Exh 8GAGENDA ITEM #8G SEPTEMBER 25, 2000 AGENDA ITEM: SUBMITTED BY: DATE: CITY OF ATLANTIC BEACH CITY COMMISSION MEETING _ STAFF REPORT Proposal for Final Design and Permitting from Aikenhead & Odom, Inc., Consulting Engineers for the Core City Project. Robert S. Kosoy, Director of Public Works September 19, 2000 BACKGROUND: The consulting engineering firm of Aikenhead & Odom, Inc. has completed the Project Approach and Preliminary Engineering Design Phases for the Core City Stormwater/Water/Sanitary Sewer Line Project. The Public Hearings on each phase were held on November 17, 1999 and September 7, 2000. After discussions and resubmittals, Aikenhead & Odom, Inc. has submitted a revised Scope of Services and Fee Proposal for Final Design and Permitting. Although their fee for this effort has increased from their previous 1999 estimate for Final Design, their construction cost estimate has been reduced significantly due to innovative techniques developed in the Preliminary Engineering Design Phase. The current construction. cost estimate is estimated not to exceed $6,800,000, vs. the original estimate of $6 to $11 million dollars. BUDGET: Funding for this Final Design and Permitting work is budgeted in FY 2000-O1, Utilities Funds. RECOMMENDATION: That the Mayor and Commission authorize execution of the Final Design and Permitting proposal dated September 19, 2000 in the amount. of $639,894.11, and that additional monies.. for subconsultants be negotiated directly by staff as required. ATTACHMENTS: 1. Aikenhead & Odom proposal dated 9/19/00. 2. Comparison of engineering costs for other similar projects in Jacksonville Beach. REVIEWED BY CITY MANAGER: Per our August 28 fee and. scope submittal, subsequent meetings and -discussions, subsequent September 12 revised fee and scope submittal, and our meetings and discussions with Bob Kosoy today, attached is a second, and final, Revised Scope of Services and Fee Proposal which reflects all of the issues addressed in our September 12 submittal plus those matters discussed. in today's meeting. These agreements have resulted in a mutually agreed to Scope and Fee for Aikenhead & Odom (A&O) to complete the Final Design for Atlantic beach. Below is a brief outline of today's agreed-to scope and manhour revisions: 1. One of our most critical issues involved analysis for reconstruction of the Core City streets to inverted crown. As everyone agrees, missing existing tree canopy, roots, and existing infrastructure while having design. reliability regarding storm flow management within the final right-of--way is a design necessity. Bob Kosoy suggested A&O provide- additional surveyor. coordination for the surveyor to obtain more definitive data along-critical streets than initially anticipated. This will allow A&O to design critical areas with'less field investigations and cross-checking by our engineering staff. This is reflected in a reduction of the design effort on the cross sections from 3.00 to 2.25 hours per cross section, and we have also-.agreed riot to increase our surveyor coordination time from our prior submittal. 2. Bob Kosoy requested, and we have agreed to, a further reduction of manhours for the low-flow stormwater pump stations, which totals a reduction from 440 hours to 356 hours. 3. Bob Kosoy requested, and we have agreed to, a reduction in the manhours for erosior~d sediment control. We have reduced hese from 8 hours to 6 hours per sheet for both t1ie\'\~~ roadway and the drainage sub-sections of the sheets. , ` Y ~~~~, 4. We agreed to reduce review submittals by eliminating the 30% submittal, prow submittals at 75% and Final only. It was agreed some "informal" coordination ~, .sF "~'~ des gn1 ~9 ~ %~,~, Rub ~~Op `. ~~:~ ~ \ `, . ~. • AGENDA ITEM #8G • ~ SEPTEMBER 25, 2000 i. ,. ' Mr. Jim. Hanson . ~ - ` • .. ., City of Atlantic Beach Capital Improvements Project Professional. Engineering Services, Final .Design P. base, Second Revised Scope and Fee Proposal _ . September 18, 2000 ` : - _: _: ,_ _: -:Y --- _ _ Page 2 of 2 Works, prior to our initia175% submittal, would be required for.specific issues not clearly .:defined by the Study, and this has been detailed in the ,attached Revised Scope. This is not • anticipated to be necessary for the Sherry Drive design. ~ . 