Loading...
1249 Beach Ave RES18-0133 Blower Door Test FormPermit t 1910 33 Blower Door Test Form Job Information Builder: CnrX C C W'4":C_�. –Tiv— Community: t44-/4,, C_ fr7 _ Lot #: Address: Unit #: j City, State, Zip: _-Hcu41.L an -ac t" t^ L 32- 3 Air Infiltration Test Results CFM(50) = �Co %3 Volume ACH(50) = CFM(50) X 60 / Volume = ...31? C_Pass ❑ Fail Passing results must be 7 ACH(50) or less Certification of Test Results 8402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2, 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure or 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7),F.S. or individuals licensed as set forth in Section 489.105(3)(f), (g), or (h) or an opproved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Authorized Third Pa I hereby certify the above results and that I hold the below certification: Class A or B A/C contractor or Mechanical contractor License No. CA COVI L4 Q9 RESNET approved HERS Rater or Residential Field Inspector Certification No. BPI approved Building Analyst or Energy Auditor Certification No. Professional Engineer License No. Mechanical venti do has ee dde : Yes 35 0i1 No Signature: A, Printed Name: r CS� �C.3 Tr Date: Revised 5/5/2017