Exh 4AAgenda #4A
September 11, 2000
MEMORANDUM
September 1, 2000
TO: Jim Hanson; City Manager
FROM: /~
Don C. Ford, Building Official~c"1
RE: Building Permits Report
Please be advised that the. following permits were issued in the month of August, 2000:
TYPE PERMIT NO. PERMITS PERMIT COST VALUATION
Single Family 3 8,875 470,880
Duplexes
Addition/Remodel 8 1,744 234,036
Swimming Poo ls 1 90 10,000
Commercial 4 2,385 417,800
Fence 3 30 6,800
Utility 10 10,112
Roofing 4 150 10,726
Wells 1 10
Tree Removal 6
Signs 1 45
TOTAL 41 23,441 1,150,242
Miscellaneous permits issued in connec#ion with new construction, additions, remodeling, etc:
Number of Permits Permits Costs
Electrical 36 1,247
Plumbing 48 2,212
Mechanical 20 910
Inspections performed August 2000
Building Concrete Electrical Plumbing Mechanical Trees Occup. Lic.
65 29 44 54 24 45 4
INFORMATION COMPILED BY PAT HARRIS - BU1LDl~FG DEPARTMENT
Agenda #4A
September 11, 2000
CITY OF ATLANTIC BEACH
GITY COMMISSION STAFF REPORT
AGENDA ITEM: Building Permits Report August 2000
SUBMITTED BY: Don C. Ford, Building Official ~C
DATE: September 1, 2000
The following is a comparison report of Building Permits for New Single Family,
Duplexes, Townhouses, Remodeling/Additions and New Commercial for years to date
for August 1999 and August 2000.
Year to Date August 1999
TYPE PERMIT NO. PERMITS CONSTRUCTION VALUATION
Single Family
Duplex Residences
Remodeling/Additions
Commercial
29
16
127
9
$ 4,274,031
1,148,520
2,834,326
368,000
Total
Inspections: Total 1601
New Single Family
Duplex Residences
RemodefinglAdditions
New Commercial
Total
Inspections: Total 1855
181
Year to Date August 2000
26
10
159
18
$ 8,624,877
$ 2,461,632
937,500
4,085,053
3,743,155
213
RECOMMENDATION:
ATTACHMENTS: Building Permit Report for August 2000
$11,227,340
REVIEWED BY CITY
MANAGER:
,
~-!
;x' PREPARED 9/05/00, 8-51-30
CITY OF ATLANTIC BEACH '-
PROGRAM OL122L
LIC - CTRL - BUSINESS NAME
USINESS-ADDRES
BUS CITY ST ZIP LICENSE ACTIVITY
FOR PERIOD FROM
FOR ALL
ISSUED REPORT - NEW
8/01/00 TO
DEPARTMENTS
TYPE -CLASS LICENSES
8/31/00
DESCRIPTION.
. PAGE 1 -
,
._.
-----
-
~-: 01 04873 471b STADIUM SOLUTIONS, INC. 8/01/00 NEW 5325 MISC. SERVICE ESTABLISHMENT, NOT-LISTED -
- 548 NAUTICAL BLVD _
ATL-ANTTC-SE•ACH,-Ft 31!233 - ---
2
01
04874
4718
AMODEO & ASSOCIATES, INC.
8/01/00
NEW
5148
COMPUTER CONSULTANT/SYSTEMS ANALYST
_.
