Loading...
Exh 4A c rPR EPARED -7/05/00, -8-18-47 - ----------....- ---~-LICENSE-ACTIVITY REPORT----NEW -LICENSES..-._--...-_.._.._ .... ._. .. ._f__ _ P.ACiF- ~ CI TY OF ATLANTIC B EACH FOR PERIOD FROM 6/Di/00 TO 6/30/00 . PROGRAM OL1221 FOR ALL DEPARTMENTS lI C - CTRL - BUSINESS NAME ISSUED TYPE CLASS DESCRIPTION - - BUSINESS ADDRESS - - ~ OWNER NAME - - - .BUS PHONE -_.__.._._.____ _____,.,~ e SUS. CITY ST ZIP OWNER ADDRESS ~~*1 -- ------ -----~.---- ----------- .~--..~--------..----~•---- -~•---..-.~---- --••--------------..--.~-----.~----..------------------------- ------------ - 3 ; 00 04852 4699 COLOR MY HEART, INC, b/01/00 .NEW S325 MISC_ SERVICE ESTABLISHMENT, NOT 'LISTED L ~' 1038 EAST COAST DR LYNN SUZANNE HOSEUS -904- 247-0208 .;,` ATLANTIC BEACH, FL 32233 1038 EAST-tOAST DRIVE, ATLANTIC BEACH, FL.32233 _._ ..__~__~_~ 3: . 3 00 04853 3357 SALON FLEET LANDIN6 b/OS/DO NEW PS40 COSMETOLOGIST ,, .' 1 FLEET LANDING BLVD ZAMORA, RENEE L. -904- 246-9000 •: •_' ATLANTIC BEACH, FL 32233 12599 ASHMORE GREEN DR. N., JACKSONVILLE, FL 32246 ;; 00 04854 4700 GUIIIFORD & ASSOCIATES, INC. 6/07!00 NEW 5205 - FINANCIAL CONSULTANT -. _ .__.-._.__. ,~ ... _..._._~__.. ___....____.., " 75 BEACH AVE WILLIAM I. GUILIFORD -904- 246-8389 _ ' ATLANTIC BEACH, FL 32233 75 BEACH AYE., ATLANTIC BEACH, FL 32233 :9. r ., 00 04855 4701 DONALD 8000HIE TRIM CARPENTRY 6/09/00 NEW 5120 CARPENTRY 901 OCEAN BLVD -82 DONALD L. BOUCHIE -904- 249-742b ATLANTIC BEACH, FL 32233 9D1 OCEAN BLVD., -82, ATLANTIC BEACH, Fl 32233 ._ 00 04856 47D2 IMAGE PLUS DETAILING b/1b/OD NEW 5040 AUTO- CUSTOMIZING/DETAILING • 1089 ATLANTIC BLVD -15 CATHY A. MARTIN -904- 249-3521 _. _.._. ATLANTIC BEACH, FL 32233 2068 CHELWOOD CT., ATLANTIC BEACH, FL 32233 ' DO 04857 4703 MICHAEL IANIER'S CLEANING SERV 6/19/00 NEW S145 "CLEANING/JANITORIAL/MAID SERVICE _ 1914 MARY ST MICHAEL LANIER -904- 246-0643 _ ATLANTIC BEACH, Fl 32233 1914 MARY ST., ATLANTIC BEACH, FL 32233 ` 00 04858 4704 STARBUCKS COFFEE -8364 b/21/00 NEW S420 RESTAURANTS 3b3 ATLANTIC BLVD LEANN EVANS -20b- 318-8705 ATLANTIC BEACH, FL 32233 611 PONTE VED.LAKES 8VD -14D3, PONTE VEDRA, FL 32082 -. ... 00 04859 4705 MIKE O'SAEA CONSTRUCTION 6/22/00 NEW S320 MINOR CONTRACTOR -MISC. ODD JOBS/REPAIR- 1750 MAIN ST MICHAEL K. O'SHEA -904- 241-4951. •° ATLANTIC BEACH, FL 32233 1750 MAIN ST., ATLANTIC BEACH, FL 32233 00 04860 4706. PCS DIVISION, INC. b/23/DO NEW R24D MISCELLANEOUS SALES, OTHER THAN LISTED. ~ , 535 -J ATLANTIC BLVD BRIAN JONATHAN SMITH- -904- 242-8460 ___ ATLANTIC BEACH, FL 32233 125 LAS PALMAS LANE, PHNTE VEORA BEACH, POOTE yEDRA, Fl 32082 .~, =: TOTAL NUMBER OF NEW LICENSES- 9 NEW, PAYMENT PENDING- 1 NEW, ACTIVE- g TOTAL NUMBER OF LICENSES PROCESSED- 9 TOTAL, PAYMENT PENDING- 1 TOTAL, ACTIVE- g ~_ ~C ~+ O._. [J fl ~. PUBLIC WORKS PROJECT STATUS REPORT DESIGN ENGINEER, C~ DEPARTMENT ~ &n =CONSTRUCTION ENGINEER (C) =CONTRACTOR PROJECT DESCRIPTION PROJECT NO. STATUS ON 6/30/00 1. Village of Mayport ) =USCG & JEA Force main installation and tie in for Coast Guard Station has been completed. The D i 100% l C I = JEA & Public Works ~ i = lift station is 92% complete, installation of sanitary sewer is 50%complete, water is es gn - comp ete 1 C) ett coat Contracting - to USCG Station i 60% complete, and the force main is 50% complete. Roadwaqq work is 90% h C) =Un ted Brothers -North of USCG Station complete, drainage is 5% complete, and electrical condmt is S% complete. T e Construction - 33% complete scope of work was increased to add substantial electrical work and drainage. 