Loading...
633 Aquatic Dr RES20-0089 window info 4 of 4StyleView Flange Vinyl Window System Installation Manual For New Construction SYSTEM DESCRIPTION • Variations: Single Hung, Double Hung, Picture, Transom, Geometric • 3-1/4” Overall Depth with Flange • Tilt-in Bottom Sash • 3/4” Insulating Glazing • Optional Screens • Grille options available Simulated Divided Lines Sculptured Grids Between Glass Flat Grids Between Glass • Available in White, Tan, Stone, and Bronze Colors ©2020 YKK AP America Inc. SINGLE / DOUBLE HUNG WINDOW PICTURE / TRANSOM WINDOW GEOMETRIC WINDOW Effective Date: February 12, 2020 | 20-4010-01 StyleView Flange Vinyl Window System Page-i TABLE OF CONTENTS Installation Notes ................................................................................. Page ii & iii Tools You’ll Need ................................................................................ Page iv PREPARATION Measure Rough Opening and Install Sill Anchor ................................ Page 1 INSTALLATION Install Window ..................................................................................... Page 2 FINISHING Sealant and Insulation ......................................................................... Page 3 20-4010-01 | Effective Date: February 12, 2020 StyleView Flange Vinyl Window System Page-ii INSTALLATION NOTES 1. Do not drop, roll or drag boxes of vinyl windows. Move and stack boxes with proper support to prevent distortion. If fork lifts are used, be especially careful about striking the boxes when lifting or moving. 2. Store in a dry, out of the way area. If rain exposure, condensation or any water contact is likely, then all packaging material should be removed. Wet packaging materials will discolor and may stain vinyl finishes. 3. All materials should be checked for quantity and quality upon receipt, YKK AP must be notified immediately of any discrepancies in shipment. 4. Check to make sure that you have the required shims, sealants, supplies, and tools necessary for the installation (not supplied by YKK AP). 5. Carefully check the openings and surrounding conditions that will receive your material. Remember, if the construction is not per the construction documents, it is your responsibility to notify the general contractor in writing. Any discrepancies must be brought to the general contractor’s attention before you proceed with the installation. 6. Collect your shop drawings, materials, packing list, and this installation manual. Carefully review parts location, the sequence of installation, when you glaze it, and how you seal it. Installation instructions are of a general nature and may not cover every condition you will encounter. The shop drawings and/or installation manuals were prepared specifically for the product. 7. Any material substitutions must be of equal or greater quality. 8. Make certain that material samples have been sent for compatibility testing for all manufacturer’s sealants involved. Make certain that sealants and backer rod have been installed in strict accordance with the manufacturer’s recommendations and specifications. 9. System-to-structure fasteners are not supplied by YKK AP. Fasteners called out on shop drawings are to indicate minimum sizes for design loading. 10. If any questions arise concerning YKK AP products or their installation, contact YKK AP for clarification before proceeding. 11. YKK AP window installation is typically completed before drywall, flooring and other products which may still be in process. Take the extra time to wrap and protect the work produced. Effective Date: February 12, 2020 | 20-4010-01 StyleView Flange Vinyl Window System Page-iii INSTALLATION NOTES 12. YKK AP StyleView windows are pre-finished, prefabricated, preassembled, and preglazed products, and must be protected against damage. 13. Concrete, mortar, plaster, muriatic acid and other alkaline and acid based construction and cleaning materials may be very harmful to window hardware and should be removed with water and mild soap immediately or permanent damage or staining of the finishes will occur. A spot test is recommended before any cleaning agent is used, and abrasive type cleaners must never be used. 14. Windows are never to be used as ladders, step stools, scaffolds, scaffold supports, or as pass through openings for materials. 15. All work must start from, and be referenced to benchmarks, offset lines and/or column centerlines established by the architectural drawings and the general contractor. 16. All windows must be installed plumb, square, level and true, and in accordance with approved shop drawings and these installation instructions. 17. Install all windows in accordance with their mark and type per approved shop drawings. 18. Do not use brick wash after windows are installed. Doing so will void the window warranty. 