330-A4UA'f I-C-D -,-,
-, ATLANTIC BEACH, Fl 32233 ' -
„ 0't -04875 4719--- -NINA-TEPEDINO-OCE~ANSONG-ST-UD IO-8/02-/00-NEtt- S-24?---I-NSTRUC'TI~ONAI~D~ANCE/MUSIC/FINE-ARTS ----
353 7TH ST --
- ATLANTIC BEACH, FL 32233 -
01 04876 4720 JOSEPH DURANTE WOODWORKS 8/03/00 NEW S120 CARPENTRY
- 320 3RD ST -
- --- 'ATLANTIC -B E-A C H; -Ft-~ 2233 •
~- 01 04877 4721 PETER EMSDEN HOME SERVICES 8!09/00 NEW S305 MANUFACTURER'S AGENT/REPRESENTATIVE
-_- -- - ---- - -160 -BELVEDE-RE-S7
ATLANTIC BEACH, FL 32233
----- 01- 04878' ---4723 fK0 ENTERPRISES INC.------ -----8/09/00 NEW- 5325 MIS C:-SERVICE-ESTABLISHMENTS -NOT LISTED',
- 1855 N SHERRY DR
ATLANTIC BEACH, FL 32233
0 1 04879 4724 MOTION IMAGE, INC. 8/15/00 NEW S150 CONSULTANT, NOT OTHERWISE CLASSIFIED
1570 W PARK TER „
-. _.._._ __-_.____ -__..__._ ATLANTIC 'BEACH, ~Fi-32233-----
01 04880 4725 JACK MCLAUGHLIN, DESIGNER 8/09/00 NEW 5146 COMPUTER SERVICES
- -- .------- ----.....-- . 375 3RD -ST-----.._-----
ATLANTIC BEACH, Fl 32233
01 _ .04881 '- ----.4726 JASON BELL------ _.._.._. _-.--__._.- ._. _....--- 8/14/00-_- NEW-- -5120--- ----CARPENTRY-.. - _
467 WHITING LN
ATLANTIC BEACH, FL 32233
01 04882 4727 HENDERSON POOL SERVICE 8114/00 NEW 5385 POOL.SERYICE MAINTENANCE
159 11TH ST ~
_. . ..: ..- ----- -- _ _ ATLANTIC BEACH,. FL -32233_._. -----
----•----- -
------ -
-------- --- ------_ _ _ _ .:_ _ .._ `C3
~
q
01
- 04883
--- - __ 4b95
_ BEAUTY EXPRESS
29 SEMINOLE-RD - ------...... _8/25/00 _-
- -- .. NEW _ P540 COSMETOLOGIST U
ATLANTIC BEACH, FL 32233 -
_ _ --- - - __ - ----.. ~ ~
~
~,
01 04884 4728 EASTERN SURFING PRODUCTS, -LLC- --8/17/00 -- --
148 LEVY RD NEW -- -S325-- ----MISC. -SERVICE ESTABLISHMENT, -NOT LISTED N
O a
ATLANTIC BEACH, FL 32233 - O
_ O
01 04886 4729 DALE CARLYLE DRYWALL SERVICE 8121/00 NEW S175 DRYWALL INSTALLATION
341 AHERN S7
ATLANTIC BEACH, FL 32233.__.. _ _._.....--.----- -------- .-------- --...._.-._.
PREPARED 9105/00, 8-51-30 LICENSE ACTIVITY REPORT - NEW LICENSES ~ PAGE ~ 2
CITY OF ATLANTIC BEACH ,. FOR PERIOD FROM 8/01/00 TO 8/31/00
PROGRAM OL122L
-
--------------------------- FOR ALL
------------------- DEPARTMENTS
-------------
----------------------------------------------------
--------
LIC - ---------
CTRL -
-
BUSINESS NAME
ISSUED
TYPE CLASS ---
DESCRIPTION
;~ SUSTNESS ADDRESS
'- BUS CITY 5T ZIP --
.~; -
01 04887 4709 BEACHES BAIL BONDS 8/21/00 NEW S325 MISC. SERVICE ESTABLISHMENT, NOT LISTED -:
- 535 -L8 ATLANTIC BLVD
- ATLANTIC-BE~ACFt; FL~2233 -.
-= 01 04888 4730 CHRISTOPHER ADRIAN ERWIN 8/21100 NEW S325 MISC. SERVICE ESTABLISHMENT, NOT LISTED
331~AHERN-ST -
„- ATLANTIC BEACH, FL 32233 '
,~ ~T1-04889 4731 JOSEPH-RZLeY•S-ReMODEtTNG8-/-23/00 NEW-5320 MINOR-CONTRACTQR =Misc.-oDD-JOBS/REPAIR------_-
-- 120 MAY PORT RD -17
- ATLANTIC BEACH, FL 32233
- 01 04890 3023 ADESSA HAIR & NAIL DESIGN 8/28/00 NEW P540 COSMETOLOGIST
~-' S0 OCEAN BLVD
~:3 ...-~- __~~___.-_._.-...
