Loading...
130 5th Street ERES19-0102 Early Power LetterfV - EARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH Electric power is requested now under the conditions and terms of this fully executed Agreement & Release Job Address: Permit No. E2 E5 Lt- Service Type (Circle One): Overhe Underground We, the undersigned General Contractor and Electrical Contractor, understand and agree: 1. "Early, Power" is purely for our construction convenience it is not required by Codes, and does not substitute nd as such ,sFinal t thInspections speed discreton f the BuO (Ceing Off aie ? Occupancy) that must be issued before occupancy, 2. iinspections must havee prior will make a ncluding meter base prior to power energizing. All rough 3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the early electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beach Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four hour notice. 4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before: a. Equipment, devices and fixtures are installed (or blanked off) safely. b. Panel is complete with breakers and cover, and (labeling required at final inspection). C. Service connection and grounding is complete. d. The electric system has safely passed thorough electrical check. e. Meter can is permanently marked with address. f. Temporary address numbers displayed (Permanent numbers are required for C/O). 5. This fully completed form is to be submitted to the Building Department by hand, mail or fax. 6. Future such Agreeipents will gpt be accepted from those who violate any one of the above items. DATE JiL PRINT NAN4E/_[ .Q(_U 1 ELECTRICAL CONTRACTOR DATE— `' " jo '`v PRINT NAME // G'� �T o! t�NGS� 800 Seminole Road, Atlantic Beach FL 32233 Phone: (904)247-5826 Fax (904)247-5845 littp://www.coab.us revised 06 02 16