Cloister - 4Hello,
I mailed you a letter, copied by email, dated 6/12/2020, arranging for
a remote video conference, regarding the structural issues between
Cloister Units 64, 65, and 66.
Since that time, we have received a letter from Ansbacher Law, stating
that an engineering investigation will take place in Unit 65, on
7/22/2020.
In light of that information, the City manager has determined that the
remote conference will not be necessary.
Thank you very much for your cooperation in this matter.
Sincerely,
Dan Arlington
Dan Arlington, CBO
Building Official
City of Atlantic Beach, Florida
darlington@coab.us <mailto:darlington@coab.us>
(904) 247-5813