--~-'' -°-~"~ATLANTIC-BEACH~-Ft 32233 -- ---'
01 04891 4732 KING FOOD DISCOUNT -1 8/31/00 NEW Ri00 CONVENIENCE STORE
-- --~ 31 -SEMINOL-E-RD
ATLANTIC BEACH, FL 32233
-_- TOTAL NUMBER OF NEW LICENSES- 18
NEW, ACTIVE- 18
TOTAL NUMBER OF LICENSES PROCESSED- 18
TOTAL, .ACTIVE- -,; 18
_ ^.:.r
PUBLIC WORKS PROJECT STATUS REPORT (D)=DESIGN ENGINEER
DEPARTMENT (CE&I)=CONSTRUCTION ENGINEER
(C)=CONTRACTOR
PROJECT DESCRIPTION PROJECT NO. AND INFORMATION STATUS ON 9/1/00
1. Village of Mayport (D)=USCG &JEA Force main installation and tie in for Coast Guard Station has been completed.
(CE&I)=JEA &c Public Works The lift station is 92% complete, installation of sanitary sewer is 50% complete,
Design -100% complete (C)=Petticoat Contracting (to USCG Station) and the force main is 50% complete. Roadway work is 90% complete, drainage is
(C)=United Brothers (North of USCG Station) 17% complete, water is 82% complete, and electrical conduit is 32% complete.
Construction - 43% complete The scope of work was increased to add substantial electrical work and drainage.
2. Core City Stormwater Project CORE99 Aikenhead & Odom gave a presentation to the City Cormmission on 7/24/00, and
(D)= Original by England, Thims & Miller met with the SRC on 8/10/00. A Public Hearing is scheduled for 9/7/00 at 7PM
Preliminary Redesign - 95% Revised Preliminary Design by The at the Atlantic Beach Elementary School. The Public Works Director and City
complete R-A-M Professional Group Manager are negotiating a contract for fmal design.
Re-Design by Aikenhead & Odom
3. Core City Sanitary Sewer PW0002 City Commission awarded bid to Insituform Technologies, Inc. on 5/22/00.
Improvements Project (D)=Public Works Preconstruction Conference held 616/00. Completed cured-in-place piping of
(CE&I)=Public Works sewer mains on 1°'tlvough 10°i Streets by 8/18/00. Finished replacement of sewer
Design -100% complete (C)=Insituform Technologies, Inc. services on 1" Street, and began replacement of services on 2°d Street.
Construction -30% complete
4. Wonder•vood Connector: Utility (D)=The R-A-M Professional Group, Inc. Force main connected at Mayport Road and Wonderwood Road. Re-routing and
Relocation (CE&I)=JTA ,JEA, and Public Works valuing of A.C. water line completed. R-A-M completed design of additional 6-
(C)=Superior Construction Co. inch water main from Apollo Drive toward Mayport Road, and permit application
Design -100% complete received 6/16/00. Completed pressure testing and tie-in of both force mains.
Construction - 85% complete Completed pressure and bacteriological testing of water main and received Health
D
epartment clearance.
for Atlantic Beach portion
S. Buccaneer Wastewater (D)=Eder Engineering Final inspection was held 4!28/00. Contractor began painting the two additional
Treatment Plant Expansion (C)=Meadors Construction Co. tanks on 519/00 as extra work, directed to only patch and prime after determining
(CE&I)= Gannett Fleming Engineering condition of tanks warranted replacement. City Commission approved funding for
Design -100% complete design of replacement sludge holding tanks on 7/24/00, and approved funds for
Construction - 99% complete noise and odor control on 6/12!00. Noise reduction enclosures delivered 8/23,
installation scheduled for week of 9/5/00. Odor control system scheduled for
delivery week of 9/5/00.
'~
i vo
~ ~
~'
K ~
N
0
0
6
• Atlantic Beach and Buccaneer
Sewer System Improvements (D)=Gee & Jenson Project on hold until completion of Sewer Master Plan.
Design -100% complete
7
. Town Center (D)=Glen Mitchell & Assoc.
(C)=ABBA Construction Final inspection of roadway and drainage work was held on 4/4/00, and copy of
Design -100% complete punchlist received on 4/28/00. Final inspection of landscaping work held on
7/19/00 and contractor is working on punchlist items. Meeting with contractor
Construction -100% complete held 8/22/00.
