1781 Atlantic Beach Dr ROW App ,.S!
4 .�. .'
RIGHT-OF-WAY/EASEMENT PERMIT
Permit# Issued by the City of Atlantic Beach
PERMITTEE RESPONSIBLE FOR NOTIFYING 811 AND OBTAINING UTILITY LOCATES
Job Address 1781 Atlantic Beach Dr Phone (904) 727-1536
Permittee AT&T - Carlos Garcia Email bp9757@att.com
Requesting Permission to Construct Place 40 ft of 2-wire copper service wire (buried), 1 road bore to provide service.
Please see plans for additional information.
Location (Reference to Cross-Street) 1781 Atlantic Beach Dr, N of Atlantic Beach Ct.
• Permittee declares that prior to filing this application they have ascertained the location of all existing utilities,
both aerial and underground and the accurate locations are shown on the sketches.
• Whenever necessary for the construction,repair, improvement,maintenance,safe and efficient operation,
alteration or relocation of all,or any portion of said street or easement as determined by the Director of Public
Works,any or all said poles,wires,pipes,cables or other facilities and appurtenances authorized hereunder,shall
be immediately removed from said street or easement or reset or relocated hereon as required by the Director of
Public Works and at the expense of the Permittee unless reimbursement is authorized.
• All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be performed
under the supervision of Adam Gillespie (Project Superintendent)
with Company Name Blue Streak Phone 904-614-0016
• All materials and equipment shall be subject to inspection by the Director of Public Works.
• All city property shall be restored to its original condition as far as practical, in keeping with City specifications
and the manner satisfactory to the City.
• A sketch of plans covering details of this installation,as well as a copy of a recent survey shall be made a part
of this permit. Calculations showing any increase in impervious area on owner's lot or in the City
right-of-way are to be included with this application.
• The permittee shall commence actual construction in good faith within 60 days. If the beginning date is more
than 60 days from date of permit approval then permittee must review the permit with the Director of Public
Works to make sure no changes have occurred in the area that would affect the permitted construction.
• It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the City's
right,title and interest in the land to be entered upon and used by the holder,and the holder will,at all times,
assume all risk of and indemnify,defend and save harmless the City of Atlantic Beach from and against any and
all loss,damage and cost of expenses arising in any manner of the exercise or attempted exercises by the holder of
the aforesaid rights and privileges.
• The Director of Public Works shall be notified twenty-four(24)hours prior to starting work and again
immediately upon c pletion.
Date 4t/3/0100740
Permittee(signed in pr ence of Notary Public)
STATE OF FLORIDA,COUNTY OF DUVAL
The foregoing instrument was acknowledged this 30' day of A pr-i I ,20 2 Ci ,
by Coir'/or Gorr t , ,who personally appeared before me and
(printed name of Permittee)
acknowledged that he/she signed the instrument voluntarily for the purpose expressed in it.
PCW,ScIA1 Personally Known \I
ignature of Notary Public,State of Florida Produced Identification(Type)
B
MY COMMISSIONRENDA M PAUSC00916942HE
EXPIRES November 19,2023
•
t •
•
•
•
•
•
•
•
•
•1 F V. , t''.
-1• .k • •• i 7}. -.e.. !Ni<, - ! ..•—• '4•r .
.. t�.i sig -I _ .. •, i r.
P. '} ^f. :ie. •�.. . ... - '..ate... - +
• .. _fir,. c - _
t
w •
•
•
-r
Y.
•
t 21. .• J t .r. .I )' ice: ..
..�! Ct 'MIP
VICINITY MAP
WORK LOCATION
L_I
C
o
0 I .- ATLANTIC BEACH CT
Li 0 w
p
U_
H
Z
-J
J
e-
Q
COASTAL OAKS LN
BURIED SYMBOL LEGEND
Prayase0 Exfslinq pssa/pIDn
PERMIT NOTES
—e s— BURIED CABLE
ATtT PROPOSES TO PLACE THE FOLLOWING TELEPHONE
FACILITIES: —BJ— —BJ— BUR JOINT-TRENCH
40'OF 2-WIRE COPPER SERVICE WIRE (BURIED ENVIRONMENT)
I ROAD BORE
__A____ ENCLOSURE
LQ ENCLOSURE
PRIMARY METHOD OF PLACEMENT
WILL BE MECHANICALLY PLACED, MANHOLE
UNLESS NOTED OTHERWISE.
