Loading...
1883 BEACH AVE - ROOF20-0064 ON DECKS - ' "Y. Building Permit Application Updated 10/9/18 a.. ; City of Atlantic Beach Building Department **ALL INFORMATION —. 800 Seminole Road, Atlantic Beach, FL 32233 HIGHLIGHTED IN GRAY r it v� IS REQUIRED. Phone: (904) 247-5826 Email: Building-Dept@coab.us Job Address: f4'83 8E4C Ave_ Permit Number: �00 p- 20- (30G1. Legal Description /5 -O57 9-AS—A9E-& A) 47i.111.17K—8E 1 UN 11 Na 1.07 RE# /10(it,85 Od(d Valuation of Work(Replacement Cost)$ /al Heated/Cooled SF Al on-Heated/Cooled • Class of Work: ❑New ❑Addition ❑Alteration ")7Repair ❑Move ❑Demo ❑Pool ❑Window/Door • Use of existing/proposed structure(s): ❑Commercial NResidential • If an existing structure, is a fire sprinkler system installed?: ❑Yes ❑No • Will tree(s)be removed in association with proposed project? ❑Yes(must submit separate Tree Removal Permit) ❑No Describe in detail the type of work to be performed: /145714" f L?OB<Wfrregeknof/eJG oVEiQ 3 BI LINES REcoAisratcrEh 8t Z,7Ir • FL rsaa7.0„, Florida Product Approval# _ for multiple products use product approval form Property Owner Information Name S7UP4L7 K/#*1 4, Address /883 BE-ACI( Ilia City 472-MT/c .8Y4CI( State FL. Zip 3 233 Phone 7o2l 3)/3-.3t 'r E-Mail Owner or Agent(If Agent, Power of Attorney or Agency Letter Required) Contractor Information Name of Company CogAs--70.1 K&Fu,.J 4 CZ) /N C--, Qualifying Agent QAAILEc. R C, AS' l Address ltd Fc)(Nut1T 7RA7L City 5EI/n/7 3:,NdS State JL Zip 3 A,S1 Office Phone `do'/ 4.8'7-oA9' Job Site Contact Number ?C►Y '7O 7 3 =G'VV State Certification/Registration# cCGO$'aA1 E-Mail /J 4.7GR4s7C J G1-1,411....Cal Architect Name& Phone# Engineer's Name&Phone# rs en om sation Insurer FRS{ -31F OR Exempt ii Expiration Date 1/ /f a./ p ion i t b xo;ob ain a permit to do the work and installations as indicated. I certify that no work or installation has com'nn f f?T6r to ie a4440 of a permit and that all work will be performed to meet the standards of all the laws regulating construction`in-this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING,SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc. NOTICE: In addition to the requirements of this permitQC re I}i4'braptional restrictions applicable to this property that may be found in the public records of this county,and there may be additional permits required from other governmental entities such as water management districts,state agencies,or federal agencies. OWNER'S rAF 'Vterrtlflj tthat all the foregoing information is accurate and that all work will be done in compliance with all ippllcable.[aws r2gtiLati�ghpni€r(uction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LEND RORAN ATT. - NEY BE, • RE RECO' • III TICE COMMENCEMENT( ;/ (Signature of Owner or Agent) (Signature of Contractor) ned and swornnnto(or affirmed)before me this) 41 day of Signed and sworn to(or affirmed)before me this 1y,l.,day of Si , ato,a ,by /NA i@ 1 .62'4,54= QL660- , )62o , by ;• I .I - - ture ofl litsOY KAHA I '- ,tBtgt�rtlgtjc- of Florida 'o` ' "" Commission 9 GG 924046 1 is Notary Public-State of FloridaFloncla • ,� e; .,i Commission#GG 924046 I o.r,c7-.' My Comm.Expires Oct 20.2023 orr. My Comm.Expires Oct 20.2023 Bonded through National Notary Assn. [ ]Personally Known OR [ ]P rsonally Known OR Bonded through National Notary Assn. [Moduced Identificatio [ Produced Identification Type of Identification: 1-L Type of Identification: Ft'. DL APPLICATION INSTRUCTIONS IIII WATERPROOF SYSTEM PLI4DEK WATERPDECK COATING-PLYWOOD SUBSTRATES FL /5C.A'7. .. MATERIALS 2. All plywood substrates are recommended to 1. 