER SURFACE OR SUB-SURFACE, VHILH MAY AFFECT THE VOAK TO BE PERFORMED, AND THE EQUIPMENT, LABOR AND MATERIALS REDUIRED. FAIWRE TO DD SO VILL NOT RELIEVE THE CONTRACTOR W COMPLETE PERFORMANCE TINDER THIS CONTRACT. THE CONTRACTOR IS ALSO URGED TD TAKE COLOR PHOTOGRAPHS ALONG THE ROUTE OF THE PROJECT TO RECORD C%1STING CONDITIONS PRIOR TO COISTRUCTION, AN- TD AID IN RESOLVING FUTURE COMPUWTS THAT MAY OCCUR -UE TO THE CONSTRUCTION OF THE PROJECT. q IT SHALL BE THE CDNTRALITIRS RESPONSIBILITY TD ETHER CONDUCT ANY FIELD E%PLORAT[ON OR ACDUIRE ANY GEDiECHN1CAL ASSISTANCE REDUIRED TD ESTIMATE THE AMOUNT OF UNSU]TAHLE MATERIAL THAI WILL REQUIRE REIWAL AND70R ID ESTIMATE THE AMOUNT OF OFF S[TE BORROW THAT VILL BE REDUIRED. 5. ALL IMPROVEMENTS SHOWN ARE ID BE VARRANTED HY THE CONTRACTOR ID THE CITY AND THE CITY FAR A PERIOD OF ONE YEAR FRDN DATE OF ACCEPTANCE BY THE CITY. B. PIE CONiRACTGt WILL CONiRACi AT HIS EXPENSE WITH AN INDEPENDENT IESPNG UBORATORY TO PERFORM MATERIAL TESPNC AND SGL 1E5-NC W ACCORDANCE MTH Cltt REWIREMENTS THIS SHALL INCLUDE DENSnY 1E5T5 IN ALL PAVEMENT AREAS AND IN ALL UPLItt TRENCHES LOCATED IN PAVEMENT AREAS CONCNEIE 7ESliNC ANO ALL OTHER MATERIAL TESIWC. 7, THE CONTRACTOR SHALL BE RESPONSIBLE FGI OBTANING ALL NECESSARY PERMITS AND INSURANCE REWIRED FOR mE PROJECT WEDDING qlY RIGHT-G-WAY PERMITS FOR WORK IN THE Ott RGHT- Of-WAY G1 EASEMENT, B. ALL OISNRBED AREAS SHALL BE SEEDED AND MULCHED, OR SODDED AS OIRECIED. 9. 'AS-BI11LT" DPAWNCS - AS-GUILTS i0 THE CITY AAE REWIRED TO BE SpNEO ANO SEALED BY A FLORIDA RECIS7ERE0 LINO SURVEI9R THEREFORE, I7 SHALL BE PNE CGNTRACTORS RESPONSIBNTY TO CONTRACT WiH UND SURVEYOR REGISTERED IN THE STALE OF RORIOA FOR PIE PREPAAAPON, FlEID LOCAPONS LERPFlCAPDN ANO SUBMITTAL OF 'AS-BULLY DRAWINGS IN ACCORDANCE WIPN CURRENT Gtt STANDARDS AND SPECIFILAPONS IT IS THE CONTRACTOR'S RESPONSBIU7V i0 PROCESS THE 'AS-BUILY.DRAWINGS FGi APPROVAL BY THE CITY 10, THE CONTRACTOR SHALL COORDINATE PIEIR. CONSIRUCPG4 WITH ALL OPIER CGViNACTORS IN THE EVENT OF ANY CONNCi WHATSOENER, 1HE CONTRACTOR SHALL NOPFY 7NE FNGNEER AND OWNER PRIOR TD PRDCEEIXNG WTH causTRUCnDN. 11. ALL GEARING ANO GRUBBING REWIRED FOR ALL ROADWAY, UPU11E$ DITCHES, AIO BERMS INCLUDED M THIS PROJECT AND THE CLEARING AND GRUBBING OF ALL RIGHT-O-WAY OR EASEMENTS SHALL BE CONSIDERED AS PART OF THE PROJECT. 12, CONiRAGiOR 19 RESPWSBLE FOR PROTECPON OF ALL SURYET' AND PROPERTY MONUMENTS IF A MONUMENT R OISNRBED, THE CONIRACTOIT 91ALL CONTRACT WRI THE SUAKYGt R RECORD FOR REWSTAWTKKN OF 1HE MONUMENT. 