8. Widening of Atlantic Blvd.
Bridge (D)=H. W. Lochner, Inc.,
FDOT Contract awarded to Superior Construction Co. in fate February. A utility
Desi
n -100%
l
(C)=Superior Construction Co, coordination mceting was held on 4/3J00, and a preconstruction conference was
held on 5/8/00. Construction began 6/14/00
g
comp
ete ,
Construction - S% complete
9
. Mayport Flyover (D)=Pittman, Hartenstein & Assoc. Additional funding for water line relocation approved by City Commission on
Flyover Design -100%
l JTA
Connelly & Wicker for Atlantic Beach 6/26/00. Preconslxuction conference for Atlantic Beach work held on 8/2/00.
FDOT permit received
waiting for BellSouth t
l
comp
ete
(C)=Superior Construction Co.
(CE&I)=Public Works ,
o re
ocate cables prior to start of
water line relocation. Water line relocation scheduled to begin the wcek of 9/5/00.
Construction - 20% complete JTA
overall, <S% for utility
relocation
Utility Design -100%
complete
10
, Sewer Master Plan (D)=Smith & Gillespie Engineers, Inc. A 60% submittal was received on 7/19/00, and comments returned to engineer. A
60% complete presentation for the City Commission was held on 8/28/00.
11
. Utility Improvements 2000 (D)=Gce & Jenson
(C)° Advertised for bids 8/13/00, with bids due 9/13/00. A Pre-Bid meeting was held
Design -100% complete
(CE&I)=Public Works 8/31/00.
12
. Manhole Rehabilitation 2000
(CDBG Project) (D)=Public Works
(C)=Gruhn May
Inc Final inspection held 8/24/00. Contractor completed punchlist items by 8130!00.
,
.
(CE&I)=Public Works
Project complete.
Design -100% complete
Construction -100% complete
b
;a
~~
N
O
O
O
13. Effluent Structure Repairs (D)=Nadeem Zebouni, Inc. and Public Works City Commission awarded project to T.W. Blount on 6/12/00. Preconstruction
(C)=T. W. Blount, Jr. & Son Contracting Co. conference held 7/6/00, Contractor has ordered materials for r aus awaitin
~ g
Desi n -100 % com fete
g P (CE&I)=Public Works delivery. Delivery scheduled for 9/7/00.
Construction - <S% complete
14. Milling & Paving (D)=Universal Engineering Sciences Original project construction complete. Additional milling and paving for streets
Geotechnical -100% complete (Geoteehnical)
Public Works (specifications) in some areas affected by the 1999 Water System Improvements Project was
approved by City Commission on 6/26/00. Milling and paving of those areas
(C)=The Milestone Company completed 8/31/00.
Design Specifications-100% (CE&I)=Public Works
complete
Construction -100% complete
for original work, 100%
complete for additional work.
15. Walkways and Handrails at AB
WWTP (D)=Jim Gilliam and Public Works Project awarded to low bidder by City Commission on 6/26/00. Preeonstruction
{C)=Meadors Construction Co. conference held 7/13/00. Contractor has ordered supplies and material''
(CE&I)=Public Works fabrication.
Design -100% complete
Construction - <5% complete
16. Replacement of
Hydropneumatic Tank at Water (D)=Public Works
(C)=Gruhn Ma
Inc Project awarded to low bidder by City Commission on 4124/00. Prewnstruction
f
Plant #4 y,
,
(CE&I)=Public Works con
erence held 5/9/00. Contractor has ordered materials, and has delayed
i
'
construct
on start until mid-September at staff
s request, due to high water
Design -100% complete pumping rates.
Construction - <S% complete
17. Painting at Wastewater
Treatment Plant # 1 (D)=Public Works
(C)=Richard Thom
son
Inc Project awarded to Iow bidder by City Commission on 7/10/00. Contractor has
d
d
p
,
.
(CE&I)=Public Works or
ere
materials. Preconstructionmeeting held 8/7/00. Contractor started work
Speci, fications -100% on 8/14/00.
complete
Painting - 60% complete
v~
'~
~~
~ ~
.p
N
0
0
0
18. Waterline on Jordan and (D)=Connelly & Wicker Water line installation complete, awaiting Health Department Clearance,
Francis for Habitat (C)=Braddock Construction Co.
(CE&l)=Habitat, Public Works
Design -100% complete
Construction - 90% complete
19. Beach Renourishment (D)=Army Corps of Engineers Project has been rescheduled to begin in the winter. Sand will be dredged material,
not trucked material.
'~
~ ~
Na
0
0
0