5. :Based on prior discussions, and overlooked in our,September 12 Scope submittal, A&O will hold one (1) meeting with the City Commission following the Final Design submittal of the "Final Construction" {not anticipated necessary for the Sherry Drive design) to provide a brief verbal report describing .the final project design and updating the engineers cost estimate. Other .coordination with SRC and City Commission will be through Public Works. Major issues within~the final design scope now being considered remain unchanged from our September. l2 submittal, and .are summarized therein.. As also noted in that submittal, there is a substantial increase in desi ; ng~~, effort in order to achieve the desired decrease in construction scone and cost for this project. Despite this fact, our proposed man-hours per sheet and fee as percentage of construction cost are well within industry standards. A&O has. a great deal of personal involvement and professional pride in our accomplishments to date on behalf of Atlantic Beach. We have made every possible effort to limit design`scope without jeopardizing the final project effectiveness for the City. We greatly appreciate the effort you and Public Works have,made to recognize the complexity of this design and to work with us to achieve the ultimate goals of the residents. Our attached revised fee reflects a figure slightly :below the $640,000 which was mutually agreed to today, and we are certain everyone concerned will come to recognize this as a very sound investment for Atlantic Beach. We are looking forward to working with you, Public Works, and the City to achieve a timely, cost- effective, and low-impact series of projects for the residents of this beautiful community., If you have any questions, please call at your ear ' cony eme n~~1,,,_ Sincerely, .~ ~ , __.. ... . L Neil Aikenhead, P.E. President Encl. (Rev Scope of Servs, Rev Fee Proposal, Prelim/Draft Schedule) c: Bob Kosoy, Public Works Director, w/ encl F:IPRO7ECTSIALI-Bch-Sm~wtrlFee ProposanFinal-DesignlSubmU-L~-3.azk.wpd AGENDA ITEM #8G SEPTEMBER 25, 2000 FINAL DESIGN and PERMITTING Aikenhead & Odom September 18, 2000 Aikenhead & Odom (A&O) will provide Engineering Design Services (Design) to the City of Atlantic Beach (City) for a Capital Improvements Project (Project) involving Final Design of modifications to the existing City-wide master stormwater system, select Core-City street and drainage systems, and select Core-City water distribution systems, all as detailed herein. Sanitary sewer system modifications/design will be accomplished by City forces independent of A&O effort, with the exception of sanitary sewer on 1 l~` and 12~' Streets, which design will be included. A&O will utilize~the results of the multiple alternative scenarios run with the detailed hydrologic SVJMM model, all input gathered from sub-consultants, City Commission, Stormwater Review Committee, the public, and meeting with applicable regulatory agencies, all as reported in the Preliminary Design Report. This will form the basis of all design effort as detailed within this Scope of Services. The Project Approach Phase and the Preliminary Design Report Phase of this effort have been satisfactorily completed. The following scope details the effort to be accomplished under the Final Design and Permitting Phase. 1. Public Hearin: A&0 has held a Public Hearing on September 7, 2000 at the Atlantic Beach Elementary School to present the overall status of the project prior to commencing Final Design. A&O has provided a detailed verbal report with presentation graphics to describe the Preliminary Design Report findings and to update the cost estimate. Input from comments during this meeting will be incorporated in the Final Design as mutually agreed by A&O and City. 2. Limits of Final Design: Based on coordination with Public Works and City personnel, and the in accordance with the Final Concept Plan, the Final Design will include the following: Atlantic Beach, Final Design & Permitting, Scope of Services Page 1 of 7 ' AGENDA ITEM #8G SEPTEMBER 25, 2000 _ a. Core City~streets will be designed as follows: i. 1~`, 2nd, 3~d, 4~', S~', 6`~, 7`~, 8`~, 9~,10d',11~, and 12`~ Streets, all between East Coast Drive and Sherry Drive, will be re-designed to inverted crown with no curb & gutter to a 20' pavement width throughout (14,500 If). - - -Il.- Ahern, from the Sea Turtle to Sherry Drive,- will be re-designed -within ---_-_= existing (to-remain) curb & gutters, normal-crown cross.=section (f1,4001f). iii. Plaza, from East Coast to Sherry Dr, will be re-designed within existing (to- remain) curb & gutters, normal-crown cross-section (11,200 lf). iv. Sherry Drive will be designed to be lowered, widened to 24' pavement, curb & gutter added, and normal-crown cross-section from Atlantic Blvd to Plaza (~3,2001f). b. In-ground drainage systems will be designed on: i. Ahern, from Sea Turtle to Sherry Dr, incl Sea Turtle parking lot (f 1,4001f). ii. 3rd St, from 300' east of Sherry Drive to Sherry Drive (~3001f). iii. 7`~ St (and Beach Ave), from 8~' St beach outfall to Sherry Drive (2,700 lf). iv. Plaza, from 500' east of Seminole Rd to Seminole Rd (500 lfj. v. 9`~ St, from 300' east of Seminole Rd to Seminole Rd (300 lfj. vi. 10~' St, from 10`~ St beach outfall to Sherry Dr (2,000 lf). vii. 11~' St, from 12d' St to the Selva lagoon (900 lf). viii. 12~' St, from 400' north of 11~' St to l ld' St (400 lf). - 4 