1J. ALL OEBPoS RESULPNG FROM ALL ACPNPES SHALL BE DISPOSED OF OFF-9TE BY CONTRACTOR. iq ALL E%CESS SUITABLE AND UNSUITABLE MATERIAL SHALL BE REMOVED FROM THE SiE BY THE CONTRACTOR UNLESS ERECTED O7HERWSE BY ENCWEER OR OWTJER. I5, ALL EK4SiING TREES lO REMAIN SHALL BE PRESERVED AND PRO7EC7E0. i6. BURNING OF TREES BRUSH M'D OTHER MATERIAL SHALL BE APPROVED, PERMITTED AND CDORONA7ED W1H Gtt FIRE MARSHAL. IT. MANTENANCE OF 7RAFFlC SHALL COFFORM i0 F.D.O.T. STANDARD INDE% 600, UTEST EDIPON. IB E%IPNG ASPHALT SHALL BE SAW-CNT IN B7ANGHT LWES FOR ALL TRENGIES ANY DAMAGE TO Gtt STREET PAVEMENT, CURB, SIDEWAU(, OR OTHER MATERIAL SHALL ~ REPAIRED AS DIRECTED ANO APPROVED BY mE DIRECTOR GF PUBLIC WORMS. 19. PAVEMENT REMOVAL AND REPUCEMENT SHALL BE PND FOR UNDER NEW PNE PAY HEMS aspned Released For Construction B.E.K. YOWn R.R.S.II 6y necked Thb Oroa~q b tha preparly of Wmtly t Widen Ma B.E.K. ma r net a a ryreNUatl « mpt.e rn .nw « M LC, IwL II k nol Lo W~ isd m my om« Praled and R,GW. ~ to Ir nlumatl m raquAFl. umnr NorES: 1... THE LOCAPON OF ALL EXISPNG UPUPES, S7RUCNAES AND INPROYENENTS SHOWN ON THE DRAg1NCS IS BASED ON UWTEO WFORMAPON AND MAY NOi HAYS BEEN VEPoFlEO. THE LOC0.nON5 AHE APPRO%INAIE. PIE CON7PACTG2 SHALL NOPFY RESPECPVE UPUTY OWNERS ANO FlELD VERFY LOCAPONS OF EMISPNC UPUPES AND OTHER IMPROVEMENTS PRIOR TD COMMENCWG ANY CONSTRUCTON. IF THE LOCAPONS SHOWN AAE CONTRARY TO 1HE ACNAL LDCAPONS, THE CONTRACTOR SHALL NOPFY 1HE OWNER AND ENGINEER OF PIE DISCREPANCY. P115 DISCREPANCY SHWLO DE RESOLVED PRIOR N COMMENCING CONSiRUCPOY. PIE CONTRACTOR SHALL E%EAgSE E%7RENE CAUPON YMEN WORKING IN AREAS NEAR ENSPNC UPUPES AND IMPROVEMENTS AND SHALL BE R6PONSIBIE FGt ANO SHALL REPAIR OR PAY FOA ALL DAWACf MPDE TO ENSPNG U1WPE5 OR OPIFA INPROVENENIi PRIOR TO CONNENCENENT OF ANY CONSIRUCPGN, THE CONTRACTOR SHALL VERIFY ALL GRADES, INVERTS ANO ANO TYPE OF MATERIAL OF E%ISPNC UPUPES TO WHICH NE SHALL CONNECT. CALL UPUtt CONTACTS OR ONE-CALL SERNCE 4B HOURS IN ADVANCE OF WORK. 2. 