Loading...
49 Dudley Street_rev 9-14-20 RES20-0172 renarrative-calcs 2 of 5_1 2650 ROSSELLE STREET, Suite 2A Jacksonville FL 32204 Ph: 904-551-4945 Civil Design and Construction Management Professionals September 8, 2020 Atlantic Beach Site Drainage Improvements In-Fill Lots Lot Address: 49 Dudley Street Atlantic Beach, FL NARRATIVE: The attached calculations are provided to support the lot drainage design at 49 Dudley Street in the City of Atlantic Beach, FL. The calculations were performed utilizing the equations in the city ordinance sec 24-66(b). The referenced project site was vacant and the calculations utilized this as the predevelopment condition. The total lot area shown in the pre and post calculations was calculated from the table in the survey. The proposed project will construct a home, driveway, and stormwater storage facility. The runoff coefficient was provided based on the impervious values and associated coefficients of sec 24-66(b) of the code. Comp. By: Date: Public Works Department City of Atlantic Beach Permit No:_____________________________ Address:49 Dudley Street Required Storage Volume Criteria: Section 24-66 of the City of Atlantic Beach's Zoning, Subdivsion, and Land Development Regulations requires that stormwater runoff from impervious areas be stored onsite. Volume to be retained is as follows: V = CAR/12 which is the Modified Rational Method for estimating stormwater runoff Where: V = Volume of Runoff to be stored (cubic feet) C = Runoff Coefficient, 0.92, the difference between impervious area (C=1.0) and undeveloped conditions (C=0.08). A = Impervious Area (square feet) R= 25-yr / 24-hr rainfall depth (9.3 inches for Atlantic Beach) Onsite Storage Volume Required for Impervious Area: Lot Area = 9,421 ft2 Impervious Area (A) = 1,889 ft2 =20.1% V = 0.92 x 1,889.0 x 9.3 / 12 V = 1,347 ft3 Provided Storage: Area 1 - Relative Elev.Area Storage Sideslope:4 :1 (ft)(ft2) (ft 3) 8.0 422 BOTTOM size:23.5 X 12 9.0 981 TOB size:31.5 X 20 Area 2 - Relative Elev.Area Storage (ft)(ft2) (ft 3) 0.0 0 BOTTOM size:0 X 0 0.0 0 TOB size:0 X 0 Area 3 - Relative Elev.Area Storage (ft)(ft2) (ft 3) 0.0 0 BOTTOM size:0 X 0 0.0 0 TOB size:0 X 0 Inground Storage: = A*d/pf Total Storage Area at TOB (A) =981.0 ft2 Depth to ESHWT from BOTTOM (d) =2.0 ft, default is 2.0 ft, verify onsite ESHWT Pore Factor (pf) = 0.4 default is 0.4 Inground Storage Provided =784.8 ft3 Required Treatment Volume =1,347 ft3 Supplied Treatment Volume =1,486 ft3 Reynold D. Peterson, P.E. 702 0 0 9/8/2020 Retention COAB_STORAGE CALCS_49 DUDLEY Street 9/8/2020