Loading...
1600 Selva Marina Drive 13-00003848-02 (Plan Revision 2) vb Re. tst o 12. REwised d9or/window assembly at golf pro shop (122). 4 AIN C D w S STRUCTURAL REVISIONS: 1. 1 steel beam, 2 steel columns, and two footings added to support roof at new large opening between Dining room and Multipurpose room.See sheets S1.1 and S1.2. ve.See sheets S1.2 and 2. One section added (13/54.2)to detail the add h beamt reremovedfrom oto create the multipurpose room ,was moved to 2. 3. One column and footing,which was in a wall the next wall to the North.See sheet S1.1. 4. The beam that increased in span due to the column from See sheet S1.1.zed.See Sheet 51.2. 5. Thickened slab footing added under stair walls at the South West end of the job. MECHANICAL REVISIONS: M0.1 1. Outside airflow modified 2.AHU-3/HP-3 selection changed 3. EF-1 Selection changed M0.2 1.Ventilation calculation schedule for units s 3, r new 6 ad t were updated to reflect the floor plan changes 2. Added ventilation calculation schedule M1.1 1.Galley(104) removed, air flow rebalanced for AHU-2 A 2.AHU-3 ductwork redone for multi-purpose room 3.AHU-7 ductwork changed to accommodate change to locker room's changes per floor plan 4. Relocated DSS-1 to security area (203) 5.AHU-6 ductwork changed for changes to pro-shop area 6. EF-1 and exhaust ductwork changed for new floor layout 7.Added AHU-9 and all ductwork and air devices for system 8.Added condensate drain notes M2.2 1.Changed condensate drain note 2. Deleted condensate drywall detail REVISIONS: i ELECTRICALcop ; E0.1 Rev 2:Added fixture type D2 E0.3 Rev 2: Revised panel schedules'L', 'AC' and 'M.' E1.1 Rev 2: Revised power and fire alarm arrangement for Mezzanine plan changes associated with new Multipurpose Room,General Mgr and Pro Shop Offices, and E2.1 Rev 3: Revised lighting arrangement for floor plan changes associated with new Multipurpose Room,General Mgr and Pro Shop Offices,and Mezzanine PLUMBING REVISIONS: P0.1 1. Added S-1 to fixture schedule 2. Plumbing Fixture Demand Tabulation for both total project 1 countertop lavatory and asstsoom floor drain. ted: a. removal of 1 water closet, 1 wall hung lavatory, 2 CRONK - eDUCH ARCHITECTURE March 26, 2014 City of Atlantic Beach Building Department 800 Seminole Rd. Atlantic Beach, FL 32233 Re: Atlantic Beach Country Club—Plan Revisions Permit#13-00003848 Dear Mr.Jones: At the request of the client, the following changes have been made to the above mentioned project. ARCHITECTUAL REVISIONS: 1. Revised office area to depict new area for multipurpose room (107). Added 2x12 wall to western side of space. Depicted retractable opening. 2. Change configuration of beams in tower as per meeting with Cliff Duch & Pete Rodrigues. Showed location of attic access panel in foyer/tower(100) for access to HVAC equipment(above). 3. Widened East/West dimensions of walls for vestibule(135, hall (136),women's private restroom (132), & FDC/Riser(131)to accommodated door clearances(doors CH2, CH3 &CH9)as per handicap code requirements. Moved positions of doors CH16&CH10 to meet handicap code requirements. 4. Revised women's handicap restroom (133A) to be depicted as a normal restroom. Added changing station& removed sink on North wall. 5. Mirrored layout of women's handicap restroom (137A) into men's handicap restroom (138A). Revised area to show vestibule (139A)& restroom foyer(139). Added doors CH19 &CH15 on East wall of restroom foyer(139). Reduced size of cased opening on West wall to 5'-0" x 8'-0". 6. Revised area to show shoe sine area (129). Removed window&added door CH3. Removed certain lockers in men's lockers(127). Revised golf pro shop &technical room to show general manager's office(125), merchandise storage(124) &golf pro shop (123). Stairs(122A) revised/added to access attic storage area (above). 7. Relocated common wall between hall (109)&table storage (110)to accommodate door CH39 to meet handicap code requirements. 8. Relocated doors CB3 &CB4 in vestibule (141) &vestibule (144)to accommodate handicap code requirements. 9. Relocated doors T3&T4 locations(men's tennis restroom (152) and women's tennis restroom (153))to meet handicap code requirements. 10. Revised attic area to show stair& landing (200), storage (201) storage (202) &security area (203). 11. Revised door and window schedules to reflect floor plan information. 9 b.,added single compartment sink. P2.1 1.Added S-1 and corresponding sanitary and vent piping 2. Moved wall clean-out 3. Handicap restroom (101) removed,as well as all fixtures and corresponding sanitary and vent piping 4. Lavatory L-1 and corresponding sanitary and vent piping removed 5. Relocated fixtures,WC-2 and L-2 for handicap restroom (138A) 6. Added mezzanine floor drains, sanitary piping and vent piping P2.2 1.Added sink S-1 and corresponding hot and cold water connections 2. Listed items removed: a. Handicap restroom (10)and associated hot and cold water b. Lavatory L-1 and associated hot and cold water piping 3. Relocated fixtures for handicap restroom (138A)and associated hot and cold water piping 4.Added TP-2 and piping for mezzanine floor drains 5. Relocated water heater and associated equipment and piping. P3.1 1. Riser diagram modified to reflect changes to 1/P2.1 restroom sanitary plan 2.Added mezzanine floor drains, sanitary piping and vent piping P3.4 1. Riser diagram modified to reflect the changes to 1/P2.2 restroom domestic water plan 2. Added TP-2 and piping for mezzanine floor drains These changes have been clouded and marked as Revision 1. Please feel free to contact me if there are any questions or comments. Respectfully, Clifford Duch, ICAA,A.I.A. Cronk Duch Architecture 904-302-9848 3 i I . 1 CRONK ,6U- DUCH ARCHITECTURE March 26, 2014 City of Atlantic Beach D (� TEL ,n Building Department L5 ] L 800 Seminole Rd. Atlantic Beach, FL 32233 MAR 2 8 2014 By Re: Atlantic Beach Country Club—Plan Revisions Permit#13-00003848 Dear Mr.Jones: At the request of the client,the following changes have been made to the above mentioned project. ARCHITECTUAL REVISIONS: 1. Revised office area to depict new area for multipurpose room (107). Added 2x12 wall to western side of space. Depicted retractable opening. 2. Change configuration of beams in tower as per meeting with Cliff Duch & Pete Rodrigues. Showed location of attic access panel in foyer/tower(100) for access to HVAC equipment(above). 3. Widened East/West dimensions of walls for vestibule (135, hall (136),women's private restroom (132), & FDC/Riser(131)to accommodated door clearances(doors CH2, CH3 &CH9) as per handicap code requirements. Moved positions of doors CH16&CH10 to meet handicap code requirements. 4. Revised women's handicap restroom (133A)to be depicted as a normal restroom. Added changing station & removed sink on North wall. 5. Mirrored layout of women's handicap restroom (137A) into men's handicap restroom (138A). Revised area to show vestibule (139A) & restroom foyer(139). Added doors CH19&CH15 on East wall of restroom foyer(139). Reduced size of cased opening on West wall to 5'-0"x 8'-0". 6. Revised area to show shoe sine area (129). Removed window&added door CH3. Removed certain lockers in men's lockers (127). Revised golf pro shop&technical room to show general manager's office (125), merchandise storage(124) &golf pro shop(123). Stairs (122A) revised/added to access attic storage area (above). 7. Relocated common wall between hall (109) &table storage (110)to accommodate door CH39 to meet handicap code requirements. 8. Relocated doors CB3 &CB4 in vestibule (141) &vestibule (144)to accommodate handicap code requirements. 