71K CONTRACTOR SHN1 SUBMIT SHOP DRAWNGS ON ALL NATEPoALS TO mE ENGINEER FOR REVEYI ANO APPROVAL RAW PRIOR TO SUBMITTAL N THE Cltt, ANO MUST BE APPROVED BY mE G7Y PPoOR TO PURCHASE OR CONSTRUCTON OF ANY UPUTY PIPE OR STRUCNRE 3. UNSUITABLE MATERIALS UNOEfl WATER, SEWER PIPE. S70RM PIPE OR S7AUCNRES SHALL BE REMOVED AND REPUCED WiH SELECTED BALNFEI, PROPERLY COMPACTED i0 95fC MA%IMUM DENSItt. I a, ALL UNOERCRWNO UPUPES MUST BE INSTALLED PRIOR TO PREPARAPON OF SUBCRADE FOR PAVEMENT. ~ 5. ALL WATER ANO SEWER CONSIRUCPOV WI7HN PTE GTY SHALL BE ACCOMPLISHED BY AN UNDERGROUND UPUtt CONTRACTOR LICENSED UNDER 1HE PAONSIONS ~ CHAPTER 489 FLORIDA STANTES AND SHP11 BE INSTALLED AS PER GTY DF ARANPC BEACH STANDARDS AND SPEGFlCAPONS UNLESS SHOWN OTHERWISE. 6. CONTRACTOR SHALL PRONDE, TO mE ENGNEER, A SGIEOUtE OF INVERT ELEYAPONS OF ALL SANITARY MANHO.ES PRIOR 10 THE PUCENENT OF 1HE UMEROLK BASE COURSE iH5 SCHEDULE TO BE PROVIDED BY il[ REGSTERED UND SURVEYOR SUBNITPNC THE 'AS-8U&Y ORAYANGS FOR PiIS PROJECT. Z. ALL WATER LINES 4' OR tE55 SHALL 0E NAPGVAL SANITARY FWNOAPpV POTABLE WATER (N.S.F.P.W.) RATED. B. ALL WATER NNNS SHALL HAVE A NININUN OF 36" COYER FROM FlNISHEO G2AOE IN UNPAVED AREAS AND 36' NININUN COVER IN PAVED AREAS, WATER LINE DEPTHS ARE DESGNED TO FINISHED GRADES AND SHALL BE PROTECTED UNPL FlNISHEO WORK IS COMPLETE 9, A NORIZONTAI SEPARAPDN OF A MINIMUM OF TO FEET SHALL BE MAINTNNED BETWEEN PARAl1iL WATER MAWS AND SEWER NNNS (INCLUDES FORCE MAINS). WHERE WATER AND SEWER MAINS CA055 'NTH IE55 1HAN 1H INCHES VERPCAL CLEARANCE, ALL PVC PIPE MAY BE ENCASED IN CONCRETE f0A A OISIANCE OF 20 FEET CENTERED ON PIE PENT OF CR059NG, OR A 20 FOOT SECPON OF DUCPIF IADN SEWER PNE CENTERED ON PGNT OF pEOSSING MAY BE SUBSPN7EO. TENS SINAPON NAY OR MAY NOi BE NOTED ON DE9CN OAP.WWGS iL. MECHANICAL RESTRAINING DENCES ARE REWIRED IN ACCORDANCE WITH CITY STANDARDS WHERE WATER MAWS AAE TERMINATED AND A7 ALL BENDS ANO LEES 12: ALL POTABLE WATER ANO SEWAGE FORCE MAINS 9 INCHES AND URGER SHALL BE OUCPLE IRON, CLASS 50, OA BETTER. 1}„ IT SHALL BE THE CONTRACTOR'S RESPONSIOLItt AND A7 THE CONTRACTOR'S EXPENSE TO PRONDE THE Gtt OF AIUNPC BEACH WTH "A9-BULY DRANINCS ON WSK, IN AUTOGAD 14 FORMAT AS WELL ,IS ON 24'yJ6" N'AAR PUN SHEETS. iq. ALL PIPING ARRANGEMENTS, AND LOCAPONS CF PIPING NOT SHOWN, SHALL BE PROPERLY REFERENCED AND RECORDED ON THE RECORD 'AS-BULLY DRAWNCS 15. ALL INSPECPONS AND TESPNC SHALL BE COOAOINAIED WITH PTE CITY 16. UPUTY CON7RACTDR SHALL NOT COMMENCE WORK WPNWT PHIDR NDPCE ip THE Gtt OF ATUNPC BEACH PUBLIC WGtKS DEPARTMENT (247-5H34~ 1W0 OATS NOTFICAPON IS REQUIRED BEFORE ANY LINES ARE CONNECTED i0 1HE EMSPNG UPLItt SYSTEM, OR SERNCES OR STORM PIPES ME LOCATED. 