2.5 Hot Dipped lbs/sq yd Galvanized be sloped 'A"per foot. Metal Lath (G90 is required in Inclement 3. Maximum deflection of the deck shall be Weather areas, refer to Technical less than L/360th of the span. Bulletin TB-110 Inclement Weather) 4. For additional application requirements in 2. Corrosion-resistant staples Inclement Weather areas, refer to 3. Pli-Dek Seam Paper Technical Bulletin TB-110. 4. GU80-1 Base Coat Powder(gray) 5. GU80-1 Top Coat Powder B. Plywood 6. GU80-1 Custom Top Coat 1. Plywood shall be a minimum of 16mm, 7. GU80-1 Liquid Admixture 5/8" (3/4" recommended) sound and dry, 8. GS88-1 Pigmented Sealer exposure 1 sheathing, and have a 9. Fiberglass Mat maximum span between supports of 10. PD Resin 410mm (16")on center. All plywood shall 11. GS13(Clear or Pigmented)or be securely fastened to the supports with PD Clear Sealer screws or ring shank nails spaced in accordance with APA guidelines and TOOLS Building Code requirements. 1. Variable Speed Drill (capable of 2. Framing or blocking must support all producing 1000 RPM's) plywood edges, except as per APA 2. Wind-lock B-M1 mixing blade or guidelines; blocking is not required when equivalent tongue and groove plywood is used. 3. Extension Cord 3. The plywood surface shall be clean, dry, 4. Clean 5 Gallon Plastic Containers and free of dirt, dust, oil, paint, or any 5. Measuring Bucket(1 gal, 2 gal, etc.) other contaminants that may impair 6. Hand Grinding Stone adhesion. 7. Level 4. All plywood seams shall be staggered, 8. Pencil and gapped 3.2mm (1/8"). All seams 9. Utility Knife shall be covered with a maximum of 10. Scissors 50mm (2") wide flashing paper tacked in 11. Masking Tape place. NOTE: If plywood is butted 12. 4"x 22" Pool Trowel tightly, the seams shall be saw cut to 13. Stainless Steel Trowel provide a 3.2mm (1/8") gap between 14. Margin Trowel sheets, except tongue & groove. Ensure 15. Small Paint Brushes that the tongue and groove section of the 16. Paint Roller(3/4"nap) plywood is installed so as to allow for 17. Extension Handle expansion. 18. Hopper Gun 5. All adjacent edges of the plywood sheets 19. Compressor(1-1/2 horsepower, electric shall not be more than 0.78mm (1/32") or better) out of plane (i.e. above or below each 20. Air Hose other). 21. Semi-stiff Broom 6. Plywood should be installed with a 22. Dust Mask 6.4mm/.3m (1/4") per linear foot slope. 23. Goggles Decks with parapet enclosures must be 24. Rubber or Cloth Gloves sloped to a drain or scupper. 25. Metal Spiked Golf Shoes 7. Any variation from the framing 26. Tin Snips specifications mentioned in section 1, 27. Hammer require written approval and system 28. Pneumatic Staple Gun recommendations from Pli-Dek Systems, 29. Hudson or Chapin Sprayer Inc. I. SUBSTRATE INSPECTION/PREPARATION C. Flashing *Refer to Pli-Dek Details A. General 1. Flashing shall be minimum 26 gauge, 1.Pli-Dek materials must be applied over galvanized, bonderized sheet metal. For sound dry exterior grade plywood decks. Inclement Weather areas, bonderized "Contact Pli-Dek Systems, Inc. for flashing is not recommended (refer to installation approvals over OSB substrates. Technical Bulletin TB-110 Inclement ® Pli-Dek Systems, Inc. Waterproof Deck Coating-Pli-Dek System 800.364.0287 Application Instructions PD-120 www.plidek.com Rev 05/19/2015 Page 1 of 6 .7 Weather). Insure ALL metal flashing is wiped 3. If auxiliary slope is required, slope mix clean with a solvent to insure oils are may be applied. (See Sloping Application completely removed from the Surface. Instructions SM-120 for complete details Dissimilar metals; such as Copper and and limitations). When this type of galvanized, should NEVER come in direct sloping will not accommodate the contact with each other. problem, then drains become a 2. Openings shall be flashed