Exh 8E AGENDA ITEM NO: ~ L~ COMMISSION MEETING DATE: S- /D- 99 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT -.w AGENDA ITEM: Levy Road Improvements, Final Change Order SUBMITTED BY: Robert S. Kosoy, P.E., Director of Public Works ~~ DATE: May 3, 1999 BACKGROUND: The Levy Road Improvements Project is now complete. Additional expenses were incurred by the contractor, Petticoat Contracting, Inc. during construction. These expenses included additional paving in the roadway transistions, asphalt driveway repair and concrete driveway repair. Also, extra waterline and drainage pipe was needed to avoid utility conflicts discovered in the field. The Public Works Director reviewed these items, and determined they were all legitimate expenses not included in the original design work. The total amount for additional expenses, less deductions for materials not used is 526,721.68. This brings the total contract price to $320,626.38. The original contract, including a contingency of 520,341.20 was $309,553.20. Therefore, this represents an increase of 511,073.18, or 3.6% over the contract price. Funds for the additional work are available in the Gas Tax Fund, as the bid for milling and paving was lower than expected. RECOMMENDATION: Approve the Final Change Order for Petticoat Contracting, Inc, in the amount of $26,721.68, which increases the total contract price by 511,073.18. ~~ . ~ ~` ~ ~-z, ATTACHMENTS: 1. Final Change Order . 2. Change Order Number 1. 3. Final Payment Calculations. REVIEWED BY CITY MANAG 97, yg $cdq~' # ~c~ + ~~ ' ,.v. ov tn~~ ~J.io ri.~ :tU•: tJl ~ynr~ rnutt•UA'1' t.ulvlxil.llAC. ort; actor: Patticost Cc:,:: Ja:a3, Inc. Owttc:: Ccty of Atinnac $~cb 17atc: 4~2?!S ~; .=:`ta.-~ oa: M:. Gary ~ •i;:,r City Proj`:cr No. CP-9604 Proje~: Levi Rork l:nerm•: r:ar.ts 'i ou are hereby +•e~uescr3 z~ c, Y:.al;! ititn the following changes in the Cvrttrzct T3ocum2rnr: Re-rr~,l ScB^x oF~.r.''it"_: ' ~ Coif i;~,l:s } : yz , ZT?31T COF~1",i~''~.,=.~T' Y~:.T,~: Er ' ~ ;;. ;7 ~~ C ~~ 3Or= QTY UNIT PRlC;r s .~3C'.m 5 ~ 7. 12" atttbilizy1 ~s;L;;.:.d~ on psis row 134 SY So.76 ~ ~;CI,';,-- a. ~' Li:::arock a;:.~ . cn ::.ria :oaD 282 SY Sb.9:t + 5i r~:.'~._;,. •, 9. ~ A9~l:tlt, 3l4' T~- _ 5-~: o~~ r:-~~ rosJ 378 SY 51.54 I s 5°' ,~, - )i;~.~1 • Aspl+n3t. 1 714" ,y_:~~•_i 318 SY 52.39 5~ti: ~:. ~ j - Co;::.rctc~'i~-.;=s;•~:'•;eir ~ --------r.~._ - I20 SY 554,50 ~ ~,+._~.. ~ ---- t~J ; Asplsalt L,iti•?- ~' «'"_~--- 388 SY $33.70 ....._. 5T3,0" ... _ _ • ;:~. ~ - (:en';r.,eC'u.:}• _ 3.t )~ x10.'4 ~ -3- -... i-~? f .~• ._..M ~i5~F7:)i~:~ I~'S::+i."": _ ;'r, . ZO LF 537.00 ( ~ ~ r ~;~~, Y . ~. .. , . :;}c~ rn~ 5:~:w :..~' ;- 7 `'" 3:':!:ia~ge 2 EA S2:5.0v ~ ~.___; ~ Y.,.....';~.. i 70" ?VC: matt°ii:~::_ ~ ~Yi;3, 3,13 13 LF 520.C0 ~ ;;'~~.;.:. t .~. ~ 1?."'?V(' Glctc~'=....; :,.~vD~.rrtlu 33 LF d2I.CQ ~ "~ti:: : - ?5. ... ~ ]ii' :~str Va'•-: ;:. :%,;;:~ ~.:t.) 1 ~A 00 57?00 ` ' ._ . - 'i:^ ~ !;' . _, ,... ,.. .