Exh 8G.~. STAFF REPORT AGENDA ITEM: SUBMITTED BY: 6 1_Z~. q9 Request by Community Development Board to meet with RAM Professional Group regarding Lot Coverage Ordinance George Worley II, Community Development Director DATE: January 19, 1999 BACKGROUND: ~~~ The Community Development Boazd is reviewing the proposed Lot Coverage Ordinance with the intent of making detailed recommendations to the City Commission to adopt a modified version of that ordinance. The Board is pursuing efforts to clearly define "Lot Coverage" and to assign maximum percentages of such coverage. They are at a point where they must decide to assign a single, city-wide maximum, or to assign maximum percentages based upon zoning districts, drainage basins, or some other logical boundary. In order to make such a determination, the Board believes that it is necessary to understand the basis upon which the Core City Project was designed. Specifically, the Boazd desires to know if the design considered existing impervious surface conditions or if it used some ~~ form of industry standard for residential uses. If actual conditions were used, did the design factor-in any growth or increase of impervious surfaces? The Boazd believes that this information will help them determine the percentages necessary to protect the integrity of the Core City Project. Since this project is a huge investment for the City, the Board feels that this should be of considerable concern. Several additional questions have been raised by the Board, relating to the definition of "impervious surfaces", which can be answered at the same time. To accomplish this, the Board has requested Staffto invite the RAM Engineering Group to attend a special meeting for this purpose. RAM would be expected to answer questions based upon their evaluation of the Core City Project design. ~• , Public Works Director Robert Kosoy has contacted RAM to determine what they will ''~ chazge to attend a meeting with the Community Development Board. That cost will be $1,375. ~~- Two principals of the firm will attend to answer all of the Boazds questions. ,.~..~; RECOMMENDATION: The Community Development Boazd requests authorization to expend $1,375 for RAM Engineering Group o attend a Special Meeting at a date to be set. REVIEWED CITY MANAGER: ~- AGENDA ITEM NO. e MEMORANDUM January 20, 19999 TO: David Thompson City Manager FROM: Robert S. Kosoy Director of Public Works SUBJECT: Consultant Fees by R-A-M for Appearance before the Community Development Board ~, On Tuesday, January 19th I discussed with Mr. Frank Gray, P.E., Vice-President of R-A-M, the desire to have their firm meet with the Community Development Board and discuss the issues of impervious surface and ordinances to effect a recommended percentage. I advised that this presentation would not be on the same scale as the Core City presentation and requested a quote for their services. On January 20th I received a written quote for three options. It is my recommendation that Option #3 for $1,375.OOlmtg. be approved since the two individuals from R-A-M, Mr. Frank Gray, P.E. and Mr. Wayne Reed, President are very knowledgeable about the topic to be discussed. If actual engineering services, such as detailed engineering calculations and data, are desired, an additional scope would need to be negotiated. If you have any questions please contact me at 247-5834. cc: George Worley, Community Development Director RSK/Imh ` 01~-20-1999 08~42AM FROM R-R-M PROFESSIONAL GROUP TO A 1 1 ~' 2475843 P.01 ;~;~• THE ~t-/~-~VI PRQFESS~~N,I~1. GROUP, INC. :~ ENGINEERING-PLANNING-ENVIRONMENTAL CONSULTANTS January 20, 1999 Mr. Robert S. Kosoy, P.E. Director of Public Works City of Atlantic beach 122 Sandpiper Lane Atlantic Beach, Florida 32233 Post-rt" Fax Note 7671 ~~ ~,- To Colt)epl Co. Pr,ons ~-.2 y - .5'8 Pnono a ,x O Fa: M ~ Fax A Q 7 Re: Proposed Meetings Attendance Core City Redesign/Tailwater Control Design R-A-M Project No. 1998-021-01 Dear bob: In response to your request for a proposal on attending meetings to be held by the Community Development Committee, we propose three alternatives: 1. 