ix, Sherry Dr, from Ahern to 8~` St (3,200 lfj. x. Seminole Rd, from Plaza to 11~` St (~1,2001f). c. A maximum of 14 baffle structures will be designed within the above in-ground drainage system areas, including 2 "CDS" units. d. Improved drainage capacity, and associated maintenance capability, will be designed through Howell Park (11,500 if j. e. Design of regrading and stabilization of the existing Seminole Rd ditch between 16~' and Saturiba Drive (~2,2501f). f. A box culvert will be designed under 11~' St at the Selva lagoon. g. Structural revetment of the lagoon banks around the Selva Marina CC main bridge (Bridge #6) will be designed, with associated re-grading of the area. h. Cleaning/dredging ofthe Selvalagoon from Sherry Drive to A-1-A @ Puckett Creek will be designed (13,500 lf). i. A tidal backflow control structure, ~5 cfs pump with 12" force main to headwaters of Sherman Creek (1,000 lf), and a X10 cfs pump over the weir will be designed. Atlantic Beach, Final Desiga & Permitting, Scope of Services Page 2 of 7 AGENDA ITEM #8G SEPTEMBER 25, 2000 The existing large-diameter force main at the box culvert under A-1-A_at Puckett Creek may be designed to be relocated out of the flow line. of the creek. This would include coordination with Jacksonville Beach, Neptune Beach, and Atlantic Beach utilities regarding their respective sewage treatment plant effluent systems. Giavity sanitary sewage collection system will be designed on: i. 12`~ St, from East Coast to i 1~ St (~1,2501f, includins new water design). ii. 11~' St, from East Coast to Sherry Dr (~1,3001f). 1. Potable water distribution system will be designed on: i. Ahern, 2na St, 4~' St, 5`~ St, 6~' St, 7~' St, Plaza, and 10~' St, all from East Coast to Sherry Dr (~9,8001f total). ii. East Coast Drive, from Ahern to 10~' St (~3,6001f total). 3. Dirt Street "Dust Control" Stabilization: A&O has obtained confirmation that a`.`cold in- placerecycling" process of the existing asphalt streets can be accomplished for all Core-City streets. This process will avoid substantial costs for the necessary street reconstruction and will provide significant other benefits to the City, including: a. Substantially reduce impacts to trees, both roots and canopy. b. Substantially reduce time of reconstruction and return of drive-able streets c. Significantly reduce maintenance of traffic (MOT) issues and costs. d. Develop valuable stabilizing material as a "by-product" of the process which will be placed on existing dirt streets throughout City for "dust control" and stabilization. A&0 will provide coordination, specifications, and permitting of the "dust control" and stabilization efforts. 4. Additional Elevation Data: A&O has already coordinated with Ghiotto & Associates surveyors to begin obtaining necessary additional topographic information in critical areas of the existing Core City, Howell Park, Se1va Lagoon, and surrounding areas, in specific areas shown by the Preliminary Design Report Phase to require very specific design effort. This additional information will not duplicate any information already available, and was not gathered in the topographical information from prior engineering and analysis efforts. Funds remaining in the City P.O. with Ghiotto from the Preliminary Design Report Phase are being utilized initially, and additional funding if required will be negotiated between City and Ghiotto. The City will handle these services duectly under a separate agreement, with all necessary effort carefully coordinated by A&O with the surveyor to obtain maximum efficiency. All elevations will be "benched" to the same datum as existing records. 5. Additional Geotechnical Data: A&O will coordinate with Ellis & Associates geotechnical services for more detailed assessment of the Selva lagoon, the ditch through Howell Park, structural borings at all major drainage structure design areas, and other specific areas which have been shown by the Preliminary Design ReportPhase to require very specific data. This additional information will not duplicate any information already available, and was not gathered in the geotechnical information from -prior engineering and analysis efforts. Atlantic Beach, Final Design & Permitting, Scope of Services Page 3 of 7 AGENDA ITEM #8G SEPTEMBER 25, 2000 ' Preliminary information regarding these fees will be provided under separate cover, and the City will handle these services directly under a separate agreement. All necessary effort will . be carefully coordinated by A&O with the geotechnical firm under this scope to obtain maximum efficiency of this effort. 