305 Ahern ERES19-0365 Electrical permit**ALL INFORMATION
Early Power Agreement &Release HIGHLIGHTED IN
City of Atlantic Beach Building Department GRAY IS REQUIRED.
yRi
800 Seminole Rd Atlantic Beach, FL 32233
Phone: (904) 247-5826 Email: Building-Dept@coab.us coab.us PERMIT#:4
JOB ADDRESS: 303 Ahern SERVICE TYPE: Z7VERHEAD UNDERGROUND
Electric power is requested now under the conditions and terms of this fully executed Agreement and Release.
We, the undersigned General Contractor and Electrical Contractor, understand and agree:
1. "Early Power" is purely for our construction convenience, it is not required by Codes, and does not substitute
for Final Inspections or the CO (Certificate of Occupancy) that must be issued before occupancy, and as such is
at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough
inspections must have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal CO constitutes fraudulent use of the early electric
service. Such action is expressly prohibited and penalized by The City of Atlantic. Beach Ordinances. A
violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four
hour notice.
4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before:
a. Equipment, devices and fixtures are installed (or blanked off) safely.
b. Panel is complete with breakers and cover, and (labeling required at final inspection).
c. Service connection and grounding is complete.
d. The electric system has safely passed through electrical check.
e. Meter can is permanently marked with address.
f. Temporary address numbers displayed (Permanent numbers are required for CO).
S. This fully completed form is to be submitted to the Building Department by hand, mail or fax.
6. Future such Agreements will not be accepted from those who violate any one of the above items.
CONTRACTOR NAME: Mulligan Co
CONTRACTOR SIGNATURE:
ELECTRICIAN NAME: Millenn
ELECTRICIAN SIGNATURE:
, Inc
Electrical Contractors, LLC
DATE: 07/22/2020
DATE: 07/22/2020
Page i of 2
Updated 10/17/1
**ALL INFORMATION
a`'r�� Early Power Agreement & Release HIGHLIGHTED IN
City of Atlantic Beach Building Department GRAY Is REQUIRED,
800 Seminole Rd, Atlantic Beach, FL 32233
Phone: (904) 247-5826 Email: Buildin -Det coab.us PERMIT#:
JOB ADDRESS: 301 Ahern
SERVICE TYPEOVERHEAD UNDERGROUND
Electric power is requested now under the conditions and terms of this fully executed Agreement and Release.
We, the undersigned General Contractor and Electrical Contractor, understand and agree:
1. Early Power is purely for our construction convenience, it is not required by Codes, and does not substitute
for Final Inspections or the CO (Certificate of occupancy) that must be issued before occupancy, and as such is
at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough
inspections must have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal CO constitutes fraudulent use of the early electric
service. Such action is expressly prohibited and penalized by The City of Atlantic Beach Ordinances. A
violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four
hour notice.
4. Early Power release authority is the Electrician and/or the Contractor and must not occur before:
a. Equipment, devices and fixtures are installed (or blanked off) safely.
b. Panel is complete with breakers and cover, and (labeling required at final inspection).
c. Service connection and grounding is complete.
d. The electric system has safely passed through electrical check.
e. Meter can is permanently marked with address.
f. Temporary address numbers displayed (Permanent numbers are required for CO).
5. This fully completed form is to be submitted to the Building Department by hand, mail or fax.
6. Future such Agreements will not be accepted from those who violate any one of the above items.
CONTRACTOR NAME: Mulligan
CONTRACTOR SIGNATURE:
ELECTRICIAN NAME: Millennium Electrical
ELECTRICIAN SIGNATURE:
Page 1 of 2
DATE: 07122/2020
�r
DATE: 0712212020
Updated 10/17/1
Early Power AgreerYleHIGHLIGHTED IN
nt & Release **ALL INFORMATION
r s, City of Atlantic Beach Building Department GRAY IS REQUIRED.
800 Seminole Rd Atlantic Beach FL 32233
� ,.ajllsr' , 1
Phone: (904) 247-5826 Email: Building-Dept@coab.us PERMIT#: rs
JOB ADDRESS: 305 Ahern SERVICE TYPE:OVERHEAD UNDERGROUND
Electric power is requested now under the conditions and terms of this fully executed Agreement and Release.
We, the undersigned General Contractor and Electrical Contractor, understand and agree:
1. "Early Power" is purely for our construction convenience, it is not required by Codes, and does not substitute
for Final Inspections or the CO (Certificate of Occupancy) that must be issued before occupancy, and as such is
at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough
inspections must have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal CO constitutes fraudulent use of the early electric
service. Such action is expressly prohibited and penalized by The City of Atlantic Beach Ordinances. A
violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four
hour notice.
4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before:
a. Equipment, devices and fixtures are installed (or blanked off) safely.
b. Panel is complete with breakers and cover, and (labeling required at final inspection).
c. Service connection and grounding is complete.
d. The electric system has safely passed through electrical check.
e. Meter can is permanently marked with address.
f. Temporary address numbers displayed (Permanent numbers are required for CO).