4-person attendance, which would include The R-A-M Professional Group, Environmental Research & Design, and Marshall, Provost & Associates $2,750.00/mtg. 2. 3-person attendance, which would include R-A-M and ERD or MPA $2,000.00/mtg. 3. 2-person attendance, which would include R-A-M only $1,375.00/mtg. These prices do not include time for analysis of existing impervious areas or analysis for recommending a percentage impervious area for City Ordinance. Please advise should you need further information (~~. Best personal regards, T.HE R A-M PR FESSIO L GROUP, INC. C.~/ Frank E. Gray, Jr., Principal and Director of Engineering FEG:Imj ~b55 Salisbury Road, Suite 210 -Jacksonville, Florida 32256 (904) 296.44x0 FAX 0904) 296-4580 TOTAL P.01 01-25-1999 03~46PM FROM R-A-M PROFESSIONAL GROUP TO 2475843 P.01 ., .~..~~ ~' _ - ~~ THE R~A~M PRI~~~SSIt~NAL GRtfUF; INC. ..':~ ENGINEERING-PLANNING-ENVIRONMENTAL CONSULTANTS January 25,1999 Mr. Robert S. Kosoy, P.E. Director of Public Wvrics City of Atlantic Beach 122 Sandpiper lane Atlantic Beach, Florida 32233 Post-it' Fax Note 7871 oats ~~~ Tb From CoJOepG Co. ~, .~ Ptpr,y M~ , L ~ p ~ v Pt+one r .L Fax R x ~ t' Fax N ~f ~r Re: Impervious Surtace Ordinance Services R A-M Project No.1998-021.02 Dear Bob: This is to confirm our conversation of this date, wherein The R-A-M Professional Group, Inc. (R-A-M) has agreed to provide as-needed services, specifically requested by you on the above-referenced project on a time and materials t~~ basis. We propose to utilize the attached rates, which were also furnished previously as part of our base Core City contract. In this regard, we would make available to you other team members, if needed, and only invoice for time actually spent. We appreciate your interest in The R A-M Professional Group, inc. and look forward to assisting you in impervious surface ordinance services. Feel free to call with any questions or comments. ' Best personal regarcls, THE R-A-M PROFESSIONAL GROUP, INC. Wayne .Reed President WCR:Imj Att. ~' 4655 Salisbury Rvad, Suite 210 -Jacksonville, Florida 32256 (904) 296-4440 -FAX (904) 296-4580 01-25-1999 03~46PM FROM R-A-M PROFESSIOh~L GROUP TO 2475843 P.02 ~" '~.~ . .~.....~ .. •..... ~'~ ~ ~~ THE R-AI-IIA PROFESSIONAL GROUP, INC. ...~ ENGINEERING-PLANNING-ENVIRONMENTAL CONSULTANTS THE R-A-M PROI=ESSIONAt_ GROUP, INC. STANDARD RATE SCHEDULE As of January 1, 1998 Category rte; Hourly Rate Principal/Project Manager ..................... . Senior Engineer/Planner ....................... . Design Engineer/Planner ........ •.. ............. . Senior Designer .............................. . CADD Operator .............................. . Engineering Technician ........................ . Clerical ...................................... $105.00 $95.00 $80.00 $70.00 $60.00 $50.00 $40.00 Out of Pocket Expenses Out-of-pocket expenses for items including, but not limited to, automobile mileage, reproduction (photocopies, bluelines, etc.), long distance telephone charges, express deliveries, film and developing, and computer diskettes incurred in the performance of projects will be invoiced at the actual amount incurred. Subconsultants Expenses for any subconsultants retained at the request of Client to pertorm services beyond those typically offered by The R-A-M Professional Group, Inc. will be at subconsultant invoice plus ten percent (+10%). 1~, 4655 Satinbury Road, Sulte 210 -Jacksonville, Flotido 32256 (404) 296-4440 -FAX (904) 296-4580 TOTAL P.02