Loading...
1600 Selva Marina Dr 16-CNEW-954-04 new bldg on 9th hole permit inspection reportLIST OF INSPECTIONS SEQ ID SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS 8/11/2016 8/11/2016 BD FRAMING Mike Jones PARTIALLY APPROVED Notes: partial framing inspection requested CJ 424-0487 Inspected the bottoms of the steel posts, contractor wants to cover up with cement up to the rest of finish floor. 8/11/2016 8/11/2016 BD WALL SHEATHING Mike Jones APPROVED Notes: CJ 424-0487 8/18/2016 8/18/2016 BD FOOTING Dan Arlington APPROVED Notes: CJ 424-0487 8/23/2016 8/23/2016 BD ROOF SHEATHING Mike Jones APPROVED Notes: Eric 919-723-7351 8/24/2016 8/24/2016 BD WIND TIE- DOWN/CONNECT OR Mike Jones APPROVED Notes: ERIC 919-723-7351 Permit Number: 16-CNEW-954-04 Site Address: 1600 SELVA MARINA DR City, State Zip Code: ATLANTIC BEACH, FL 32233 Applied: 4/22/2016 Approved: 8/8/2016 Issued: 8/8/2016 Parent Permit: Parent Project: Applicant: <NONE> Owner: ATLANTIC BEACH PARTNERS, LLC Contractor: RPC GENERAL CONTRACTORS Description: commercial building on 9th hole - inspections Finaled: 4/3/2017 Status: FINALED Details: 08/29/16 - submitted updated product approval form for windows & doors NEW AWNING PLANS SHEET 1 FIRE MARSHALL COMMENTS 7/12/16, ASKING FOR FIRE SPRINKLER DESIGN Printed: Monday, 20 July, 2020 1 of 3 Permit Inspections City of Atlantic Beach 8/24/2016 8/24/2016 BD INSULATION Dan Arlington PARTIALLY APPROVED Notes: PETE'S TURN PARTIAL WALL INSULATION southwest corner of building, west side of elevator shaft; to allow the installation of HVAC duct vertically along the west wall prior to building the west side of shaft wall. Insulation also installed on the back wall of the kitchen area to allow the installation of durra rock before the installation of the exhaust hood on the west wall. 8/24/2016 8/24/2016 BD FRAMING Dan Arlington PARTIALLY APPROVED Notes: south west corner of building, west side of elevator shaft to allow insulation in wall. West side of kitchen where exhaust hood is to be installed. 8/24/2016 8/24/2016 BD HOUSE WRAP Mike Jones APPROVED Notes: Eric 919-723-7351 Zip board taped 8/29/2016 8/29/2016 BD WINDOW AND/OR DOOR INSTALL Mike Jones DISAPPROVED Notes: Eric 919-723-7351 1.Windows installed don't match up to the windows submitted for plan review on the FPA forms. 2. The commercial store front windows do not have manufacturers installation instructions on site for inspections. 8/30/2016 8/30/2016 BD WINDOW AND/OR DOOR INSTALL Mike Jones APPROVED Notes: Eric 919-723-7351 9/9/2016 9/9/2016 BD INSULATION Dan Arlington APPROVED Notes: Dan 509-1863 9/9/2016 9/9/2016 BD FRAMING Dan Arlington APPROVED Notes: Dan 509-1863 9/29/2016 10/4/2016 BD BUILDING FINAL Dan Arlington APPROVED WITH EXCEPT Notes: For temporary certificate of occupancy - stairwell to be completed later Temp CO. Needs second exit and elevator. Printed: Monday, 20 July, 2020 2 of 3 Permit Inspections City of Atlantic Beach 3/27/2017 3/28/2017 BD BUILDING FINAL Dan Arlington APPROVED Notes: C.O. FINAL JENNIFER 241-4416 Second exit completed. OK for C.O. 4/13/2017 4/14/2017 BD BUILDING FINAL Dan Arlington APPROVED Notes: CLOSE OUT FOR FINAL C.O. Printed: Monday, 20 July, 2020 3 of 3 Permit Inspections City of Atlantic Beach