Exh 8GIJ - r AGENDA ITEM NO: ~~ DATE• ~ -' - c19 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA TTEDZ: Engineering Contract for Stormwater Improvements and Replacement at Various Locations SUBMITTED BY: Robert S. Kosoy, P.E./Director of Public Works ~~ DATE: January 7, 1999 BACKGROUND: As part of the Public Works Capital Improvement Program, we are making improvements to the stormwater system at several locations throughout the City. Estimated construction cost for this project is $262,000.00. We advertised our Requests for Proposals on November 25, 1998. Proposals were received December 2, 1998 and staff evaluated the firms on December 9, 1998. We received four proposals, and staff determined Smith & Gillespie Engineers, Inc. to be the most qualified firm ~~ to perform the required services. On December 14, 1998, the City Commission authorized staff to negotiate a contract with this firm. Staff has negotiated a contract with Smith & Gillespie Engineers, Inc. to perform design services for this project in the amount of 526,200.00, including survey fees. RECOMMENDATION: Award the contract for Engineering Design for Stormwater Improvements and Replacement at Various Locations in the amount of 526,200.00. Authorize the Ciri~ Clerk to send notification of the award to the firm, and authorize the City Manager to sign the contract with Smith & Gillespie Engineers, Inc. ATTACHMENTS: Engineering Proposal REVIEWED Bl' CITY 11~IAN'AGER: .. SMITH AND GILLESPIE ENGINEERS. INC. POST OFFICE BOX 33138 JACKSONVILLE. FLORIDA 32201 1904) 7x3.6950 DOUGLAS E. LAYTON, P.E. VICE PRESIDENT GENERAL MANAGER January 6, 1999 Mr. Robert S. Kosoy, P.E. Director of Public Works City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, Florida 32233 Subject: Engineering Services Watermain & Stonnwater Design S&G Contract No. 8505 Atlantic Beach, Florida Dear Mr. Kosoy: Thant: you for selecting Smith and Gillespie Engineers, Inc. as the most qualified engineering firm for design of your 1999 water distribution and stonnwater improvements. We have incorporated }•our comments from discussions last week into the following fee proposals for the ttvo projects: I. Watermains: Design $31,880 Permitting 3 180 Total Proposed S&G Fee $35,060 lump sum Survey (City P.O.) $23,525 -"} XI. Storm~vater: Design $20,400 Permitting $ 2,500 Survey Subconsultant $ 3.950 Total Proposed S&G Fee $26,200 lump sum The following describes the scope of services associated with the above breakdown of our fee proposal. No work is included unless specifically delineated below: • , r SMITH AND GILLESPIE ENGINEERS.INC. Mr. Robert S. Kosoy, P.E. S&G Contract No. 8505 January 6, 1999....page 2 I. Watermains: esi Provide biddable plans and specifications for approximately 13,500 LF of watermain in various areas of the Atlantic Beach service area. Service during bidding and recommendation of award are included. We have included separate bidding documents for the CDBG funded Ardella waterline and plan to include this small part of the work as part of the overall design drawings. To minimize engineering and survey cost the City has elected not to include profile views. ermittins?: DOT &BESD permit applications for approximately 13,500 LF of watennain and one response each to permitting agencies comments. Based on our preliminary discussion with BESD ire have included in our fee one "long form" construction permit submittal. Overall water system informarion and other support information for complerion of the permit will be required by the City. Permit fees will be paid by the City. Assistance During Construction: The City has elected to address engineering support during construction at a future time. Therefore, no services after recommendation of award are included in our proposed fee. We remain available ~~ to assist the City during construction if requested by the City. Survev: It will be necessary to f eld survey the waterline routes. We propose to manage this service under the design portion of our fee. To minimize the cost of the surveyor, we propose the Cit<- issue a purchase order to the surveyor and pay them directly based on our recommendation. The above amount is the lowest estimate of survey cost based on the attached three quotes for the work. -~ II. Stormwater: ei Provide biddable plans and specifications for stormwater improvements in locations detailed in our qualifications proposal. Our fee is based on the City providing existing partial surveys and partial designs of the areas. Service during bidding and recommendation of construction contract award are included. ermittin St Johns Water Management District permit applications for the improvements and one response to agency comments . Permit fees by the City: , ', ~. SMITH AND GILLESp1E ENGINEERS.INC. (~I Mr. Robert S. Kosoy, P.E. S&G Contract No. 8505 January 6, 1999....page 3 Assistance During Construction: The City has elected to address engineering support during construction at a future time. Therefore no services after recommendation of award are included in our proposed fee. We remain available to assist the City during construction if requested by the City. Survev: Partial survey has been done for these improvements. We will utilize the existing survey. It will be necessary to engage a surveyor to survey the remaining portions of the project. Due to the smaller size of this task, we recommend S&G handle this as part of our lump sum fee. The above is proposed under the general terms of our continuing Engineering Contract with the City of Atlantic Beach dated June 1, 1985. We will be glad to discuss this proposal in greater detail at your convenience. Sincerely, SMITH AND GILLESPIE ENGINEERS, INC. ~. Douglas