5. This fully completed form is to be submitted to the Building Department by hand, mail or fax.
6. Future such Agreements will not be accepted from those who violate any one of the above items.
CONTRACTOR NAME: Mulligan
CONTRACTOR SIGNATURE:
Inc
ELECTRICIAN NAME: Millennium Electrical Contractors, L
ELECTRICIAN SIGNATURE:
DATE: 07122/2020
.2-,
DATE: 07/22/2020
Page 1 of 2
Updated 10/17/1
�11.--\-
1
�rjc, ELECTRICAL RESIDENTIAL PERMIT PERMIT NUMBER
s CITY OF ATLANTIC BEACH ERES19-0365
'-')\V __ )-1 ISSUED: 12/31/2019
800 SEMINOLE ROAD
'-~�OE `'� ATLANTIC BEACH. FL 32233 EXPIRES: 6/28/2020
MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION.
ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING
CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES .
ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY.
NOTICE: In addition to the requirements of this permit,there may be additional restrictions applicable to this property
that may be found in the public records of this county, and there may be additional permits required from other
governmental entities such as water management districts, state agencies, or federal agencies.
JOB ADDRESS: PERMIT TYPE: DESCRIPTION: VALUE OF WORK:
305 AHERN ST ELECTRICAL RESIDENTIAL NEW ELECTRIC SERVICE $2500.00
TYPE OF I REAL ESTATE ZONING: BUILDING USE SUBDIVISION:
CONSTRUCTION: NUMBER: GROUP:
169737 0010 ATLANTIC BEACH
COMPANY: ADDRESS: CITY: STATE: ZIP:
MILLENNIUM ELECTRICAL 6661 SOUTH POINT PARKWAY JACKSONVILLE FL 32216
CONTRACTORS LLC
OWNER: i ADDRESS: CITY: STATE: ZIP:
AHERN TH PROJECT LLC 830 13 A1A N #120 PONTE VEDRA FL 32082
BEACH
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT
IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF
COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST
INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
LIST OF CONDITIONS
Roll off container company must be on City approved list . Container cannot be placed on City right-of-way.
DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT
ELEC NEW SINGLE FAMILY 455-0000-322-1000 200 $70.00
ELECTRICAL BASE FEE 455-0000-322-1000 0 $55.00
STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00
STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00
TOTAL: $129.00
Issued Date: 12/31/2019 1 of 2
,t,,,, Electrical Permit Application **ALL INFORMATION
,\ HIGHLIGHTED IN
City of Atlantic Beach Building Department GRAY IS REQUIRED.
:-7800 Seminole Rd, Atlantic Beach, FL 32233 E R EEI 9 - 03
� '—' Phone: (904) 247-5826 Email: Building-Dept@coab.us PERMIT#:
JOB ADDRESS: 305 Ahern Street PROJECT VALUE $$ 2,500.00
JEA INFORMATION REQUIRED ON ALL PERMITS: 200 AMPS 240 VOLTS 1 PHASE
NEW SERVICE: 0 Overhead ['Underground crunderground up Pole
❑Residential (Main) Service:
00-100 amps ❑101-150amps E1151-200amps 0 amps #of Meters
❑Commercial (Main) Service:
00-100 amps 0101-150amps 0151-200amps 0 amps OCT Service amps
Conductor Type Size
OMulti-Family(Main) Service:
00-100 amps ❑101-150amps D151-200amps 0 amps # of Unit Meters
n TEMPORARY POLE: amps
SERVICE UPGRADE: 0 amps OCT Service amps
ri NEW FEEDER (ADDITIONS, ACCESSORY STRUCTURES, ETC.):
0100 amps 0150amps ❑200amps 0 amps ❑cT Service amps
❑ ADDITIONS, REMODELS, REPAIRS, BUILD-OUTS, ACCESSORY STRUCTURES, ETC:
Outlets/Switches: 0-30amps 31-100amps 101-200amps
Appliances: 0-30amps 31-100amps _ 101-200amps
A/C Circuits: 0-60amps 61-100amps
Heat Circuits: # circuits @ kw
Number of Lighting Outlets, Including Fixtures:
❑ OTHER ELECTRICAL PROJECTS:
DSwimming Pool Sign ❑Smoke Detectors (Qty) ['Transformers KVA ❑Motors HP
1-7 FIRE ALARM SYSTEM (Requires 3 sets of plans):
Qty volts/amps
n REPAIRS/MISCELLANEOUS:
Replace Burnt/Damaged Meter Can OSafety Inspection ❑Panel Change DOH to UG
❑7ther: updated 10/17/18
Permit becomes void if work does not commence within a six month period or work is suspended or abandoned for six months. I hereby certify that I have
read this application and know the same to be true and correct. All provisions of laws and ordinances governing this work will be complied with whether
specified or not. The permit does not give authority to violate the provisions of any other state or local law regulation construction or the performance of
construction.
Owner Name: Ahern TH Project LLC Phone Number: (904)219-5003
Electrical Company: Millennium Electrical Contractors, LLC Office Phone: (904)219-5003 Fax:
Co. Address: 3948 Third St#283 City: Jax Beach State: fl Zip: 32250
License Holder: State C? ification/Registration #: EC130001449
Notarized Signature of License Holder /
Th • f+ 'ng kiii (? t�4p, . .•i swl_+ged before me this 3 day of '��f_ . in th ate of Florida, County of ptA/ -1
o7`; James 7 Vaden
`./ MycommissioGGaz37e3 Signature of Notary Public
vw Expires 04;15/2023
✓�'v.•,,,„,:-.,./ [ Personally Known OR [ ] Produced Identification
Type of Identification: