Loading...
Exh 4AAGENDA # AA llECEb1BlR 11, 2000 CITY OF ATLANTIC BEACH CITY COMMISSION STAFF REPORT AGENDA ITEM: Building Permits Report October 2000 SUBMITTED BY: Don C. Ford, Building Official ~`'}~ DATE: December 4, 2000. The following is a comparison report of Building Permits for New Single Family, Duplexes, Townhouses, Remodeling/Additions and New Commercial for years to date for November, 2000. Year to Date November 1999 TYPE PERMIT NO. PERMITS CONSTRUCTION VALUATION Single Family 38 $ 4,846,839 Duplex Residences 44 2,612,134 Remodeling/Additions 160 3,896,279 Commercial 15 2,674,227 Total 257 $ 14,029,479 Inspections: Total 2252 Year to Date November 2000 New Single Family Duplex Residences Remodeling/Additions New Commercial Total Inspections: Total 2666 37 $ 4,123,873 10 937,500 209 5,252,783 27 5,140,217 283 $15,454,373 RECOMMENDATION: ATTACHMENTS: Building Permit Report for October 2000 REVIEWED BY CITY AGENDA # 4A DECEMBER 11, 2000 MEMORANDUM December 4, 2000 TO: Jim Hanson, City Manager FROM: Don C. Ford, Building Official ~~~ RE: Building Permits Report Please be advised that the following permits were issued in the month of November, 2000 TYPE PERMIT NO. PERMITS PERMIT COST VALUATION Single Family 1 3,479 90,000 Duplexes Addition/Remodel 18 4,807 623,742 Swimming Pools 2 435 36,400 Commercial 2 8,674 186,690 Fence 4 40 3,740 Utility 2 405 Roofing 13 530 54,797 Wells 1 10 Tree Removal 3 Driveways 2 50 Signs 4 135 TOTAL 52 18,565 995,369 Miscellaneous permits issued in connection with new construction, additions, remodeling, etc: Number of Permits Permits Costs Electrical 46 1,854 Plumbing 33 1,864 Mechanical 39 1.746 Inspections perton»ed November 2000 Building Concrete Electrical Plumbing Mechanical Trees Occup. Lic. 59 24 58 49 39 31 9 INFORMATION COMPILED BY PAT HARRIS -BUILDING DEPARTMENT i PREPARED 12/01/00,16-06-37 LICENSE ACTIVITY REPORT - NEW LICENSES CITY OF ATLANTIC BE A[N fOR PERIOD FROM 11/01/00 TO 11/30/00 PROGRAM OL 122E FOR 0.LL DEPARTMENTS LIC - CTRL - BUSINESS NAME ISSUED TYPE CLASS DESCRIPTION BUSINESS ADDRESS OWNER NAME BUS PNONE - BUS CITY ST ZIP OWN Eft ADDRESS 01 04890 3023 ADESSA HAIR 8 NAIL DESIGN 11/20/00 NEW P540 CoS ME TOI OGI ST 50 OCEpN BLVD ANNE BRADFORD -904- 249-7711 ATLANTIC BEACH, FL 32233 367 BELVEDERE ST, ATLANTIC BEACH, FL 32233 01 04949 .4777 ALEX E. MAN OLIS 11/02/00 NEW 5325 MISC. SERVICE ESTAB LISHNENT, NOT LISTED 578BEACH AVE ALEX E. MAN OLIS -904- 241-2227 - ATLANTIC BEACH, FL 32233 578 BEACH pVE NUE, ATLp NTIC BEACH, FL 32233 01 04950 4778 LI qU ID NATION 11/03/00 NEW RO50 BOAT, NEW/USED 12 20 W 3RD ST DALE CHRtSTENSON -904- 247-0808 ATLp NTIC BE A[H, fL 32233 112 OLEANDER STREET, NEPTUNE BEACH, FL 32266 01 04951 4779 BEAVER'S BUG BLASTERS 11/03/00 NEW 5365 PEST CONT RD L/E%TEft MINATOR 1089 -18 ATLANTIC BLVD CIY DE T. SLUNK -242- 2847 AT LANTI[ BEACH, FL 32233 - 518 13TH pVE NUE NORT, JAX BEACH, fL 32250 O1 04952 4780 CAR LOS GU FF EY'S [LEgN ING SERV. 11/09/00 NEW 5145 CLEANING/JANITORIAL/MAID SERVICE 900 PLAZA [pRLOS GU FFEY -904- 249-2747 ATLANTIC eE ADH, FL 32233 900 PLA2A -101, AT LANTTC BEAC N, FL 32233 01 04953 4781 BRAD LEy WEST SERVICES 11/16/00 NEW 5320 MINOR CONTRACTOR -MISC. ODD JOBS/REPAIR- 834 CAVALIA RD BRADLEY WEST -904- 247-9188 ATLANTIC BEACH, FL 32233 834 EA9ALLA ROq D, ATLANTIC BEACH, FL 32233 01 04955 4782 BgREF 00T TRACE PRODUCTIONS,IN[ 11/20/00 NEW R295 RECORDS/TAPES/CD/VIDEO SALES 2338 Op RE FOOT TRAC GLENN SEO OLD -904- 241-4741 ATL pNTI[BE A[H, FL32233 2338 BAREFOOT TRACE, ATLANTIC BEACN, FL 32233 O1 04956 4783 ELVIS DEDIC 11/28/00 NEW 5536 UpHO LSTERE R/FURNITURE REPAIR 1079 ATLANTIC BLVD ELVIS DEDIC -904- 242-8778 ATLANTIC BEACN, FL 32233 1079 ATLANTIC BLVD -7, ATLANTIC BEACH, FL 32233 TOTAL NUMBER OF NEW IICENSES- NEW, ACTIVE- TOTAL NUMBER OF LICENSES PftOCESSED- TOTAL, ACTIVE- 8 8 8 8 PgGE 1 d ls7 ~a ca ~z z~ ..~ V.+ A N O O O PUBLIC WORKS PROJECT STATUS REPORT (D)=DESIGN ENGINEER DEPARTMENT (CE&I)=CONSTRUCTION ENGINEER (C)=CONTRACTOR PROJECT DESCRIPTION PROJECT NO. AND INFORMATION STATUS ON 12/6/00 1. Village of Mayport (D)=USCG &JEA Force main installation and tie in for Coast Guard Station has been completed. (CE&I)=JEA & Public Works The lift station is 92%complete, installation of sanitary sewer is 50%complete, Design - 100% complete (C)=Petticoat Contracting (to USCG Station) and the force main is SO%complete. Roadway work is 90%complete, drainage is (C)=United Brothers (North of USCG Station) 2S%complete, water is 87%complete, and electrical conduit is 40%complete. Construction - 48%complete The scope of work was increased to add substantial electrical work and drainage. 2. Core City Stormwa[er Project CORE99 -Negotiated Subconsultant Agreements for approval by City Commission on (D)=Original by England, Thims & Miller 12/11/00. Sherry Drive design approx. 7S%complete Preliminary Redesign - 95% Revised Preliminary Design by The complete R-A-M Professional Group Re-Design by Aikenhead & Odom 3. Core City Sanitary Sewer PW0002 Completed 1°' Street, 2"d Street, 3rd Street, 4'" Street and 9d' Street and will Improvements Project (D)=Public Works complete Sm Street by 12/iS/00. Driveways are completed on 1" Street, 2"d Street (CE&I)=Public Works and 9'" Street Services are 4S%complete Design - !00%complete (C)=Insituform Technologies, Inc. Construction - 45%complete 4. Wonderwood Connector (D)=The R-A-M Professional Grouq Inc. Traffic ttansfersed [o new bridge over Puckett Creek. Contractor completed Utility Relocation (CE&I)=JTA ,JEA, and Public Works setting Bangers under bridge and the force main piping on south side of bridge. (C)=Superior Construction Co. Design - 100%complete Construction - 90% complete jor Atlantic Beach portion 5. Buccaneer Wastewater (D)=Eder Engineering New sludge holding facility design is 95%complete. Treatment Plant Expansion (C)=Meadors Construction Co. (CE&I)=Gannett Fleming Engineering Design - 100% compfete Construction - 99%complete -~ d l~ ~ ~ G'1 ~z ~d z~ ~# ~ A N O O O 6. Atlantic Beach and Buccaneer (D)=Gee & Jenson Project on hold until completion of Sewer Master Plan. Sewer System Improvements Design - !00%complete 7. Town Center (D)=Glen Mitchell & Assoc. Invitation to Bid was advertised 12/3/00. Mandatory pre-bid meeting will be held (C}=ABBA Construction on 12/1 I/00 and bid opening will be held on 12/15/00. Design-!00%complete Construction - 100% complete 8. Widening of Atlantic Blvd (D)=H. W. Lochner, Inc., Pilings will be finished in two weeks. Substructure is complete and concrete ~ Bridge FDOT - girders have all been set. Steel girders will begin this week. Expected completion ' (C)=Superior Construction Co. date of new bridge has been advanced to May 2001. Work on existing bridge will Design - 100%complete (CEBd)=Reynolds, Smith & Hills then begin. Construction - 43%complete 9. Mayport Flyover (D)=Pittman, Hartenstein & Assoc. Complete the section from W. 2nd to W, l" and awaiting Department of Health ]TA clearance to make final tie in. Flyover Design - !00% Connelly & Wicker for Atlantic Beach complete (C)=Superior Construction Co. (CE&I~Public Works Construction - 20%complete JTA overall, 98% for utilJry relocation Utility Design - /00%complete 10. Sewer Master Plan (D)=Smith & Gillespie Engineers, Inc. Engineer to made presentation to City Commission on 11/27/00. 100% complete 11. Utility Improvements 2000 (D)=Gee & Jenson Engineer [o submitted proposal for redesign. Staff reviewing. Design-!00%complete (C)= Redesign - 0%complete (CE&I)=Public Works 12. Effluent Suvc[ure Repairs (D)=Nadeem Zebouni; Inc. and Public Works Construction complete. PHASE I (C)=T. W. Blount, Jr. & Son Contracting Co. (CE&I}=Public Works Design - /00%complete Construction- 100%complete d ~ ~ ~z ~a ~# Vt.. A N ~' O O O 13. Effluent StructureRepairs (D)=Nadeem Zebouni, Inc. and Public Works Completed cross beams and in the process of completing X-beams. PHASE II (C)=T. W. Blount, Jr. & Son Contracting Co. (CE&I)=Public Works Design - 100%complete Construction - SO%complete t4. Replacement of (D)=Public Works Project complete. Hydropneuma[ic Tank at Water (C)=Gruhn May, Inc. Plant #4 (CE&I)=Public Works Design - l00%complete Construction - 100% complete 15. Beach Renourishment (D)=Army Corps of Engineers Project has been rescheduled to begin in the winter. Funds were approved by City of Jacksonville on 11/28/00. S[art date will be determined by Army Corps of Engineers. d [~ ~ ~ ~z ~~ ~~ +' A N O O O AGENDA#4A DECEMBER il, 2000 DEPARTMENT OF PARKS AND RECREATION 716 OCEAN BOULEVARD ATLANTIC BEACH, FLORIDA 32233-5455 TELEPHONE: (904) 247-5828 FAX: (904)247-5849 SUNCOM: 852-5828 http://ci.atlantic-beach.fl.us December 5, 2000 To: Jim Hanson, City Manager ~~ r From: Timmy Johnson, Recreation Director Re: Usage Report, Community Center, November 2000 Jim, here is a recap of activity at the Adefe Grage Community Center for the month of November 2000: Theater(Room A) Group/Event No. of Mtgs/Events No. of Peo le ABET Set Bldg/Performances Rehearsals and Workshops 21 800 Narcotics 3 60 Receptions/Board Meetings 5 125 Totals 29 985 Meeting Room (Room B) Group/Event No. of Mt s/Events No. of People A.A, Meeting 7 105 Board Meeting 12 240 CribbagelScrabble 4 20 State Attorney's Office 1 15 Totals 24 380 AGENDA # 4A DECEMBER 11, 2000 Summary of Donner Park activities: • Attended BEAM Board Meeting, Jacksonville Housing and Urban Development Meeting and USDA Commodities food meeting. • Attended a field trip to Douglas Anderson School of the Arts holiday play. Twelve children were in attendance. • Attended Alltel Stadium for Jaguar Football game. Forty-two children were in attendance. Also attended Music Concert at Alltel Stadium. Sixty-five children were in attendance. • Donner Park hosted its annual holiday feast. Community senior citizens brought dishes and spot-luck style dinner was served for the Thanksgiving holidays. • Donner Park also hosted its first annual "Mother-Daughter Night". Mothers and Daughters from the community attended the event. Food and drinks were served coupled with a discussion about issues concerning Mother-Daughter bonding and female issues. • A discussion with the youth regarding report cards and progress reports were held. A small workshop was initialized to assist the children in understanding teacher comments and grading scales. Summary of Jordan Park activities: • Preparations were made for the championship game for Flag Football. Trophies and plaques were ordered for the team members and their coaches. • Spoke to the kids concerning their grades and school attendances. • preparing to vacate the building for new construction. Other Adele Grage and Parks & Recreation activities included: • Decorated Town Center for tree lighting ceremony, sold Luminaria kits and reviewed Dutton Island plans. • Maintained landscaped areas. • Completed weekly City Manager's report. • Held departmental staff meetings, attended commission meetings, pertormed web page updates, answered phones and all other necessary functions of office.