2. Core City Stormwater Project ~ CORE99 Stormwater & Water - A & O met with SRC 5/16!00, and met with City (D) =Original by England, Thims & , omrrussion Staff is evaluating inverted crown, slotted drain pipe and Stormwater 8c Water - Miller cold-in-place recycling. Preliminary Design 90% Revised Preliminary Design by The com fete. p R-A-M Professional Gmu Re d i b Aik h d &pOd Sewer -City Commission awarded bid for Core Ci Sanitary Sewer Pro eet to I i~ I 5/22/00 t ld 6/6/00 P ti n C f e Z~ h Sewer -Design 100% complete - es gn y en ea om for stormwater & water, n s orm, nc, on recons ruc on . ewspapers . o e nce e ran notification of starting date of 6/19/00 for this work. Contractor completed. Sewer Construction -S% Sewer design by Public Works. (C) =Video Industrial Services Inc. (for initial cleaning & televising for CIPP installation 6/29/00. complete , sewer televising~)) Florida Rural ~0"ater Assoc. (For smoke testing) T i f ns tu orrn Technologies, Inc. (for sanitary sewer rehabilitation) (CE&I) =Public Works 3. Wonderwood Connector Utility The R-A-M Professional Group, Inc. ~~ Completed installation, pressure testing of 6-inch water main at Apollo Drive. Relocation &I) = JTA, JEA & Public Works Contractor received Army Corp of Engineers permit in late January, and began D i 100% l (C) =Superior Construction Co. critical roadway work. Force main connected at May~ort Road and Wondenvood es gn - comp ete Road. Major conflicts found at southeast corner of Wonderwood and Mayport Construction - 75%com fete (o Atl ti B h k Road. Re-routing and valuing of A.C. water line completed. R-A-M completed design of additional 6-inch water main from Apollo Drive toward Mayport Road, ' n an c eac wor and permit application received 6/16/00. , 4. 1999 Stormwater Improvements Project (stonnwater (D) =Smith & Gillespie Engineers, Inc. C Petticoat Contractin Inc Contractor has substantially completed work. Final inspection held 4/26/00. C t t l t d hli t it d d t it b b nt g, . on rac or comp e punc e s ems, an nee s o su as- m u s. improvements at various C I) =Public Works locations) Design -100 % complete Construction -100% co»plete 5. Buccaneer Wastewater (D) = Eder Engineering Finai inspection was held 4/28/00. Contractor began painting the two additional Treatment Plant Expansion. C)) Meadors Construction Ca. ~ tanks on 5/9/00 as extra work, and is working on punch list items. Existing digester CE&I) =Gannett Fleming Engineering found to be severelypitted and engineer to design and estimate costs of a new Design - IOD% complete digester. City Commission approved funds for noise and odor control on 6112/00. Bids for noise enclosures received 6/30/00. Constnretion - 99% complete ~~.. 0 N ~~ o ,~ 0 0 7 6. Atlantic Beach and Buccaneer Sewer System Improvements. CE&I) =Public Works ~D) = ee & Jenson Advised design engineer to revise Qlans to advertise bids on additive alternates 1, 2 & 3. Master wetwell and force main portion of project on hold until completion of Design - 100% complete Sewer Master Plan. 7. Town Center (D) =Glen Mitchell & Assoc. C) = ABBA C t i Palm trees replanted on 2"d block of Ocean Blvd., and parking area opened to bli o Design -1 DO /o complete ons ruct on pu c. Preconstructionmeetmg for landscaping held 3/30/00. A final inspection of the roadwaq and drainage work was held on 4/4/00. Received copy of punch list Constnuciion -100%complete on 4/28/00. Reviewed proposed Town Center maintenance agreement on 6/14/00. 