-.._ . ,. . . i7. , . • , $o~•{in~~__ w 201 SF 50.79 1 (53$,75; ; - .... ::~. ~ f;" Fti'C 1'~atcri::.c 5 LF 510.00 050.00) I ..'_.._.._.,.. _ ro~rALS ~s;~a.7s) s3a,s : ~ ~.. T~. c7 (:i u~~~rvG 1N CC!?`7 : ?.'ai: i N~ s~.E ~t~S 7 : .. _. r.' rYe reric: d s :cri of t-~:.,r;: ,: i~ i::..~~~.r,~ trc ptoje_rt cyst by SZ6,721.68. The coa.ract yric; u~1 incr^~.~ Iro:~ 339;,'~ ~ ~ ~~ :5 's324.626.3s ~,ccent_d 13}•: ~~~'~ ~ D...te: '~" Z~ g`~ C"ortres:c =~'~ /;~.1`„•ev~t' Cd~'i'.y,eraJV, T~J•. O~rrr'. t.i' r... ~' J ----"'"~ ~AANrE t~RDER N0.1 ~' Contractor: Petticoat Contractive, Inc. 11025 Blasius Rd. Jacksonville, FL 32226 Attention: Mr. Gary Wilson Project: Levy Road Improvements Owner: City of Atlantic Beach Date: 12/21/95 City Project No. CP-9604 You are hereby requested to comply with the following changes in the Contract Documents: I. Revised Scope of tVork DECREASE INCREASE IN ~ C01~1TRACT ITEM UNIT CONTRACT PRICE S NO. DESCRIPTION QTY UNIT PRICES PRICE S e ete Efrluent Outfall Improvements 1 LS 525,000.00 ...: ....... ~~~~>~azs~a:~ . 26 (Delete 8" PVC Watermain 8: Fittin_s l3 LF 512.00 °S? I5'g4`:: 31 I Delete 6" X 6" Tapping Sleeve 8: Valve 1 E:~ 52,000.00 -:~<s'S2`40a;Ut}' :::::: 34 Delete 8" 1tiLJ. Gate Valve & Box I E:~ , 5813.00 :::: ~~~~~?~ S81?;00; 37 'Install Water Services ; E? I 51 098 00 . , . 53,294.00 35 I Install 8" X 3" Ta ins Sleev pp a 8: Valve I E A ++ 1 ~ S_ 9_ 0.00 ~ '~ S_ 950.00 39 Locate R'ire and Nan-Lletallic Tape 2131 LF 50.50 S1,065.50 40 ~ Install Rip-Rap Bags at DIES I00 EA S12.70 S 1,270.00 41 Insta1160 LF 12" PVC to replace ! LS 5300.00 T" 5300 00 driv w e v a cu v 1 ert t `; . . . 42 + Trench re air E ` t~°a~<~ <€<< p 2 .~ 5500.00 S 1,000.00 43 ! Replace mitred end sections c~Tth i inn 1 LS ' {~ S ~0 00 P P _._ . 5,500.00 TOTALS ~~;$2$fY?S:QO~' 512,379.50 1~"ET CIi~`'GE I?~! CONTRACT PRICE ~~SISS4~SQ` The above revised scope of work wilt decrease the project cost by S I ~,6-{5.50. The contract price will decrease from 5309,553.20 to 5293,904.70, with no contract time extension. R Accepted By: 1 Date: ~ ~3 9 C ract Approved By: _ __----~---~-~_`~ ' ~ ~ ~~~ 4 f Date: Owner ~ ~' CITY OF ATLANTIC BEACH LEVY ROAD FINAL PAYMENT CALCULATIONS ITEM {Main Road:} 12" Subgrade, SY 8" Limerock Base, SY Asphalt, 314" S-III, SY Asphalt, 1-1/4" S-1, SY Asphalt Driveway Repair, SY Concrete Driveway Repair, SY New Concrete Curb, LF 15" HDPE Drainage Pipe, LF Mitred End Section for 15" Pipe, EA 10" PVC Waterline, LF 12" PVC Waterline, LF 10" Gate Valve (in-line valve at Rose St.) Sodding, SF 6" PVC Waterline, LF TOTAL ADJUSTMENTS t BID AMOUNT MEASURED OVER-RUNT UNIT TOTAL AMOUNT UNDER-RUN COSTS COST 7225 7359 134 $0.76 $101.84 7077 7359 282 $6.93 $1,954.26 6981 7359 378 $1.54 $582.12 6981 7359 378 $2.39 $903.42 154 542 388 $33.70 $13,075.60 72 192 120 $54.50 $6,540.00 115 34 $10.30 $350.20 16 20 $30.00 $600.00 3 2 $275.00 $550.00 2110 13 $20.00 $260.00 1 B 33 $21.00 $693.00 1 1 $1,200.00 ~ $1,200.00 5604 -204 $0.19 ($38.76) 21 -5 $10.00 ($50.00) 826,721.68