11. THE CONTRACTOR SHALL AVOID SERNCE INIERRUPPOYS AND MAINTAW ANY E%IS1WG WATER AND SE'AER SERVICE TO MEET THE SYSTEM DEMANDS AT All nMES. PNE CONTRACTOR SHALL BE RESPONSIBLE FDR NDPFlCAPON OF AFFECTED GISTtlIERS OF THE UPUtt A NININUN OF 4B HOIRtS IN AOVANG~. E' ANY INIERRUPPON OF SERNCE 16, ALL NEW AND/OR RELOCATED WATER NNN PIPES AND FlTPNGS SHALL NOT CDNTAW MORE THAN EICJNT PERCENT LEAD AND ALL PACKWC AND JOINT MATERIALS USED IN THE JgNTS SHALL CONFORM WI1H ALL .APPLICABLE ANWA STANDARDS ALL NEW AND/OR RELOCATED WATER SERNCES AND PLUMBIN4 SHAll CDVTNN NO MORE THAN EIGHT PERCENT LEAD ANO ALL SOLDERS AND FLUX SHALL CONTAIN NO MOREIHAN 0.2 PERCENT LEAD. 19. ALL WATER SEANCES ARE i0 HAVE A CORPOINAPON STOP AT TFR NNN. 20. ALL CURB STOPS ARE TO HAVE LOCKING LOOPS 21. ALL WATER t SEWER SERNCES ARE TO BE MARKED W PIE ASPHALT MIPi METAL MARKERS AT THE LOCAPON OF THE ACNAL TAP. 22 CONTRACTOR SHALL APotANGE FOR AND PAY fOR ALL IESPNC AS REWIRED IN THE Cltt DF ARANPC BEACH SPECIFICATIONS PERTAINING TD THE JO& Z3. uPUTY CONTRACTOR SHALL NOi COMMENCE WORN Ni7H0UT PAfDR NOPCE TD mE Gtt O ATLANPC BEACH PUBLIC WORKS DEPARTAENT (247-SBJ4), TWO DAYS NOPFlCAPON IS REQUIRED BEFORE ANY LINERS ARE CONNECTED TO THE E%ISPNG UPUtt SYSTEM, OR SERNCES OR STORM PIPES ARE LOCATED. Z4. THE CGNiRAC7O2 SHALL COOfl01NA7E PIE WORK WITHIN THE Cltt PoCH75-OF-WAY W17H PNE PROPER ACENgES FOR MAINTENANCE OF 1RAFFlC AND NEIH00 OF CGNSTRUCTON AND REPAIR. ' 25. ALL GATE VALVES SHALL BE NON-RISING STEM TYPE AND SHALL BE SUITABLE FGI 200 PS NON-SHOCK WORgNC PRESSURE GATE VALVES SHALL BE MECHANICAL JOINT OR FUNGED. VALVES SHALL BE IRON BODY, BRONZE FIT1E0. VALVES SHALL BE (LOW, MkH, MUEII£R, OA APPROVED EQUAL VALVE BOXES W1H SgiEW EXTENSIONS SHALL 8E OF CASs IRON CONSTRUCPW, 3/B INCH NININUN WALL THICKNESS AND SHALL BEINON-TACKY TAR ENAUEL COALED. mE WOAD '6LWER' SHALL BE CAST IN mE COVER FOR VALVES ON FORCE MAIN: ALL CAIE VALVES INSTALLED SHALL OPEN BY NRNING TO THE LLFi (CWN7ERCLOCItYASE) WHEN NEWEO fROM THE TOP. VALVES SHALL HAVE RESIDENT SEATS. 26. HYOROSTAPC AND Lf-AKAGE TESTWG, AND GSINfECT ION OF THE WATER NNNS INSTALLED SHALL BE PERFORMED IN ACCORDANCE NIPN THE Cltt OF ATUNPC BEACH, FLOR100. STANDARD S°ELIFlCAPONS A REPRESENTAPVE OF mE Cltt OF APANTC BEACH MUST BE PRESENT DURING PTE HYOROSTAPC AND LUKAGE PST, 1HE IESi IS N BE CEPPFlED BY A ~PRESENTAIiYE OF THE DESGV ENCWEER. 21. NO CONNECTION TO E%IS11NG POTABLE WATER SYSTEM SHALL BE ALLOWED UNPL ALL PROPQSED WATER ONES HAVE BEEN PRESSURE TESTED, DISINFECTED AND CLEARED FOA SEANCE. 