Loading...
830 Sailfish Dr DEMO20-0016 Permit PacketOWNER:ADDRESS:CITY:STATE:ZIP: THOMPSON ERROL N 830 SAILFISH DR ATLANTIC BEACH FL 32233-4217 COMPANY:ADDRESS:CITY:STATE:ZIP: ELEV8 LAND CLEARING & DEMOLITION 745 PLAZA JACKSONVILLE FL 32233 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 171157 0000 ROYAL PALMS UNIT 01 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 830 SAILFISH DR DEMO COMPLETE DEMO HOUSE $5000.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC WORKS EROSION CONTROL INSTALLATION INFORMATIONAL Notes: Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact the Inspection Line (904-247- 5814) to request an Erosion and Sediment Control Inspection prior to start of construction. 2 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 8/11/2020 PERMIT NUMBER DEMO20-0016 ISSUED: 8/11/2020 EXPIRES: 2/7/2021 DEMO PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT DEMOLITION 455-0000-322-1000 0 $100.00 PW REVIEW BUILDING MOD OR ROW 001-0000-329-1004 0 $25.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL: $129.00 3 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container cannot be placed on City right-of-way. 4 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration, including sod, is required. 5 PUBLIC WORKS RUNOFF INFORMATIONAL Notes: All runoff must remain on-site. Cannot raise lot elevation. 6 PUBLIC WORKS SLAB DRIVEWAY REMOVAL INFORMATIONAL Notes: Slab and driveway to be fully removed. 7 PUBLIC WORKS GRASS INFORMATIONAL Notes: Full site to be grassed. 8 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL Notes: Any damage done to infrastructure must be repaired by Contractor. 9 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878. 10 PUBLIC UTILITIES DISCONNECT AND CAP INFORMATIONAL Notes: Disconnect and cap water and sewer lines. 11 PUBLIC UTILITIES INSPECTION PRIOR TO DEMOLITION INFORMATIONAL Notes: MUST call the inspection line to request an inspection of the disconnected and capped water and sewer lines PRIOR to demolition. 2 of 2Issued Date: 8/11/2020 PERMIT NUMBER DEMO20-0016 ISSUED: 8/11/2020 EXPIRES: 2/7/2021 DEMO PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 DEMO20-0016 DEMO20-0016 Job Duration: Two Days No need for temporary toilets DEMO20-0016 DESCRIPTION ACCOUNT QTY PAID PermitTRAK $129.00 DEMO20-0016 Address: 830 SAILFISH DR APN: 171157 0000 $129.00 BUILDING $100.00 DEMOLITION 455-0000-322-1000 0 $100.00 PUBLIC WORKS PLAN REVIEW $25.00 PW REVIEW BUILDING MOD OR ROW 001-0000-329-1004 0 $25.00 STATE SURCHARGES $4.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R12752 $129.00 Printed: Tuesday, August 11, 2020 4:52 PM Date Paid: Tuesday, August 11, 2020 Paid By: ELEV8 LAND CLEARING & DEMOLITION Pay Method: CREDIT CARD 352473978 1 of 1 Cashier: CG Cash Register Receipt City of Atlantic Beach Receipt Number R12752 1 CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800 BULLETIN 4-18 To: All Permit Applicants. From: Dan Arlington, CBO City Building Official Date: October 30, 2018 Re: DEMOLITION OF STRUCTURES. 1. It is the responsibility of the contractor to: a. Contact JEA to disconnect electric power. b. Disconnect and cap off water, sewer, and gas lines. 2. Silt fences must be in place and approved by Public Works before beginning demolition. 3. All underground tanks, concrete slabs and foundations must be removed with the buildings, unless otherwise approved by the City. The site should be left graded and clean for Final Inspection. 4. Removal of any trees requires a separate Tree Removal Permit, per COAB Code Of Ordinances, Section 23-21. 5. Protection of trees and vegetation during construction is required, per COAB Code Of Ordinances, Section 23-32. 6. Prior permission from the Building Department is required before blocking any part of the right-of-way or side walk. Dust and wind-borne debris generated from the demolition of a structure is considered unsafe and a hazard to the public health, safety, and welfare of residents in the surrounding areas. When demolishing a structure, the following steps are required to ensure that the minimum dust and debris leaves the property: 2 7. At least two hoses, with nozzles, capable of reaching to all areas of the property must be on site with an adequate water supply. 8. The structure must be sprayed with water for one hour before demolition begins. 9. The hoses must be used continuously during demolition, wetting down the structure, the debris pile, and truck beds when being filled. ASBESTOS. 10. All roofing and siding made from asbestos containing materials (ACM) are considered friable and must be removed from the structure, following NESHAP Guidelines, before demolition begins. This includes all commercial and one and two family residential dwellings. Please call for a Pre-Demolition Inspection, before demolition begins, and a Final Inspection, when demolition is complete. 11/01/18