9. Relocated doors T3 &T4 locations(men's tennis restroom (152)and women's tennis restroom (153))to meet handicap code requirements. 10. Revised attic area to show stair& landing(200), storage (201)storage (202) &security area (203). 11. Revised door and window schedules to reflect floor plan information. 1 12. Revised door/window assembly at golf pro shop (122). STRUCTURAL REVISIONS: 1. 1 steel beam, 2 steel columns, and two footings added to support roof at new large opening between Dining room and Multipurpose room. See sheets S1.1 and S1.2. 2. One section added (13/S4.2) to detail the added beam from above.See sheets S1.2 and S4.2. 3. One column and footing,which was in a wall that was removed to create the multipurpose room, was moved to the next wall to the North.See sheet S1.1. 4. The beam that increased in span due to the column from above moving was upsized. See Sheet S1.2. 5. Thickened slab footing added under stair walls at the South West end of the job. See sheet S1.1. MECHANICAL REVISIONS: M0.1 1. Outside airflow modified 2.AHU-3/HP-3 selection changed 3. EF-1 Selection changed M0.2 1.Ventilation calculation schedule for units 3, 6 and 7 were updated to reflect the floor plan changes 2.Added ventilation calculation schedule for new unit 9 M1.1 1.Galley(104) removed, air flow rebalanced for AHU-2 A 2.AHU-3 ductwork redone for multi-purpose room 3.AHU-7 ductwork changed to accommodate change to locker room's changes per floor plan 4. Relocated DSS-1 to security area (203) 5. AHU-6 ductwork changed for changes to pro-shop area 6. EF-1 and exhaust ductwork changed for new floor layout 7.Added AHU-9 and all ductwork and air devices for system 8.Added condensate drain notes M2.2 1. Changed condensate drain note 2. Deleted condensate drywall detail ELECTRICAL REVISIONS: E0.1 Rev 2:Added fixture type D2 E0.3 Rev 2: Revised panel schedules 'AC' and 'M.' E1.1 Rev 2: Revised power and fire alarm arrangement for floor plan changes associated with new Multipurpose Room,General Mgr and Pro Shop Offices, and Mezzanine E2.1 Rev 3: Revised lighting arrangement for floor plan changes associated with new Multipurpose Room,General Mgr and Pro Shop Offices, and Mezzanine PLUMBING REVISIONS: P0.1 1.Added S-1 to fixture schedule 2. Plumbing Fixture Demand Tabulation for both total project and Clubhouse altered as listed: a. removal of 1 water closet, 1 wall hung lavatory, 1 countertop lavatory and restroom floor drain. 2 b.added single compartment sink. P2.1 1.Added S-1 and corresponding sanitary and vent piping 2. Moved wall clean-out 3. Handicap restroom (101) removed,as well as all fixtures and corresponding sanitary and vent piping 4. Lavatory L-1 and corresponding sanitary and vent piping removed 5. Relocated fixtures,WC-2 and L-2 for handicap restroom (138A) 6.Added mezzanine floor drains, sanitary piping and vent piping P2.2 1.Added sink S-1 and corresponding hot and cold water connections 2. Listed items removed: a. Handicap restroom (10) and associated hot and cold water b. Lavatory L-1 and associated hot and cold water piping 3. Relocated fixtures for handicap restroom (138A)and associated hot and cold water piping 4.Added TP-2 and piping for mezzanine floor drains 5. Relocated water heater and associated equipment and piping. P3.1 1. Riser diagram modified to reflect changes to 1/P2.1 restroom sanitary plan 2.Added mezzanine floor drains, sanitary piping and vent piping P3.4 1. Riser diagram modified to reflect the changes to 1/P2.2 restroom domestic water plan 2.Added TP-2 and piping for mezzanine floor drains These changes have been clouded and marked as Revision 1. Please feel free to contact me if there are any questions or comments. 3 Respectf y, I14 Clifford ch, ICAA,A.I. Cronk Duch Architecture 904-302-9848 3