28. ALL INSPECPDNS AND IESPNG SHALL BE COORDINATED WI1H THE QTY. 29. THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS TO WORK IN E%IPNG RIGHTS-OF-WAY. 30. THE CONTRACTOR SHALL fURNI$H AND INSTALL FlTPNGS AS NECESSARY TO ROUTE PIPES ARWND OTHER PIPES QR C857RUCPONS AS REWIRED. 31, ALL EYJSRNG UPUPES HAVE BEEN SHOWN ON PNE PUNS FROM PIE BEST AVNUBIE INFORNAPON. THE OWNER SHALL NOi RE HELD RESPONSIBLE FOR INAGCURAgES OR ONISSONS IN iNE LOCAPONS DR GRADE OF FACNPES OF THIS TYPE. PTE CONTRACTOR SHALL BE HF1- RESPONSIBLE FOR LCCAPON DF ALL UPUPES IN CL1YSiRUCPCN ARU L.OCAPON SHALL BE MADE IN ADVANCE Cf CONSTAUCTON IN ORDER THAT CONNC75 MAY BE RESOLVED. 32 ALL PIPING ARRANGEMENTS, ANO LOCAPpNS OF PIPING NOi SHOWN, SHALL BE PROPERLY REFERENCED AND RECORDED GN PIE RECORD "AS-BULLY DRAWINGS 33. ALL EMSPNG WRIER PIPE, INCLUDING SERNCES, SGIFDGED TO BE ABANOONEO SHALL BE REMOVED IF NImIN TRENCH OF NEW WATER MAIN, OR WITHIN TRENCH OF NEW SEANCE, UNLESS DTHERVJSE DtltECiEO. Connelly & Wicker Inc Consulting Engineers Jacksonville Beach, Florida Destin, FL • Cashiers, N.C. MAYPORT ROAD WATER MAIN IMPROVEMENTta PREPARED FDR CITY OF ATLANTIC BEACH NATURAL GROUND- CONCRETE SIDEWALK GENERAL NOTES 0,0~ 0,02 ---0.03 -_----~-~ NEW 250rTrT D.I. WATER MAIN CE SURVEY CL FLYOVER RAMP I~~I TYPICAL HALF SECTION - MAYPORT READ WITH FLYOVER RAMP EXIST, ASPHALT PAVEMENT TOP OF BEDDIN~ TYPE SP STRUCTURAL COURSE RESURFACING 0,3 ASPHALT BASE ;TED BACKFILL STANDARD PAVEMENT REPAIR DETAIL ALONG MAYPORT RDA (SR AlA) ROADWAY PAVEMENT REPAIR OPTIONAL BASE GROUP 15 WITH TYPE SP STRUCTURAL COURSE (TRAFFIC LEVEL 4) (BO r7rl) AND FRICTION COURSE FC-6 C4O rlrl> (RUBBER) • FOR ALL OTHER PROTECT NOTES, SEE PUN SHEETS OR SPECPICAPQVS IF CONFLICTS ARISE BE7T4EEN PUN NOTES AND SPECIFlCAPDYS, PUN NOTES WILL GOVERN. ProjeM No.: ~ Drawing Rlmaian Scale N,T,S: Dote APRIL 27. 2000 Sheet ~ ~ of t CHRONOLOGY OF EVENTS REGARDING THE RELOCATION OF 10"WATER LINE FOR JTA FLYOVER Date Description 6/17/97 Sent location of water line to L.D. Bradley Surveyors. 12/23/97 30% Plans received, water mains not shown. 1/14/98 Mark-ups sent to JTA -ponds, access, work phases, property. 2/16/98 Engineer, Pitman Hartenstein & Assoc. (PH&A), advises that water lines will be shown. 2/23/98 Presentation to City by JTA. Commissioner Meserve questioned cost of utility relocation and JTA said the City of Atlantic Beach is responsible. 