Loading...
2434 Seminole Rd RES18-0232 Blower Door ! Permit #: Res / - o3 ' 'CickIONiM Blower Door Test Form Job Information Builder: Game 1 ContS4-vc.tc4o✓J Co Lc Community: Lot#: Address: c)(1,34 &m'n0le KOI Unit#: City, State,Zip: 114 IQ.l1L)G UC4 C ] , Fri)v1 0(0, AirInfiltration Test Results CFM(50) = < < S Volume = cYI4 ACH(50) = CFM(50)X 60/Volume = 1 . XPass ❑ Fail Passing results must be 7 ACH(50)or less Certification of Test Results R402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2, 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure or 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7),F.S. or individuals licensed as set forth in Section 489.105(3)(f), (g), or(h) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Authorized Third Party I hereby certify the above results and that I hold the below certification: Class A or B A/C contractor or Mechanical contractor License No. RESNET approved HERS Rater or Residential Field Inspector Certification No. XBPI approved Building Analyst or Energy Auditor Certification No._SC)5 9 53 Professional Engineer License No. Mechanical ventilation has been added: Yes % No Signat O �d � Printed Name: !1 n Va l _ � i k_eS Date: 5- cQO a0 Revised 5/5/2017