Loading...
Exh 8E AGENDA ITEM NO: ~~ DATE. CITY OF ATLANTIC BEACH CITY C01~IMISSION MEETING STAFF REPORT AGENDA ITEM: Staff Changes for Buccaneer Utility Division SUBMITTED BY: Robert S. Kosoy, P.E./Director of Public Worl~ ~ Harry E. McNally/Plant Division Director ~~~~ DATE: May 18, 1999 BACKGROUND: Due to Florida Department of Environmental Protection (FDEP) permit requirements associated with the Buccaneer Wastewater Treatment Plant upgrade, as well as other regulatory requirements, staffing changes for Buccaneer Utility Division are recommended as per the attached memorandum. All recommendations are for upgrading existing positions, and they do not include adding personnel. The new "designations" include higher levels of shift coverage and certif cations for personnel as required by FDEP. For positions of Lead Operator, Dual Licensed Operator, and Cross Connection Administrator, the City has qualified/certified personnel that are already capable of moving into the ne~v job designations. The Wastewater ` i Plant Operator and Collection/Distribution Operator positions are currently vacant, and we hope to upgrade to these positions before hiring ne~v personnel. The Lead Plant Operator position, and the additional Wastewater Plant Operator will be needed to meet the requirements of our FDEP permit upon completion of the Buccaneer Wastewater Expansion project. (We suggest upgrading the Wastewater Plant Operator to a Dual Licensed Operator next fiscal year). Upgrading the Water Plant Operator to a Dual Licensed Operator will allow for flexibility in covering shifts at the wastewater plant when personnel are on leave. Upgrading the Utility Worker position to aCollection/Distribution Operator will also allow for flexibility in personnel usage, and will ensure a higher level of skill and knowledge in working with the water and sewer systems. The Cross Connection Administrator position will perform technical and administrative tasks to prevent cross contamination of the potable water system, as required by FDEP. Three of these upgrades are requested immediately. It is important to assign the Lead Plant Operator and the Wastewater Plant Operator to the Buccaneer Wastewater Plant as soon as possible, so those employees can observe construction and receive training in the operation of the new sequencing batch reactor plant. The CollectionlDistribution Operator upgrade is also needed now to maintain the high quality of work in the distribution and collection systems. The cost of the three position upgrades requested for the current fiscal year is approximately $3,500.00. Funding for these three position upgrades is available due to personnel shortages t which have occurred during the year. Also, upgrading these positions will allow for weekend plant coverage at the wastewater plant, as required by FDEP. The weekend shift is now covered by operators on overtime. Overtime costs for this purpose will be greatly reduced if the position upgrades are approved. The other position upgrades are requested to begin during the next fiscal year. The annual cost of these hvo position modifications, plus costs of the upgrades beginning this fiscal year is approximately $22,000.00 and will be requested during the budget process. No additional personnel are requested. All of the modifications proposed are upgrades of currently approved personnel positions. RECOMI~~IENDATION: Approve the personnel classification modifications for the Buccaneer Utility Division, as noted on the attached memorandum. ATTACHiVIENTS: 1. Personnel Position table. REVIEVYED BY CITY 11~IANAGER: t ~ l ,. May 7,1999 MEMORA;~'DUM TO: GEORGE FOSTER, HUMAN RESOURCES DIRECTOR FROM: BOB KOSOY, PUBLIC WORKS DIRECTO~~ ~ ~U HARRY MCNALLY, DIVISION DIRECTOR~~~~v RE: PERSONNEL POSITIONS l The following is a summary of personnel changes we are requesting in the Buccaneer Division. PRESENT POSITION COMiVIENTS POSITION REQUESTED Wastewater Lead Plant This will meet the FDEP permit requirement. The Lead Plant Operator Operator position will require a class "B" state wastewater Operator Effective ASAP operator's license, and a class "C" water operator's license. This pasition is needed immediately. Utility Wastewater Another wastewater plant operator will be required to meet the Worker Plant Operator level of operator coverage required by the new FDEP permit. Effective ASAP This position will require a class "C" state wastewater operator's . license, and is needed immediately. We would like to upgrade • this position next budget year to a dual Iicensed plant operator, and require the person in the position to obtain a class "C" water license within 2 years of their hire date. Utility Collection/ Due to the volume of work in the distribution and collection 1~Vorker Distribution system, the Utility Worker in this division performs the same Operator duties as the CoIlection/Distribution Operator. By reclassifying Effective ASAP the position, tive can require the employee to be certified in distribution collection, which ensures a higher 1eveI of sl.-ilI and knowledge. This position upgrade is needed immediateiv. Water Plant Dual Licensed Adding the requirement for the wastetivater license mill allow the Operatoz , Plant Operator person in this position flexibility to legally operate the water Effective plant to cover for employees on leave, or perform other tivater 10.•799 plant duties as needed. This position tipgade is requested for budget year FY 99/2000. Meter Reader Cross This posirion tivill replace the presently unfilled meter reader Connection position. Across connection control progam is required by Administrator state law. The person in this position will administer the Effective progam, which ensures no cross connections between potable l U.'1/99 and non potable water. This position change is requested for budget year FY 99/2000.