8. Widening of Atlantic Blvd. _ Bridge (D) = H. W. Lochner, Inc. FDOT Two ponds will be constructed by JTA, but not shown on bid plans. Contract awarded to Su erior Con t u ti i l t b tilit F A di ti o ti p s r c on n a e e ruary. u y co r na on mee ng Design -100% complete (C) =Superior Construction Co. was held 4!3!00. A preconstruction conference was held on 518/00. Construction began 6114!00. Construction - <j%complete 9. Mayport Flyover (D) =Pittman, Hartenstein & Assoc. JTA City Commission approved engi'neer's estimate and proposed agreement with JTA on 5/22100 Received uotes rom two co tr t d b th d FloyverDesign -100% complete Connelly 8c Wicker for Atl. Beach C -Superior Construction Co. ~C~I = b . q f n ac ors an o are over approve amount. Design en eer reviewed estimates. Additional funding approved by Commission on 6/26/00. ) Pu lic Works Utility Design -100% camplete Constnection -1 S%complete . 10. Sewer Master Plan (D) =Smith & Gillespie Engineers, Inc. Lift station pumpdown tests and inventory completed. Engineer and technicians are continuin GIS data ent m i bli i f f ti UI l i o SS/o complete. ~ g ry, app ng, assem ng n orma on or ana ys s. Reviewing water billings for correlation with lift station information. Sixty percent submittal extended one month to accommodate further field testing of force main model. Air release valves installed at 6 lift stations by 6/29/00 to obtain additional data for modeling and calculations. 11. Utility Improvements 2000 (D)=Gee & Jenson Engineer has received partial survey information, began design work on 5115/00. Design 90%complete. C) - ~CP&I) =Public Works Ninety percent submittal transmitted on 6/16!00, City staff reviewing. 12. CDBG Project -Manhole rehabilitation in Donner Public Works C3-Gruhn May, Inc. Bids advertised 4/9/00, Pre=Bid meetingg was held 4/28/00. Bids received 5/I 0/00. City Commission awarded contract to Cmihn Ma Inc on 5/22/00 Subdivision CE&I)=Public Works y, . . Preconstruction Conference held 6/1/00. Contractor ordered materials, scheduled Design -100% complete mobilization for 6/26/00. Construction - <S%complete .~ 0 N ~ O O O 7 13. Effluent Structure Repairs (D) - Nadeem Zebouni, Inc. and Public ~Xi k Bids advertised 4/30/00, Pre-Bid meeting held 5/11 /00. Bids received 5/31 /00. C i i d d bid or s omm ss on awar project to low e der 6/12/00. Preconstruction Conference Design -100% complete C)) T.W. Blount, Jr. & Son Contracting Co. ~ scheduled for 7/6/00. C$8cI) =Public Works Construction - 0% complete 14. Milling & Paving (D) = Universal En meering Sciences (Geotechnic ~ Project substantially complete. Final inspection held 6/2/00. Contractor working h li it C b d i i ddi i l illi d i Geotecltnical -100% complete a Public Works specifications) ~ on punc st ems. ontractor su tte pr ce on a m t ona pav m ng an ng for streets m Waterline project area, approved by Commission on 6/26/00. Design Specifications -100% C)) The Milestone ompany ~CE&I) =Public Works complete Construction -100% complete 15. Walkways/Handrails on AB WW P ) =Jim Gilliam and Public Works Bids advertised 5!7/00, received 6/16/00. Project awarded by Commission on T handrails C)) Meadors Construction Co. 6/26/00. CB&I) =Public Works Design -100% complete 16. Replacement of Hydro~pneumatic Tank at Water Pl nt #4 ) =Public Works C)) Gruhn May, Inc. CE&I = b i Specifications completed 2/29/00. Bids advertised 3/5/00. Pre-Bid meeting held 