6. -Environmental, Arborist, and Legal .Efforts: Environmental, arborist, and Legal consultation will be needed throughout the Final Design process in varying degrees for pollutant load mitigation, wetland and aquatic species impact(s), wetland delineation, environmental mitigation consultation, tree impact avoidance, planting design if/as necessary, and possible legal issues related to the permitting process. Pollutant load mitigation consultation will be provided by Cheryl Johnson and staff of Engineering Methods & Applications. Wetland and aquatic species impact(s), wetland delineation, and environmental mitigation consultation will be provided by Nancy Zyski and staff of Environmental Resource Solutions. Scope of these services will be developed by A&O in coordination with Atlantic Beach and these subconsultants, and final fee proposals will be provided under .separate cover to the City for handling of these services directly under separate agreement. An ongoing continuing hourly contract between the City and Early Piety, Certified Arborist, is proposed to be continued throughout the Final Design process. All necessary effort will be carefully coordinated by A&O with the environmental firm(s) and Early Piety under this scope to obtain maximum efficiency of this effort. Phase One (and possible Phase Two) Environmental Audits, and any possible legal consultationregarding purchase of property or determination of "Waters of the State" issues relating to the environmental status of the Selva Lagoon will also be handled independently by the City on an "as-needed" basis. 7. Initial Construction Phase Design Using Existing Permit: A&O will complete an independent design of Sherry Drive and let this portion of the project to bid under the existing SJRWMD permit. Design will be accomplished as 75% and Final Design Drawings only, submitted for review by City Public Works for this First Phase of Construction. Design will be for reconstruction of Sherry Drive from Atlantic Blvd to Plaza, including widening to 24' pavement, depressing to accept drainage from numbered streets, adding curb & gutter, providing normal-crown cross-section, and providing piped drainage .systems within Sherry Drive from Ahern to 8~' St sized and set at elevationto accommodate adjacent proposed Core City improvements. This design process will require the following special considerations: a. Provide specialty design of outlet drainage piping to totally avoid all wetland impacts, thereby avoiding having to acquire the previous rescinded ACOE permit or develop a separate ACOE permit to allow impacts. b. Provide separate analysis of the pre/post peak flows at City Hall, Selva Marina golf course, and downstream of Fleet Landing for this sub-phase of the design. Develop specialty design of outlet drainage piping to limit discharge flows on an interim basis to avoid any increase in flows or rise in flood elevations in the above areas. Atlantic Beach, Final Design & Permitting, Scope of Services Page 4 of 7 AGENDA ITEM #8G SEPTEMBER 25, 2000 c. Design temporary transition segments to all Core City streets. d. Use the proposed pipe size,~pipe elevation, and roadway elevation data from the Preliminary Design Report Phase for the required final design criteria surrounding -- _ _ _ - _ _ _ - Sherry Drive. e. Provide information copies to SJRWMD of the new, limited design of Sherry Drive. It is agreed all coordination with SRC members and/or the City Commission members regarding the 75%, and Final Design submittals will be accomplished by Public Works, and any comments shall be included in their review comments. 8. Final Construction Design: Based on the Preliminary Design Report and meeting the limits and pazameters developed within the Final Design of Sherry Drive delineated above, A&0 will commence effort on the Final Construction Design for the remainder of the entire.proj ect in a single phase or design segment. Breakdown of this design. into separate portions to allow the most efficient letting of contracts for construction will be handled by City with no work effort by A&O. a. Final Phase of Construction Design: A&O will develop 75%. and Final Design Drawings only, submitted for review by City- Public Works for all remaining- construction. Informal coordination with Public Works will be provided prior to 75% submittal for specific issues which are not clearly defined by the Study, and specifics of these will be based on our continuing good working relationship with Public Works. This will include design of i. Regrading and stabilization of existing Semi-Hole Rd ditch between 16d' and Saturiba Drive. ii. Four (4) baffle boxes downstream of Sherry Drive, 11 `~ St, and Pine St, each capable of accepting future proposed flows as determined by the Preliminary Design Report. iii. Improved drainage capacity, and associated maintenance access capability, through Howell Park, while avoiding tree impacts. iv. A box culvert under 11~' St at the Selva lagoon. v. Structural revetment of the lagoon banks around the Selva Marina CC main bridge (Bridge #6) will be designed, with associated re-grading of the