Exh 4BAgenda #4B October 23, 2000 CTTY OF ATLANTIC BEACH CTTY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Effluent Outfall Repairs, Additive Alternate No. 1, (Phase II), Bid No. 9900-15 SUBMITTED BY: Donna Kaluzniak, Utility Direct DATE: October 17, 2000 BACKGROUND: The pier which supports the Beaches' combined effluent outfall line needs scheduled repairs due to the destructive nature of the saltwater environment. Repair plans were developed by Nadeem Zebouni, P.E., who recommended the work be completed in two phases.. The base bid for the project (Phase I) consisted of replacing all the lazge "U" shaped hazdwaze on the pier. The second phase of the repairs consisted of replacing all of the deteriorated X-bracing. We bid Phase II of the repairs as part of Bid No. 9900-15, "Additive Alternate 1" in May, 2000. Invitations were sent to four bidders, and one bid was received on May 31, 2000. We received several calls. from bidders who were initially interested, but determined the size of the project was too small. The sole: bidder was T.W. Blount, Jr. and Son Contracting Co. as follows: Base Bid (Phase I): $43,146.40 Additive Altemate No. 1 (Phase 1T): $44,220.00 At the time of the bid, we only had funds available to complete the Base Bid (Phase I), which was awarded to T.W. Blount, Jr. and Son Contracting Co. by the City Commission on June 12, 2000. Phase I of the repair project is nearly complete. The contractor has agreed to honor his original bid price for Additive Alternate No. 1 (Phase II) of the repairs. This contractor has performed all of the efIluent outfall pier repairs to date, and City staff has been very pleased with their work. BUDGET: Funds for this project are budgeted in the Sewer Utility Fund under account number 410- 4401-535-3400 in the amount of $45,000. Actual cost for the City of Atlantic Beach will be $14,725.26, as costs for this project aze shared by the three Beaches communities. RECOMMENDATION: Awazd the contract for Additive Alternate No. 1, Bid No. 9900-15 to T.W. Blount, Jr. and Son Contracting Co. in the amount of $44,220, and authorize the City Manager to sign the contract. ATTACHMENTS: 1. Bid Tabulation Sheet 2. Letter from Richazd W. Blount agreeing to hold the bid price from May 31, 2000 *3. Bid specifications and plans Mile with City Clerk REVIEWED BY CITY MANAGER: * Bid specifications and plans aze lazge, lengthy d ents and it is not practical to make copies. These documents are available for review in the City Cl k's office. OCT-17-2000 TUE 08.36 AM CITY OF ATL 8CH PURCHASI Ffl8 H0. 9042475819 Agenda #4B October 23, 2000 `~-~ EFFLUENT OUTFACE PIER REPAIRS BID N0.9900-15 I)A'I'ly OF BYI) OPENING May 31, 2000 Page 1 of 1 $iD TABTTLATION REQUll2LMENTS ' Mead s n r'n T. W. 131ount, Jr & Son Sca Tcc ari G. Pin & sso 'ates Contracting lntcr tionat c Co. In Doctuncuts IZcquircmcnts Checklist, Signed Insurance CertificaCes, Original ~• two (2) copies Thrcc (3) references Proof of / 'CONTIZA.CTOR'S V License(s) Bid submitted 1N TR]PLICATE (three (3) sets). Iiid Bond (5% ifbid) Evidence of Workers' / Comp Ins Experience V Mod Rating Acknowledge Addendum / #1 "~Q~ ~~G~ .. : .. :!°). ~7..J~ ~~ .. I~o(a',~iv~ ~4,~,1 Terra / - ~7~~7 ~~ Agenda #4B October 23, 2000 // TELEPHONE (904) 642-1260 - (904) 765-8635 FAX (904) 642-1436 . 6u~kneatls « Foundation Piling T. W. BLOUNT, JR. AND SON CONTRACTING CO. :VJa;erfr<n, GENERAL CONTRACTORS s~ruauras « Untlarground - BONGED AND INSURED - uamies « Fonder Systems P.O. BOX 16509 10249 Beach Boulevard Jacksonville, Florida 32245 September 27, 2000 City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, Florida 32233 ATTN: Mr. Bob Kosoy RE: Effluent Outfall Pier Repairs Bid No. 9900-15, Additive Alternate No. 1 Deaz Mr. Kosoy, In accordance with your request at our pre-construction meeting on July 6, 2000 we are forwazding the following information. Regazding Additive Alternate No. 1 for timber bracing. I have contacted our material suppliers and they along with myself have agreed to hold our price as quoted on May 31, 2000. Please at your earliest opportunity advise of funding and Notice to Proceed so we can order materials. Thank you for allowing T.W. Blount Jr. & Son Contracting Company the opportunity to work with you and the City of Atlantic Beach. Yours Truly, T.W. Blount Jr. & Son Contracting Company ~~ a~~ Richazd W. Blount, Vice President