19. Windows should never be stored in an area where temperatures will exceed 140° F. Doing so will void the window warranty. 20. Windows should never be painted. Doing so will void the window warranty. 21. Buildings constructed prior to 1978 may contain lead paint which could be disturbed during replacement. For more information on proper management of lead paint, visit www.epa.gov/lead 22. The glass has been specified by shop drawings and YKK AP is not responsible for conformance with local building codes other than to provide the approved glass. It is the installer’s responsibility to ensure final compliance of the glazing with all applicable codes. 23. Check our website, www.ykkap.com, for the latest installation manual update prior to commencing work. 20-4010-01 | Effective Date: February 12, 2020 StyleView Flange Vinyl Window System Page-iv TOOLS YOU’LL NEED Tape measure Color-matched interior/exterior silicone window and trim sealant Level House wrap tape Power screwdriver and bits Felt paper fl ashing or equivalent (at least 6” wide) Galvanized roofi ng nails or #8 pan head corrosion-resistant screws (capa- ble of penetrating at least 3/4” into the framing structure) Flashing (at least 6” wide) 1/4” Shims Rubber mallet or hammer Caulk gun Remnant fi berglass insulation Effective Date: February 12, 2020 | 20-4010-01 StyleView Flange Vinyl Window System Page-1 DETAIL 1 DETAIL 2 STEP 1: Prepare the Opening Note: Installation of fixed picture windows with flanges is the same as that for single hung, except for operation of moveable window sashes that are not on fixed windows. -Ensure the rough opening is 1/2” larger than the window to be installed and that the rough opening is plumb and square. See Detail 1. Note: The frame size of the window does not include any protruding flanges. -Close and and lock the sash(es) to help keep the unit square. -Place the sill anchor plate on the pre-cast sill, and position it approximately 5/16” back from the outside edge of the buck. Shim to level if necessary and secure the sill anchor plate to the pre-cast sill with #10 x 2” Tapcon® masonry fasteners. See Detail 2. -Apply a continuous bead of silicone caulk to the perimeter of the rough opening where the nail fin will make contact (at the edge of the rough opening.) Leave two 3” gaps for weepage at the sill flashing as shown. PREPARATION Rough Opening (R.O.) Frame Width = R.O. - 1/2” 1/4”1/4”Rough Opening (R.O.)Frame Height = R.O. - 1/2”1/4” 1/4” Sill Flashing Sealant 6” 6” 3” 3” Sill Anchor 20-4010-01 | Effective Date: February 12, 2020 StyleView Flange Vinyl Window System Page-2 INSTALLATION STEP 2: Install the Window -Set the window into the opening from the outside so that the flange makes contact with the outside surface of the wood buck and pre-cast sill. See Detail 3. Make sure the sill anchor plate interlocks with the bottom of the window to assure integrity of the sill under negative and positive pressure. See Detail 4. -Center the window in the opening and check to make sure it is plumb and square. Take diagonal measurements to ensure the unit is square. Opening the bottom sash of the double hung window approximately 1/4” will provide visual confirmation of proper setting, that the reveal between the frame and sash (A & B) are equal the entire width. See Detail 5. -Shim as required between the rough opening and the window frame at every installation hole locations.ABDETAIL 3 DETAIL 4 DETAIL 5 Sill Sill Anchor Effective Date: February 12, 2020 | 20-4010-01 StyleView Flange Vinyl Window System Page-312”Sealant Flange Sealant Jamb / Head INSTALLATION STEP 2 (Continued) -Secure the window in the opening through the pre-drilled holes in the head and jambs using fasteners. To access the installation screw holes, use a putty knife to remove the snap-in cover or screw track cover as shown in Detail 6. Replace the covers after the screws are set. All fasteners must have a minimum 1-1/2” penetration into the masonry. STEP 3: Finishing -From the exterior, caulk along the flange of the window to ensure a watertight seal as shown in Detail 6. -Operate the window (for single or double hung) to confirm proper installation. -Apply fiberglass insulation to the cavity between the window and rough opening structure. -From the inside of the window, apply continuous sealant to the interior perimeter of the window sill and 12” up the jambs as shown in Detail 7. Notes: -Do not use expanding or spray-in foam products. If the installer used one of them, make sure jambs remain straight to ensure the operation of the window is not impeded. -If using brick or stone exteriors, leave a 1/8” gap from the window to allow for brick and mortar expansion. Use a backer rod and silicone caulk to seal the gap. DETAIL 6 DETAIL 7 YKK AP America Inc. Headquarters 270 Riverside Parkway Suite 100 Austell, Georgia 30168 Residential Division 4234 Ocmulgee East Blvd. Macon, Georgia 31217 www.ykkap.com