area. vi. CleaningJdredging of the Selva lagoon from Plaza to Mayport Rd. vii. A weir control structure, ~5 cfs pump with 12" force main to headwaters of Sherman Creek, and a X10 cfs pump over the weir. .viii. Relocation (out of the flow line of the creek) of the existing large-diameter force main at the box culvert under A-1-A at Puckett Creek. ix. 1~`, 2na, 3rd, 4~, Sd', 6~, 7`~, 8~`, 9`~, 10~`, 11`x, and 12~' Streets, all between East Coast Drive and Sherry Drive, all to inverted crown with no curb & gutter with 20' pavement width throughout. x. Ahern and Plaza, each within the existing (to-remain) curb & gutters to Atlantic Beach, Final Design & Permitting, Scope of Services Page 5 of 7 AGENDA ITEM #8G SEPTEMBER 25, 2000 ' normal-crown (existing-condition) cross-section, Ahern from the Sea Turtle to Sherry Drive, Plaza from East Coast to SherryDrive. xi. In-ground drainage systems will. be designed on: (1) Ahern, from Sea Turtle to Sherry Dr, incl Sea Turtle parking lot. -- _ __ - = _ _ (2} 7~' St (and Beach Ave), from 8`~ St beach outfall to Sherry Drive. - -_ (3) 9`~ St, from 400'.east of Seminole Rd to Seminole Rd. (4) 10~` St, from l 0ei St beach outfall to Sherry Dr. (5) 11~ St, from 12~' St to the Selva lagoon. (6) Seminole Rd, from Plaza to l lei St. xu. Four (4) m;n;mum and ten (10) maximum additional baffle boxes within the Core City, including two (2) "CDS" (proprietary) units and a minimum of two (2) smaller baffle boxes to allow EPA comparison of effluents. xiii. Improved drainage capacity, and associated maintenance capability, through Howell Park. xiv. Regrading and stabilization of the existing Seminole Rd ditch between 16`'' and Saturiba Drive. xv. Gravity sanitary sewage collection system on: (1) 12~' St, from East Coast to 11'~ St. (2) 1 l~' St, from East Coast to Sherry Dr. xvi. Potable water distribution system on: (1) Ahern, from Ocean Blvd to Sherry Dr (~ 550 lf). t (2) 2nd St, 4~' St, 5~' St, 6`~ St, 7~' St, Plaza, and 10~' St, all from East Coast to Sherry Dr (t3,8001f total). Street-by-street, independent design of each Core City street will be performed based on careful, in-depth ssurvev of all specific existing conditions. Close coordination with arborist Early Piety regarding tree canopy and.tree root zone protection issues will be performed, including coordination with a contractor regarding specific machinery capabilities and limitations for canopy and root restrictions. Conflicts with sanitary sewer services will be carefully analyzed to every extent possible, and all water and storm piping designs will be closclycoordinated with existing facilities. b. Final Phase of Construction Design Reporting_ It is agreed all coordination with SRC members and/or the City Commission members regarding the 75% and Final Design submittals will be accomplished by Public Works, and any comments shall be included in their review comments.. A&(~ will hold one (1) meeting with the City Commission following the Final Design submittal to provide a brief verbal report describing the final project design and to update the engineers cost estimate. 9. Stormwater SJRWMD Permit Modification and ACOE Renewal Submittals: Following review and City approval of the 75% Design submittal for the Final Phase of Construction Design, A&O will develop an overall "Permit Modification Submittal Design" to SJRWMD and a "Permit Modification and Renewal" to ACOE for the entire prof ect. This effort will include: Atlantic Beach, Finat Design 8c Permitting, Scope of Services Page 6 of 7 AGENDAITEM #8G SEPTEMBER 25, 2000 a. The entire project roadway and drainage design drawings, showing all detail necessary for the SJRWMD and ACOE to adequately review and/or modify the existing SJRWIVID and pending ALOE permits.... . -_ - ----- ~ _-= -_-- b. - - A complete set of-revised application -forms -attendant required supporting documentation; and 81/zxl l drawings,' including all wetland impact andmitigation issues and pollutant load mitigation issues, for these submittals. c. Submit permit packages for review by SJRWMD and ACOE, coordinate with those agencies, and obtain approvals for the proposed design. Permit packages will include "dust control" for existing dirt streets to be stabilized as discussed above. The Final Design submittal to the City will incorporate all agency permit requirements. 10. Water & Sewer Design Permittiung_, Following review and City approval of the 75% Design submittal for the Final Phase of Construction Design, A&O will make a design permit submittal to Duval County Health Dept/FDEP for the water main improvements design and to the Jacksonville Regulatory and Environmental Services Division for the sanitary sewer improvements design for those agencies review and subsequent approval of the proposed designs. A&O will coordinate with those agencies and obtain approvals for each for the proposed designs. The Final Design submittal to the City will incorporate all - agency permit requirements. F:IPROJECTS~At!