PIPE/CONDUIT
CA-MKR CA-MKR CABLE MARKER SITE VISIT:
e—— ——B --- BURIED SVC ORE GEO MGR
MAINTENANCE OF TRAFFIC Phone:
WORKERS WILL UTILIZE M.O.T,CASE '--°'-- - JOINT-TRENCH SVC ADDRESS
440 FOR THE PROPOSED WORK SHOWN Rasa:
THROUGHOUT THESE DRAWINGS. N/A BORE
Vj//// N/A CUT PAVEMENT
EWO Ra.. TBD
N/A SPLICING PIT
SITE ID: SXXXXx
_ 1
ACAS No.: TSD
2001)(74') N/A TRENCH LENCOEPTH we Cal: icenF.MA
DWG I CF _
pl EXISTING BURIED CABLE
•PROPOSED BURIED
0 COPPER SERVICE WIRE —i• 40'
I
I 0
1781
r----e-to
I 1
1774
Bore Detail-NO Drainage Ditch Involved
r
nSOrtYn .ra.+n
`B I I B-/-T-
40
D mn Mn
n
S
O
33
X
X
(„) SITE VIER:
GEO MGR
Phone:
ADDRESS
PMeae
EWO No.: TBD
SITE D.: )0000(X
ACM No.: TBO
WC CLLI: JCBHFLMN
NOT TO SCALE Bvc OF _
v
ROAD .
WORK
END AHEAD
ROAD WORK
A
C
Ly LY Ly ■ • ■
I • • • ■ • ////��//�/
A B Taper Length-'/¢ / Work Area / �¢ t
See Table II ////////// END Table 11
ROAD •
I.
ROAD WORK
Taper Length - Shoulder
WORK Device Spacing-Taper Device Spacing-Tangent 500
See Table I See Table I Speed Pit(It)
AHEAD SPEEDING FINES Notes
DOUBLED (mph) 8' 70 12
MIEN NORKERS Shldr. Shldr. Shldr.
PRESENT
25 28 35 42
Table 1 30 40 50 60 ,_..,WS,
Device Spacing 35 55 68 82 60 .
Max.Distance Between Devices(ft.) 40 72 90 107
Speed Cones or Type I or Type II 45 120 150 180
(mph) Tubular Markers Barricades or Vertical 50 133 167 200
DISTANCE BETWEEN SIGNS Panels or Drums
Speed Spacing(ft.) Taper Tangent Taper Tangent 55 147 183 220
A 8 25 25 50 25 50 60 160 200 240 L=WS
40 mph or less 200 200 30 to 45 25 50 30 50 65 173 217 260
45 mph 350 350' 70 187 233 280
50 mph or greater 500 500 50 to 70 25 50 50 100
`Midway between signs.
8 minimum shoulder width
viL= Length of shoulder taper in feet
SYMBOLS GENERAL NOTES DURATION NOTES W= Width of total shoulder in feet
(combined paved and unpaved width)
® Work Area 7.When four or more work vehicles enter the through traffic lanes in a one hour 7.Signs and channelizing devices may be omitted if all of the
period or less(excluding establishing and terminating the work area),the advanced following conditions are met: S= Posted speed limit(mph)
• Channellzing Device(See Index 102-600) FLAGGER sign shall be substituted for the WORKERS sign.For location of flappers a.Work operations are 60 minutes or less.
and FLAGGER signs,see Index 102-603. b.Vehicles in the work area have high-intensity,rotating,
flashing,oscillating,or strobe lights operating.
01 Wbrk Zone Sign 2.SHOULDER WORK sign may be used as an alternate to the WORKER symbol sign only
on the side where the shoulder work is being performed.
Lane identification+Direction of Traffic •
3.When a side road intersects the highway within the TTC zone,additional TTC
devices shall be placed In accordance with other applicable TCZ Indexes.
