Loading...
1551 Beach Ave ERES20-0168 Early Power LetterEarly Power Agreement & Release "ALL INFORMATION i� err" HIGHLIGHTED IN City of Atlantic Beach Building Department GRAY IS REQUIRED. 800 Seminole Rd, Atlantic Beach, FL 32233 phone: (904) 247-5526 Email: Building-Dept@coab.us PERMIT#: RES18-0335 I5V1 6e.e-r4-, AV -c JOB ADDRESS: ( 1551 Beach Avenue)(Detached Garage) SERVICE TYPVERHEAD � UNDERGROUND I qv Electric power is requested now under the conditions and terms of this fully executed Agreement and Release. We, the undersigned General Contractor and Electrical Contractor, understand and agree: 1. "Early Power" is purely for our construction convenience, it is not required by Codes, and does not substitute for Final Inspections or the CO (Certificate of Occupancy) that must be issued before occupancy, and as such is at the discretion of the Building Official. 2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough inspections must have prior Approval, including meter base connections. 3. Occupancy or use of the new construction before a formal CO constitutes fraudulent use of the early electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beach Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four hour notice. 4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before: a. Equipment, devices and fixtures are installed (or blanked off) safely. b. Panel is complete with breakers and cover, and (labeling required at final inspection). c. Service connection and grounding is complete. d. The electric system has safely passed through electrical check. e. Meter can is permanently marked with address. f. Temporary address numbers displayed (Permanent numbers are required for CO). 5. This fully completed form is to be submitted to the Building Department by hand, mail or fax. 6. Future such Agreements will not be accepted from those who violate any one of the above items. CONTRACTOR NAME: C. F. Knight, In .L' DATE: -11-61190 1 if r CONTRACTOR SIGNATURE: ELECTRICIAN NAME:__. fi t. A'lam DATE: ELECTRICIAN SIGNATURE: Page 1of2 Updated 10/17/18