-Bch-StmwtlFee-ProposallFinal-Design\Drft-Scope-3.a~7cwpd Atlantic Beach, Final Design & Permitting, Scope of Services Page 7 of 7 AGENDA ITEM.#SG SEPTEMBER 25, 2000 CONTRACT FEE SUNIlViARY CITY OF ATLANTIC BEACH, FLORIDA T.~:. I~iP.`It'A~, .. 1. Project _ -.. _._. _ . _ .. _ __._._._. _ ..._. _. .._. __ -._ _._ ._ 2. Proposal Number --__-.. Atlantic Beach Stormwater - Parf B Finat Deli Develo meat 3. Name of Consultant 4. Prepared: September 18, 2000 Aikenhead c~ Odom, lnc. :::fit..:. .~ik~ ...~ 5. Direct Labor Hourly Estimated Estimated Rate Hours Cost TOTAL Principal In Charge $ 60.10 175 $ 10,517.50 Chief Engineer $ 60.10 1297 $ 77,949.70 Senior Engineer $ 31.30 2009 $ 62,881.70 Engineer $ 19.76 1815 $ 35,864.40 CADD Desi er $ 15.19 1689 $ 25,655.91 TOTAL DIRECT LABOR $ 30.48 6985 $ 212,869.21 6.Overhead (Combined Fringe Benefit & Administrative) Overhead Rate 162 % x Total Direct Labor $ 344,848.00 7. SUBTOTAL: Labor + Overhead (Items 5 & $ 557,717.21 8. PROFTT: Labor Related Costs (Item 7) x 13% $ 72,503.00 's ~I'~32'~'sIII 13ER.1 9. Miscellaneous Direct Costs Transportation $ 686.40 Original Reproducibles $ 913.50 Reproduction $ 7 944.00 Shipping $ 130.00 Other' $ 0.00 MISCELLANEOUS DIRECT COSTS SUB-TOTAL $ 9,673.90 10. SUBCONTRACTS (Lump Sum) Survey Environmental Geo-Tech SUB-CONTRACT SUB-TOTAL $0.00 :::.:::::::::::::::::.:::::..:............... Ni[lf'....CIIk'r.,~3~C111"i€'.{~~ems....:.6 .~ .:~:.~b~i.:~. ...:.:.:.:.:.:.:.:.:.:::..::: :$.::~39~~&S1d~l: 11. SUBCONSULTANTS (Reimbursable Costs -Limiting Amount) TOTAL $639,894.11 SUB-TOTAL REIMBURSABLES $ :;: i:i:;::;:;: '~€~A~~`•~)~~'•~ PZ~ MANHOUR SUMMARY CONSULTANT: AIKENHEAD & ODOM, INC. RFP NO.: Prepared: September 18.2000 NAME OF PROJECT: AUanfic Beach Stontmater FROM: TO: Principalln Chief ACTIVITY Char a En sneer 1.0 PUBLIC HEARING 24 32 2.0 ADDITIONAL ELEVATION DATA COLLECTION Coordination With Surveyor 2 32 3.0 ADDITIONAL GEOTECHNICAL DATA COLLECTION Coordination With Geotech 2 24 4.0 ENVIRONMENTAL and LEGAL EFFORTS Coordination with Arborist 4 24 Coordination on Wetland and Aquatic Species impacts 4 40 Coordination on Environmental Pollutant Loading Issues 4 16 5.0 FINAL PLANS PREPARATION Drainage Plans Preparation 25 226 Pump Station /Force Main Plans Preparation 7 64 • Roadway Plans Preparation 66 593 6.0 PERMITTING -Preparation 1 Submittal /Coordination Petmit Packagc A - SJRWMD + COE 13 114 Permit Package B - DEP + PUBLIC HEALTH 2 ~ 20 , 7.0 preparation of Construction Contract Packages - Contrad 1-Sheny Drive 8 48 Contract 2 -Down Stream Improvanents * & City Streets And Beach puff 8 48 8.0 Coordination of Dust Control Projects MappinS 2 8 Pemut coordination 4 8 * (Lagoon, box culvert, pumping system and construction of 4 b affles boxes} ** IncIudin Water & Sewer Elements TOTAL 175 1297 Senior CADD Total n tneer En sneer Desi ner Manhours 48 0 48 205 720 24 0 178 48 0 0 74' 36 20 36 120' 80 8 52 184; ~, 40 8 8 76' 315 377 315 12581 89 107 89 356; 823 988 823 3293 158 190 158 633 28 33 ' 28 111 96 40 192; ~ 40 180 t) • 24 36 40 110 20 24 12 6g 1815 1689 7038 i~ b G1 ~z d ~a ~ rr ;D H N ~ ~ ~ o 0 0 ROADWAY PLANS PREPARATION CONSULTANT: AIKENHEAD & ODOM, INC. RFP NO.: Prepared: September 18, 2000 NAME OF PROJECT: Atlantic Beach Stormwater FROM: Tl~r ITEM SCALE UNIT NO.OF UNITS NO.OF SHEETS M-H PER UNIT TOTAL MANHOURS ' COMMENTS Typical Section and Notes Sheet 2 2 16.00 32.00 Summary of Quantities Sheet 2 2 24.00 48.00 Plan & Profile 1 "=40' Sheet 45 45 2x.00 1080.00 Sherry & Core City. Intersection Details Sheet 1 1 24.00• 24.00 Atlantic cpL Shetry Intersection Profiles Sheet 7 7 24.00 168.00 Core City- Ulitmate design Intersection Profiles Sheet 7 7 8.00 56.00 . Core City- Shetry Dr Temp Connection Ditch /Canal Regrading 1 "=40' Sheet 5 5 16.00 80.00 SeminoleR/S Ditch/ETM BASE Baffle Boxes/CDS Details Sheet 6 6 24.00 144.00 Baffle Boxes, CDS Units Etc Water Details Sheet 3 3 12.00 36.00 Core City-City to provide detail base Sanitary Sewer Details Sheet 3 3 .12.00 36.00 Core. City-City to provide detail base Stonnwater Pollution Prevention Sheet 1 1 24.0(1 24.00 Erosion & Sediment Control Sheet 25 25 6.00 150.00 Double Plan sheets Maintenance of Traffic Sheet 6 6 20.00 120.00 Sherry (3),Core City (2) 11th St. (1) Cross Sections Section 178 15 2.25 400.50 Quantity Calculations L.S. 1 0 132.00 132.00 Cost Estimates Each 6 0 32.00 192.00 Pavement Design L.S. 2 0 8.00 16.00 Preconstruction Public Meeting Each 2 0 48.00 96.00 Incl. Minimal PreMeeting Meetings -Site & City Each 12 0 G.UO 72.00 Water Only Sheets Each 1.4 14 20.00 280.00 Double Plan sheets Water & SewerSheets Each 5 5 18.00 90.00 11th & 12th Streets ROADWAY PLANS TOTALS 335 149 3292.50 b G9 H CrJ ~ d Oy Y ~~ N N p 0~0 O ~] O DRAINAGE PLANS PREPARATION ~:. CONSULTANT: AIKENHEAD & ODOM, INC. NAME OF PROJECT: Atlantic Beach Stoimwater RFP NO.: FROM: Pre ared: September 18, 2000 TO: ITEM SCALE UNIT NO.OF NO.OF M-H PER TOTAL UNITS SHEETS UNIT MANHOURS COMMENTS Supplementary Drain. Map Sheet 2 2 24.00 48.00 Sherry & Core City Drainage Design L.S. 1. 200.00 200.00 Design -Major X-Drains Each 1 1 32.00 32.00 1 I th St.. Drainage Struct. -Urban Sheet SU I O 8.00 400.00 i Summary of Drainage Structures Sheet 5 5 20.00 100.00 Downstream (I) Sherry (2) Core City (2) Misc. Drainage Details Sheet 3 3 16.00 48.00 Sherman Canal Plan & Profile Sheet 13 13 28.00 364.00 Downstream Canal CrossSections Sheet 165 0 .0.00 0.00 Downstream-deletesheets-use specs Erosion Control Sheet 7 7 6.00 42.00 Double Plan Sheets, Downstream ;, . ;. ;, ~'~ ~: i i! i DRAINAGE TOTALS 248 ~ 42 ~ ~ 1258.00 ro ~ yr trJ ~;d. ~ ~' t=f a ~~ w ~ N ~ C "n PUMP STATION & FORCE MAIN PLANS CONSULTANT: AIKENHEAD & ODOM, INC. RFP NO.: 18, 2000 NAME OF PROJECT: Atlantic Beach.Stormwater FROM: Tn• ITEM SCALE UNIT NO.OF NO.OF M-H PER TOTAL COMMENT UNITS SHEETS UNIT MANHOURS Site Plan Section & Details Stnd. Details (elect) Misc. site details & Tidal Control Forcemain Plan & Prof le Sheet Sheen Sheet Sheet. Sheet 1 4 2 2 2 1 4 2 2 2 26.00 26.OU 24.UU 28.UU 1G.UO 26.00 104.00 48.00 56.00 32.00 ' ' ;' r: i, ': ~~ '; i. i, ~' i j. ,. !i ;, PUMP STATION & FORCE MAIN PLANS 12 11 356.00 b ~ ~` d ~a ~' N VI O ~ O O PERMITTING .AND ENVIRONMENTAL I CONSULTANT: AIKENHEAD & ODOM, INC. RFP NO.: Prepared: September 18, 2000 ITEM SCALE UNIT NO.OF -- UNITS SJRWMD - ERP Permit Project Fla. Dept. of Natural Resources Project Corps of Engineers Project Fla. Dept. of Transportation Project City of Jacksonville Clearing Per mit ~ .Project City of Atlantic Beach Tree Permi t ...Project NPDES I ~ Project Permuit Package B - DEP + PUBLIC HEALTIi Fla. Dept. of Environ. Protection I Project Duval County Dept of Public Health Project .. PERMITTING AND ENVIRONMENTAL TOTALS NAME OF PROJECT: Atlantic Beach Stormwater FROM: TO: NO.OF M-H PER TOTAL SHEETS UNIT MANHOURS COMMENTS 1 0 3G0.00 360.00 0 0 0.00 0.00 Assuming No Impacts 1 0 120.00 120.00 1 0 36.00 36.00 . 1 0 80.00 80.00 1 0 0.00 0.00. 1 4 36.00 36.00 SUB TOTAL 632.00 f f 1 0 30.00 30.00 i ~ 1 o so.oo 80.00 SUBT I OTAL 110.00 ;, l 742.00 b' ~ H t=i r~ z oho a ~~~ N Ch O O CONSULTANT: AIKENHEAD & ODOM, INC. RFP NO.: Prepared:_September 18, 2000 MISCELLANEOUS DIRECT COST ITEM DESCRIPTION DmRing Medium: (Mylar Original Reproducibles) 40 t63 Reproduction (Blue Line & Sepias) Initial Construction Interim Submittal 75% Review Final Review Bidding Final Construction Interim Submittal 75% Review Final Review Bidding Cost: Travel From: [Consultant Office Location] To Project: Transport. To City fia11: Transport, To Other Agency: Transport. Other (Specify) Shipping # of Sets : 2 Plots # of Sets : 5 Plots # of Sets ; 5 Plots # of Sets : 0 Plots # of Sets : 2 Plots # of Sets : 5 Plots # of Sets : 5 Plots # of Sets ; 0 Plots Total Sheets Plots 11"x17" 8 1/2" x I I" # Trips 32 x 40 # Trips 16 x 40 # Trips 8 x 2U TOTAL COST NAME OF PROJECT: Atlantic Beach Stormwater FROM: TO: ITEM COMMENTS i 203 Sheets $4.50 Per Sheet = $913.50 l t"x17" 8 1/2" x 11" ~ 80 200 Sheets 200 500 Sheets ~ 200 500 Sheets 0 15,000 Sheets P14ts 326 200 Sheets 815 500 Sheets 815 500 Sheets 0 15,000 Sheets 2,436 32,400 32,400 2,436 Sheets ® $ 1.00 32,400 Sheets ® $ p,12 a 32 400 Sheets Oa $ 0 05 miles x 50.33 permile+ miles x $0.33 permile• miles x $U.33 permile* $2,436.00 $3,888.00 $686.40 $130.00 x,673.90 i i ro~ ~C, ~ ~ ~ H N ~ N ~ O ~ O 0 ID 1 2 E1 Task Name ~ Design of Sherry Ortve • 30 /° Des n Submiltal ... _.._ ° ~ Duration 120 da ys ` _. _...._ _ ._: 45 days Start 10/2/00 ; _... --_---.-^_._ 10/2/00 i Finish 3!18/01 _--; 1211/00 2001 2002 Se pct Nov Dec Jan Feb Mar Ma Jun Jul Au Se Oct Nov Dec Jan Fab Mar r Ma Jun Jut A . Se Oct ~~~ , 3 - 75% Design Submittal - 45 da. ~ Ys i -- -~~----Y--~- 12/4/00 I •-`~"~ 2/2/01 ' : -- - - ' Final Design Submittal 30 days I ~ 2/5!01 i 3/18/01 : ...•.•.- 5 ........ __.__._ .. i Construction of Sherry Drive ...... _..._. 150 da s ; ---' _ ------ -~ r~- ------- .• :•.:.- .; ;:;::_ . y 4/2/01 10/28/01 ~ Design of Coro City b Downstroar { 173 d I _. .. . ~ ~ •• ••~ • ~ " ~ - ays I 1/4/01 I 913101 7 d .. 30y° Design Submittal ~ "_ •-° _ .. _. _ .._ _ _ i--_.._------... ~60 days ; ~ __ _ , 1/4/01 328/01 75% Design Submittal 1 60 days 329/01 ~ 620/01 '• "' `°= •"' ' 9 Final Design Submittal ~ - _"` ' -_.._.._._~ 30 days ; -..__._•_-__y._- 821/01 __-_-- 8/ ~•~ ~ . .....:.. ' _ .__.. ' Permit Moditicatton .____.__.._._ 90 days ! I 511!01 ' 1/01 9/3101 ~ ~ ~~~ ~~~ ~~ 11 ~ ..-----_.. _. I Construction of Coro City & Down ; 2 "- : ~ T0 da Ys i 920/01 ~ 1012/02 : I: I I' i, • I' i I r ~; I it i f i; i, ~~; I' f ~; li n (. ~~ • •~ ~ a G b ca y t=7 ~ 9 , h1 Task "' .