Loading...
1240 seminole Rd ERES20-0054 Early Power LetterEarly Power Agreement & Release City of Atlantic Beach Building Department 800 Seminole Rd, Atlantic Beach, FL3Z2g3 P h o n e : (s04) 247 -s 82 6 E m a i | ; Egldlnft Lepl@cgi b. ! s ,+1ArL INIoBMAT|ON r-JtGHl.l.Gt=tTED:tN ,,QBAV,,lgli,Eoutnro, pE RM tT Hr 8RE92.0i00,53 *!i:q,!!^, J)( "-. r,o8't ' J O B AD D R ESS ; :124,0 SEMINO,L.F ;ROAD SERVIcETYPETI IoVERHEAD *--' L_.l?ft,NDERGRouND Electric power is requested now under the conditions and terms of thls fully executed Agreement and Release, , We, the undersigned General Contractor and Electrlcal Contractor, understand and agreet L. "Early Pewer" is purely for our construction convenience, lt is not required by Codes, and does not substitute for Flnal Inspectlons or the Co (Certiflcate of occupancy) that rnust be lssued before occupancy, and as such is at the discretion of the Butlding official, 2' The City of Atlantic Beach will make a special inspection prior to the early power energizing, All rough inspections must have prior Approval, Including meter base connections, 3' Occupancy or use of the new construction before a formal CO constitutes fraudulent use of the early electrlc service. Such actlon is expressly prohibited and penalized byThe City of Atlantic Beach Ordinances, A vlolatlon of this Agreement shall result in a request for prompt removal of electric servlce after a twentv-four hour notlce, 4. "Early Power" release authority is the Electrician and/or the,Contractor and must not occur before; a, Equipment, devlces and flxtures are Installed (or blanked off) safely, b, Panel ls complete with breakers and cover, and (labellng requlred atfinal Inspection), c, Service connection and grounding is complete. d. The electrlc system has safely passed through electrlcal check, e. Meter can is permanently marked with address, f. Temporary address numbers displayed (Permanent numbers are requlred for CO). 5, This fully completed form is to be submitted to the Building;Department by hand, mail or fax, 6. Future such Agreements will not be accepted from those who violate any one of the above items. Y.! t it coNTRAcToR l\flffif;,.,] : 11;,,]ely,]4 . Ifu r-< :,,,,, ; f.*^)* l,li,,.1:-*,fI i DATE: 08/'14t2020 CONTRACTOR SIGNATURE: ELECTRICIAN NAMEI ELECTRICIAN SIGNATURET Page 1. of 2 Updated 10/17/18