3123/00. Bids received 4/4/00, awarded to low bidder by Commission on 4/24/00. a ) Pu c Works l Preconstruction Conference held 519/00. Contractor has ordered materials. City Design -100% complete statTrequested wntractor delay construction until 9/13100, due to high water u i t p mp ng ra es. Construction < S% complete 17. Painting at Wastewater ) -Public Works ~C Bids advertised S/28/00, due 6/28100. Pre-Bid meeting held 6/14/00. Treatment Plant # 1 ) - Recommendation for award of project will be on Commission agenda for 7/10/00. (CBBcn =Public Works Specifications -100% complete 18. Waterline on Jordon and Francis ) =Connelly & Wicker ~C Received permit from Health Dept. on 6/16/00. for Habitat ) _ C l) =Public Works 19. Roof on Public Works Bldg. (D) =Public Works Work began 6112/00. C) =Commercial Sheet Metal Specifications -100% complete ~C I) =Public Works Constnuction - 80% complete 0 ~~ o 0 0 4A July 10, 2000 m: CITY OF ~t~l~ctrcti~ ~eacl - ~'~+vaida 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDl~ 32233-5445 TELEPHONE (904) 247-5800 FAX (904) 247-5805 SUNCOM 852-5800 Duty 5, 2000 To: Jir~I Hanson, City Manager From: Timmy Johnson, Recreation Director Re: Usage- Report, Community Center, Jurle 2004 .Jim, here is a recap of acfNity at the Adele Grage Community Center for the month of .tune 2000: -~~sat~.~-ce~~n~. ~t GroupfEvent No. of Mtgs/Events Alo. of ReQple ABET Set B4dglPerforman.ces Rehearsals anal 1Norfcsk~ops 16 3'45 Narcot`scs 5 50 Leteehe 2 40 ReceptionsCBoard N4eetings 4 65 Totals 27 470 ~eetir~~ R~o~;l~oot*.m 31 GrouplEVent No, of MtgslEverlts No. of Peapfe A.A. ivieeting 9 100 Board: Meeting ~ $~ CribbagelScrabbte 4 18 State Attorney's t7f ice 1 6 Totals ~ 21 20g Total Number of People using:Theatec- 470 Total Number of Peop4e using Meetil~g Roam- 209 Tota4 Number of Peo 4e usin Adele Gra e- 679 4A July 10, 2000 Summary of Jordan Park activities: • Donner Park Commurirty Center was the host site for a Teen Dance sponsored by the Atlantic Beach Teen Council. The dance consisted of over 1011 local teenagers. Summer Camg began with 4s campers artrf 12 teen volunteers. P-aEns F'resbyte~iarf Church'and'Outre'ach Ministries Kaye organized~votunteers to'com'e'out on 1Nedne~ay's to help out as needed. ° The U.S.D.A. Commodities food give-away was a success this month. 'l g8 famines received commodities. Teenaged voiun#eers worked through the evening bagging boxes for the distril2ution, • Act'~v'tties for the month 'tnclttded feld trips to the movies, Blades Skate Station and a frig to Hannah Park. Surnrrtary of Donner Park activities: ° Jordan. Park Summer Camp sponsored a Piaa Party which consisted of outdoor activities to include #!ag football and basketba!!. • Attended basketball camp at the University of Florida. • Jordan Park children attended field trips along with Donner Park children to Blades Skate Station and a trip to the movies. `Other Adele Grage and Perks ~ Recreation activities incloded: • Oversee the construction of the t_ifeguard Station and Bull lvlemoria! Park. • Held depar#mental meetings regarding budget requests and information. • Completed weekly reports. ° Held special meeting with Recreation Advisory Board ° Attended Grant Workshop with Qavid Thompson in Cocoa Beach, Fionda. • Completed and processed Beautification requisitions and purchase orders. • All other normal departmental activities to include webpage updates, repaired minor city netaiorking problems, attended meetings, eta r"~