E. Lavton cc: Mr. Jim Jarboe, City Manager ~ ~~ ~' •u • • i Confidential ~~ Breakdown of Fee for S&G Proposal dated January 6, 1999 Watermains: fours ~ ~ Senior Engineer 12 139 $ 1,668 QC Engineer 8 113 $ 904 Project Manager 149 74.3 $11,071 CADD Designer 395 47.7 $18,842 Administrative 42 48.35 2 031 Subtotal Labor 534,516 Reproduction, Travel, etc. 544 Total Fee 535,060 Stormwater: ~~~ ours $/Hr ~ Senior Engineer 19 139 S 2,641 QC Engineer 8 113 $ 904 Project Manager 135 67.8 $ 9,153 CADD Designer 168 47.7 $ 8,014 Administrative 16 48.35 774 Subtotal Labor $21,486 Survey $ 3,950 Reproduction, Travel , etc. 764 Total Fee $26,200 ~' /~G REQUEST FOR PROPOSALS PROFESSIONAL ENGINEERING SERVICES DESIGN AND PLAN PREPARATION FOR DESIGN OF STOR~ZWATER IMPROVEMENTS AND REPLACEMENT VARIOUS LOCATIONS The City of Atlantic Beach is soliciting for proposals from professional engineering firms to provide engineering services to design stormwater improvements in the City of Atlantic Beach. Proposals must be submitted by 4:30 PM, December 2, 1998 and addressed to: Mr. Robert S. Kosoy, P.E., Director of Public Works 1200 Sandpiper Lane Atlantic Beach, FL 32233 The scope of work involves: 1. Preparation of design plans and specifications for stormwater improvements at various locations throughout the City. 2. Within thi 30 days from the date of Agreement, develop a Pr esian to: A. Provide drainage unprovemen s on me treet ( turdivant to David Street). Remove and re-pour 20 driveways. Install Miami curb and gutter. Fill in under driveways and swales and modify inlets. B. On Seminole Road from Seaspray to Palm Street, install pipe and catch basins. (~ Connect to catch basin on Palm Street. C. Provide oil skimmer basins at the Public Works Yard. D. Replace culvert/headwalls on Aquatic Drive. E. On Donner Road, construct new line and basins from Sandpiper Lane to Keelens Street and replace existing pipe in kind from Keelens Street to the lift station on Donner Road. 3. Presen ive se s o t e re immary ans, with cost estimates and time schedules of the major tasks for the remaining design, bidding and construction to the City Staff for review. As directed by City Staff, make corrections or revisions to the Preliminary Plan. This will act as the 30% submission. 4. Within sixty (60) days from the date of Agreement, develop and submit for review five (5) sets of 60% plans of the Final Design to include: A. All plan and detail sheets for the project, showing pipe sizes, locations, profiles, design elevations, road profiles, with sui~icient details to adequately discuss and review the plans and design. B. Cost estimates and major task schedules for the remaining design, bidding and construction. 5. As directed by the City Staff, make corrections or revisions to the 60% plans. 6. Immediately after the corrections are made, submit Department of Environmental Page 1 o f 2 REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES ~"'~, STORMWATER IiI~IPROVENIENT5 AND REPLACEiVIENT AT VARIOUS LOCATIONS Protection and St. Johns River Water Management District permit applications to the Duval County Public Health Department and St. Johns River Water Management District with all necessary information. Any necessary process fees will be funded from the City of Atlantic Beach. Respond immediately to requests for additional information. Coordinate closely with the City staff during the permit process. 7. Within riventy (20) days from the date of approval of all permits, develop and submit for review to the City Staff five (5) sets of 100% plans of the Final Design to include: A. All plan sheets and specifications completed. B. All detail sheets completed. C. Coordinate with the City staff to establish dates for Pre-Bid meetings, Prequalification deadlines, advertisement and bid opening dates, and the date of tentative award. D. All specifications completed, including the Invitation to Bid and Bid Form. E. Final Cost estimates and major task schedules for the remaining bidding and construction. 8. Prepare plans and specifications as necessary for the bidding phase to be sold to the bidders through the City Purchasing Department. Attend the Pre-Bid meeting, and assist City staff to respond to questions from the bidders, and prepare any necessary bid addendums. The firms responding to this Request for Proposals must include detailed information concerning ( the following criteria for selection: 1. Staff Competence and Availability during the entire project period, including detailed resumes. Rating weight - 30%. 2. Past similar project experience, including size, construction costs, and familiarity with water main design. Rating weight - 20°'0. 3. References with telephone numbers. Rating weight - 10%. 4. Project Approach, with specific tasks outlined for each phase as outlined above. Rating weight - 30% 5. Current Workload for the firm and the selected project team. Rating weight - 5%. 6. Financial Information, including the most recent audit summary for the firm and the current certificate of insurance. Rating weight - 5%. All proposals will be reviewed by City Staff, and a submittal of the proposals of the five top rated firms will be made to the City Commission. Selection will be determined by the City Commission. Negotiation of fees will commence upon City Commission approval, and the Standard Form of Agreement (EJCDC) will be developed for signatures. All work will commence immediately following signing and approval of the Agreement. All questions concerning the submittal of proposals must be addressed to Mr. Robert S. Kosoy, P.E., Director of Public Works. No questions maybe directed to any other party. Submit three (3) copies of the proposal. Page 2 of 2