~ _~, ,.,:~ ~J --] Project: AtlantlcFinai '~''0"--•- ~•:•:•• = :•=•: Milestone e Rolled Up SpNt C21 ale: 9/13/u0 Split ~ , , , , , , , , , , External Tasks _ N ~7 ...... ............... Summary Rolled Up Milestone O N Progress ~~ Project Summery ~ ~ Rolled Up Task Roiled Up Progress ~ ~ n 0 Page 1 /! TRACKB4G SPRFADS}ll>:'C. ACTUAL COST ASSOCIATED WRH EACH I°ROIECT PREPARID BY: ARNOLD F. LILI.Y7R, CONS7RUCDON COORDINATOR >~ PAGE L• Dote Projat Tnle Description Fnginar Firm Design Con Faginar Conn. Fitimate Conu Con ' Chmge Ordrn i TotelCmri Cott °hDaigNCmrt Contsagor CAS ROS 7oW Cost %.CAS/Coori. Months Cori Pa Month 9697 Lift SU6on No:2Ara Relining lift Sutim No: 2 Area Sew«-mein Repl. Insbufotm Mining ofsewer•mains Replecemmt of ezisring sew«inains and madways Weitz B<Moye, Ina l1'aitz & Moye, inc 3109,833.00 i ~ 5138,566.00 51,034,260.59 5576.00 5152,873.63 51,726,276.22 8.28°h Inircuform Southean, In John Woody, lnn 52837.93 N/A 51,464,447.15 2.14°. 8 53,542.24 FAR 9495 (mprovemmuro WriMSewer Mains in the Vmiciry ofLifl Sutton No: 7 Area Reple«mmt of existing wet«/seweNroadxxys Gee AJenson, lnc 550,320.00 51,092,690.00 5515,126.00 5106,534.91 51,711,400.93 5.2Ah lrnsen Civil Conn.lne 569,100.00 NIA 51,873,820.93 4.03N. 12 55,758.37 11tR 9899 Improvemmu of the POUble WU«•tnains Replacemm ofexiating wata•tnains: Phase4 Ga d:Jmson, inc 244,754.00 5550,000.00 5394,748.75 (574,007.53] 5)20,741.22 13.95°/. Buroup&Sime TeleCo 124,964.82 N/A 3390,460.04 7.78°R 8 53,120.60 9394 Stormwna Improvemmu: Phase 1 Pump SutioMtmtion Pmdhekted infruwmue S roadway replaamrnt 8. H. k R, lnc. f 150,000.00 52,600,000.00 ~ 12,600,000.00 ~ 5.7754 ]rnsrn Civil Const Ina. N/A 52,730,000.00 50.00 0.00% ERR FAR 9495 Stotmwst« hnprovemmu: Phnx 2 1°ump SufioNRmtioa Pmd/Mried infiaswcturc R roadway «placemmt 8. H A R., Ina. 5150,000.00 51,094,000.00 (510,000.00) I 51,064,000.00 ~ l4.IO/. lrnsm Civil Conat lnc. 154,000.00 N/A 51,268,000.00 50.00 S.OBX 6 59,000.00 IRR Stormwafa Improvanmu: l lOr Ave N. Pump Sution/Itrn6oo Pond/rclucd iafiuwcNrc & rosdway replacement B. H. 8 R, Inc. 523,900.00 5224,000.00 523,000.00 5247,OOD.00 ~ 9.66°/. R & B Contnaing, Ina N/A 5270,900.00 SO,Op 0.00°/. 1748 ERR 9496 Swmtweta hnprovemmu:Bach Blvd. Pump SUdon7ltrntion Pond/rckted inl'nstrocmrc &toedw.y rcplacaomt W Wqj, °~ SE ~B:'figIt•'hte" RS & H 5400,000.00 27,000,000.00 57,000,000.00 s9.oo ~(' S.71X CaxweB Conn. Ina. 5363,000.00 N/A 57,763,000.00 so.oo S.19Y. ~ t7tR EAR 9699 South Pablo South StormvM« Stamwn«Dninage lmprovemrnu Alhf 518,191.00 5250,000.00 SO.Ib 7.28% 516,765.00 234,956.OD ERA EAR 9899 18th Strcet N. Stotmwata lmprov«nmu Stotmwn«Drcinage lmprovemmu ATM 57,961.00 5150,000.00 50.00 5.31Y. 36,970.00 5]4,931.00 EAR ERR 9899 Madrid St Drainage lmprovemmu St«mwat«Oninage lmprovemmu wlpump statim ATM 5104,137.00 52.100,000.00 52,006,195.75 52,006,195.75 5.19°/. ARS ofp7., Inc. 5]51,653.00 52,261,985.75 ).SNP. ERR 15th Si S. Dnioage Improvtmrnu StormwataDainage Improvmsmu ATM 510,981.00 50.00 ERR 510,981.00 FAR ERA Wingste PuWGolfOrivinB Rmge Stormwri« Stotmwata Drainage lmprovemrnu w/pump snfion AM 323,151.00 3310,000.Ip 50.00 ~ 8.11Ya 323,630.OD 54$781.00 ERR ERR 7V &Clemingof4th St to Heach Blvd ClamingDMnag<SYStem Piping ATM 56,041.00 SO.W k7lR 56,091.00 ERR FRR HugumaPask Stosmwria hnprovemmu DtedginB OUt Lagoon ATM 516,961.00 5303,000.00 50.00 ~ S.56Ys 525,925.OD 54;886.00 FAR ERR Ho11Y Lk. tit Pahn Ira 1ma Srormwsla Stolmwnt« Drainage Improvemmu ATM 517,211.00 5190,000.00 SO.OD 9.06'/• 214,110.00 131,331.00 FRR ERA 37th Ave S. Stotmwat«fmprovemrnu Srotmwat«Oninage Enproverornts ATM 510,711.00 565,000.07 50.00 16.48% 510,711.00 FRR ERA 9899 9900 9900 Wat« Plant No: t, Phase B hnprovemrnk New Wn« Supply Welk Bid Package No: l Ncw Trmsmisilon Lines & Poubk Maine Bid Paak.ge No: 2 Wat«14mt Rehabgiution Bid Package NO:l S R G, Inc. S A O, Inc. Sd: O.Ina 5272,070.00 5709,60D.00 5910,800.00 51,465,800.00 51,077,508.00 5981,246.25 51,254,875.00 SI,017,508.00 5981,246.]3 51,254,875.00 8.03Y. Sun AabiG Inc. Mrmda Contracting N PBM Consweton, Inc. 551,200.00 122,800.00 53$700.00 21,088,708.00 31,004,046.55 51,293,573.00 4.93°/. 2.3254 3.OSY. 5 6 8 510,240.00 23,800.00 50,837.50 Total Combined Cort of the rntirc projecC 53,386,32975 3.33°/. 00'01 7th k 9ih Ave N. WateHStwa Improv«nrnu New wn«/sower improtemmu S R G, Inc. f 18,492.25 5160,o00.1q OlYOI W'aur Maio hnprwemmut«Grove Sveet Asw New Wst«Mdnf, ServicaRFirt Hydrmu G«RJmsm,Ine. 325,000.00 5221,580.00 00'01 WataMain hnprovemmufa 12th,13th&14th St N. New Wata Mains, ServicesRFue Hydmnu WaezR Maye, Inc 115,825.76 5224,000.00 5202,941.25 2202,9/1.25 7.80°/. Mumda ConttactingN 510,130.00 5226,917.01 5.00°h 52,53).50 ~E COMPLETED 5701?M WiiTE(Z Pk~C21~C~5 FROM 7'QCKSoI~UI~LE S~ACff C~EES t1~1GLUDE P~~M~TT11,1G~ ~~ INCOMPLETE STORM WATER PRC~~cTS Constdat.12309/18/00 b H t*7 ~ ~ ~a ~~ ~ "~ tJ ~ v5 on 0