Loading...
1735 Maritime Oak Blower DoorEr- je Leakage Test Report (Blower Door Test) Reside .-escriptive, Performance or ERI Method Compliance 2017 .orida Building Code, Energy Conservation, 6th Edition Jurisdiction:Permit j�Job information Builder: ��A-sj Community: Lot: Address: City: State: r�p �r Zi 3 -Z 7- Air Leakage Test Re3u Rasing results must meet either the Performance, Prescriptive, or ERI Method tSDPRESCRIPTIVE METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air Changes per hour at a pressure of 0.2 inch w.g. (50 Pascals) in Climate Zones 1 and 2. PERFORMANCE or ERI METHOD -The building or.dWelling unit gWl. t selected ACH(50) value, as shown on Form R405-2017 (Performance) or ACH(50) specified on Form R405 -2097 -Energy Calc (i x 60 - L�5 � _ Z CFM(50) Building Volume ACH(50) KPASS Whe ACH(50) is less than 3, Mechanical Ventilation installation must be verified by building department. RAfkl A i 7 g -�!•"' Verified as Na ' ,m, vin an air leakage rate of not exceeding (ERI, section on labeled as infiltrati�sb e _ionACH54 or 8406-2017 (ERI): 0.00 Method for calculatin buildin volume: O Retrieved from architectural plans • Code software calculated O Field measured and calculated - - - ••••a• u-119 snag Lie conaucted in accordance with ANSIIRESNE=T/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section 489.105(3)(0, (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecode oflrciat Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Phone: I hereby verify that th above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to mpliance method selected above. Signature of Tester: Date of Test. -,ec- L 7 Printed Name of Tester: License/Certification b �1lG Zi,� Issuing-C�-�� `Z,� t� Authority: !!1312019 12:26:34 PM/� EnergyGaugeO USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 o v . r.f«Ii.I�C�'-•Kf - — _ __ ._-._-�..-"-� _ .:.b: --r�,.a.sa-. -wie :ir Scanned with CamScanner Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction:, qA-k Ark,A�G Permit #: Builder: i,J� Community: N"I c C_ Lot: 14r 'ilek Address:; ;J_� _'16� � 6�1✓Ic-K- t City:AA-k,,A ` e[ v State: Zip: 3 Z2 1�11r �.,@_ ge Tes Resu S Passing results musr"m t either the Performance, Prescriptive; cir ER! Method P.RES�RIPTIV ET}tlD The s ding or e4 � g t hall be tested and verified as having an air leakage rate of not exceeding 7 airy changes erh r_a a ure o , 0 2' nch g 50- cats) in Clirpate Zoijes 1 and 2. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supplv and return registers, if installed at the time of the test, shall be fully open. l Testing Company Company Name: `�J_.jt r v'I\J. Phone: I hereby verify that t Bove Air Leakage results are i accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements accor ' g to the compliance method selected above. F Signature of Tester: Date of Test: Printed Name of Tester: / �'� l� }G Issuing Authority: License/Certification #: EnergyGauge@ USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant software Page 12/13/2019 12:26:34 PM Scanned with Cam canner