3/4198 Meeting held with PH&A, City Manager and I regarding outstanding problems with plans. 3/26198 JTA Public Meeting -Stage One Atlantic Blvd. 8/19/98 60% Plans received. 9/25/98 Mark-ups sent to JTA -crossings. 10/12/98 Received Final Traffic Operations Study and Conceptual Highway Lighting Analysis Report. 12/22/98 Additional comments and 9/25/98 comments (not addressed by JTA). 2/2/99 Additional comments and 9/25/98. comments (not addressed by JTA). 6/17/99 Letter to Jack Gabriel, JTA, that no plans received beyond 60% and we stated our assumption, that no utilities required relocation. 6123/99 Received Preliminary Utility Adjustment Plans - no indication of water line. 7/14/99 Received 90% Plans from JTA but no cross sections. received. 7115/99 JTA Public Hearing. 7129/99 Submitted comments on 90% Plans. Could. not determine any utility conflict with water line. 9/8/99 Final Utility Coordination Meeting - JEA announces plans to install 16" diameter water main and 12" diameter force main.. Some minor utility conflicts noted to accommodate BellSouth. c~ ,` Date Description 9/9/99 Field walked job site with Water Kloss, PH&A. Physically showed him water and sewer utilities and approximate depth of lines. 12/3/99 Received 100% Plans; wants comments by 1/4/00. 1/4/00 1 sent letter to Jack Gabriel noting minor conflicts which I had asked Walter Kloss on 919/99 to submit a cost proposal for design plans and a permit. (He never did). 1/26/00 Received proposal from PH&A f r $40,340 o do design request, CD from JTA. 2/3/00 Utility Coordination Meeting No. 1. 2/16/00 Received proposal from Connelly & Wicker ,800 2/21 /00 Re d proposal from Gee & Jenso perform design work - 3/2/00 Purchase order issued to Connelly & Wicker to do design and permit. 3/23/00 Received Preliminary Plan for review and transmit set to JTA. 4/23/00 Connelly & Wicker submits revised plans. 5/4/00 Connelly & Wicker provides engineer's estimate. 5/22/00 City Commission authorized staff to negotiate with Gruhn May, Inc. and Superior Construction Co. not to exceed $234,236. 5/25/00 Received estimate from Gruhn May, Inc. for $389,402 and from Superior Construction Co. for $361,649. 6/2/00 Engineer reviews and changes pipe material to PVC instead of DIP. 6/13/00 Received revised estimate from Gruhn May, Inc. for $349,285 and from Superior Construction Co. For $352,649. 6/26/00 Request City Commission to authorize additional funding.