Exh 8D..~ .,_ .~ AGENDA ITEM NO. ~: Meeting Dater S - Z y~ -' 99 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Change Order No. 4 -Lifeguard Station SUBMITTED BY: Don C. Ford DATE: May 18, 1999 BACKGROUND: Enclosed is Change Order No. 4 for the Lifeguard Station Project. The attached memorandum explains the items in the change order. Please note ~"1 that this is a no cost to the City Change Order. RECOMMENDATION: Approval of Change Order No. 4 ATTACHMENTS: Memorandum to David Thompson REVIEWED BY CITY ~ ~ /;~~ (~ 800 SEiv1INOLE ROAD ATLA\TIC BEACH, FLORIDA 32233-5445 TELEPHONE (904) 247-5800 FAX (904) 247-5805 SUNCO~i 852-5800 MEMORANDUM May 18, 1999 TO: David Thompson FROM: Don C. Ford ~.~(~ RE: Lifeguard Station Change Order #4 Attached is Change Order #4 for the Lifeguard Station project. The changes include structural additions to strengthen the wall system by using plywood on the n interior as well as the exterior. This plywood replaces the sheetrock which is more susceptible to damage from moisture. Other Items include a window in the bathroom at no charge, smaller a/c unit, an aluminum electric meter can which will outlast a metal can, additional strapping and red head anchor bolts. DCF/ph Enclosure ' 04/29/99 ~. 4.2 CHANGE ORDER FORM AND ACCOUNTING SUMMARY CONTRACTOR'S NAME: Dowling Construction ADDRESS: 241 Atlantic Blvd. #5 Neptune Beach, FL 32266 PHONE: 246-1833 FAX: 247-3147 ;°~ ~~ ~- ?y ~-~ n-,~ LIC #: CB0006834 ~-~. f' µ.,,., ~ ~ ~~ DATE:27Apri11999 ;~ij''+~~ 5 1999 City o. Atlantic Basch OWNER'S NAME: City of Atlantic Beach Building and Zoning ADDRESS: 800 Seminole Rd. Atlantic Beach, FL 32233 PROJECT ADDRESS: Oceanfront at Ahern Street Atlantic Beach, FL CONSTRUCTION CHANGE ORDER # Four I. GENERAL SCOPE OF WORK DESCRIPTION Pursuant to the Construction Agreement between Contractor and Owner dated 15 September, 1999, Contractor agrees to perform the following as a change to the original specifications and plans: Cost: 1. Reframe west wall of bathroom to include vanity into bath. 200. 2. Add 2020 Marvin awning window to bathroom. NC. 3. Use'/~" CDX plywood on East-West interior walls for stiffness Vs drywall. 500. 4. Upgrade stairwell roof system from "single ply" membrane to Galvalume metal system with doubled wind resistance clips. 400. 5. Downgrade air conditioning system to smaller "package system". (965.) 6. Supply aluminum meter can vs steel. 74. 7. Shift electrical panel box one stud bay South. 0. 8. Use 3/" plywood stair treads vs 2x12" PT pine. 0. 9. Add 8 additional First Floor wind resistance straps with redhead anchors. 192. 10. Use 2x8"PT Stairwell Roof fascia with subfascia vs 2x4. 224. Total: $1,025. LUMP SUM PRICE FOR ALL WORK ABOVE: No charge . +, 04/29/99- Lifeguard Tower-Dowling Construction 2 of 2 '` Additional time needed to complete project as a result of this Change Order: 10 Days. ll. ACCOUNTING SUMMARY A. Original Contract Amount: $7$.616• B. Net Change by all prior Change Orders: $17.884. C. Adjusted Gross Contract Amount prior to this Change Order: $6.500. D. Amount of this Change Order: $QO E. Adjusted Gross Contract Amount including this Change Order: $96.500. III. GENERAL CONDITIONS ~" INCORPORATION This Change Order, by agreement of Owner and Contractor, is incorporated by reference into the Construction Agreement between Owner and Contractor. All terms and conditions in the "General Conditions" section of the Construction Agreement between Owner and Contractor apply to this Change Order. I have read and understood the Change Order above, and {agree to all of its terms. Date David Thompson City of Atlantic Beach Date Heywood A Dowling Dowling Construction