CONDITIONS
d 4.For general TCZ requirements and additional information,refer to Index 102-600. WHERE ANY VEHICLE,EQUIPMENT,
WORKERS OR THEIR ACTIVITIES
ENCROACH THE AREA CLOSER
THAN 15'BUT NOT CLOSER THAN
1'TO THE EDGE OF TRAVEL WAY.
R
iz
LAST 20 DESCRIPTION: INDEX SHEET
REVISION FDD FY 20]9-20 TWO-LANE, TWO-WAY, WORK ON SHOULDER
11/01/17 wow"• STANDARD PLANS 102-602 1 of 1
c,
• .1
e
GENERAL NOTES:
SYMBOLS
1.When encroaching work requires a sidewalk closure for 60 6.Provide a cross-slope with a maximum value of 0.02 for all temporary walkways.
®
Work Area minutes or greater,provide an alternate pedestrian route.
■ Channelizing Device 7.Maintain temporary walkway surfaces and ramps that are stable,firm,slip-resistant,
2.For spacing of vehicular Channelizing Devices,see applicable and free of any obstructions or hazards such as holes,debris,mud,construction
D Work Zone Sign vehicular temporary traffic control Indexes. equipment,and stored material.
(=>\Required Locations For Either Temporary
Or Permanent Curb Ramps. 3.Cover or deactivate pedestrian traffic signal display(s)controlling • 8.Remove temporary walkways immediately after reopening of the sidewalk,unless
dosed crosswalks. otherwise noted in the plans.
b Lane Identification r Direction of Traffic
4.For post mounted signs located near or adjacent to a sidewalk, 9.Meet the requirements of Index 522-002 for temporary curb ramps.
giEb Pedestrian Longitudinal Channelizing Device(LCD)with maintain a minimum 7'clearance from the bottom of the sign
Mounted Work Zone Sign or separate Work Zone Sign panel to the surface of the sidewalk. 10.Place pedestrian longitudinal channelizing device(S)across the full width of the
N Pedestrian Longitudinal Channelizing Device(LCD) closed sidewalk.For temporary walkways,similar to the Sidewalk Diversion.
5.Provide a 5'wide temporary walkway,except where space restrictions place LCDs to delineate both sides of the temporary walkway.
Temporary Sidewalk warrant a minimum width of 4'.Provide a 5'x 5'passing space for
temporary walkways less than 5'in width at intervals not to 11.For sidewalk diversions,ensure that there is sufficient R/W for placement of
Ar exceed 200'. temporary sidewalk and pedestrian longitudinal channelizing devices.
I
_- - - - — m
38345801X1
DETOUR (�-au� �l - -
_ 03801D 5WM3015it t3 af10130I
11 i\ c �' • 1 ��AtlMMNM
;� 03S010 @ DEOUR '1
1 I i:: �N1VM301S l 9 s��
ROAD �� 03S010 IL�'t:: e
t 5 II
a w � I WORK
AHEAD ��� `NlVM301S \Ii%)
P i0 N �� I( I
ld
lg II
Q CO 4.] , )SK CLOSED �'' PEDESTRu4
.::= IIIIIMMINIMMEI 4 L WAIJ(WAY /
ji
iTi 6 I it
DETOUR
j Q 11 tt"s* may'
2:1110.133 / SIDEWISE lano�D1" of ,l30 J ti �,
USE OTHER SIDE l Yr J f 4 CR
ROAD 4
_// ROAD
.11
a 1* 11 II WORK
AHEAD WOFtK
AHEAD
4�4 ROAD 414 l'-_ -- �l
• AHEAD
CROSSWALK CLOSURE AND SIDEWALK DETOUR SIDEWALK DIVERSION
PEDESTRIAN DETOUR
LAST 2 DESCRIPTION:0 FY 2019-20
REVISION ` FDOTl PEDESTRIAN CONTROL FOR CLOSURE OF SIDEWALKS INDEX SHEET
11/01/17 W • wow-- STANDARD PLANS 102-660 1 of 1