before installation necessity. of doors and sliders. NOTE: If doors or 4. Pli-Dek requires a galvanized or sliders have been installed without proper stainless steel drain as per Drain Detail, flashing, we recommend they be removed PD-24, on all plywood installations. and proper flashing installed. Please contact Pli-Dek for help in 3. All penetrations, including posts, or other acquiring these drains. Do not use objects that protrude through the deck shall plastic, cast iron, or shower drains. If be installed and flashed prior to applying the copper drains are used, please contact Pli-Dek materials. Pli-Dek for instructions on dissimilar 4. All decks with a parapet surround require a metals. scupper not less than 76mm (3")wide, and 5. The alternatives available for proper 100mm (4")high, spaced a maximum of drainage are the responsibility of the 3.65m(12')apart. Any scuppers or General Contractor. Contact Pli-Dek overflows shall be installed and flashed prior Systems, Inc. for complete details. to applying Pli-Dek materials. 6. Pli-Dek Systems, Inc and/or trained 5. All deck drains must be flanged, and applicator will not be held responsible for properly installed to a proper depth. NOTE: ponding water or the effects resulting Brass drains with a sheet metal flange are from sloping installation. recommended. Pli-Dek requires a galvanized or stainless steel drain as per II. MIXING INSTRUCTIONS Drain Detail, PD-24, on all plywood All Pli-Dek products should be stored in a installations. Please contact Pli-Dek for help cool dry place at the jobsite to avoid flash in acquiring these drains. Do not use plastic, drying in the bucket. cast iron, or shower drains. If copper drains are used, please contact Pli-Dek for A. Base Coat instructions on dissimilar metals. 1. Pour 3.8L (1 gallon) of GU80-1 Liquid 6. Gravel stops shall have a maximum ground Admixture into a clean 19L (5 gallon) dimension of 3/16". plastic container. 7. All flashing must be attached to the substrate 2. Add one 21kg (461b.) bag of GU80-1 with galvanized ring shank nails a minimum Base Coat (gray), and mix thoroughly for 25mm(1")length. 3 to 4 minutes. Use a Wind-lock B-M1 8. All flashing shall overlap adjacent pieces, a mixing blade, or equivalent, powered by minimum of 100mm(4"), and seams caulked a 13mm (1/2") variable speed drill, with a Vulkem 931 Urethane sealant or capable of producing 1000 RPMs. TIP: equivalent. In areas subject to extremely dry and/or 9. Deck/Wall interfaces must be flashed. hot climates, it may be necessary to add 10. All stairs must be flashed. water (up to .47L [1 pint] per mix). To 11. When copper flashing/drains are used, avoid flash drying, it may be necessary ensure that all galvanized metal; such as, to chill the GU80-1 Liquid Admixture nails, staples, lath,drains, etc. does not before mixing. A proper safety come into contact with copper(do not allow ventilation mask should be worn when any dissimilar metals to come in contact with working with all Pli-Dek products. each other).The contact of the two dissimilar metals will create rust and corrosion B. Screed Coat& Knockdown Texture Coating (electrolysis). **Contact Pli-Dek Systems, 1. Pour 4.75L (1.25 gallon) of GU80-1 Inc. for additional details and Liquid Admixture into a clean 19L (5 recommendations. gallon)plastic container. 12. See Pli-Dek Details for further written 2. Add one 21kg (461b.) bag of GU80-1 Top instructions. Contact Pli-Dek Systems, Inc Coat and mix thoroughly for 3 to 4 for written approval on flashing details that minutes. Use a Wind-lock B-M1 mixing vary or are not included in Pli-Dek Details. blade, or equivalent, powered by a D. Sloping 13mm (1/2") variable speed drill capable 1. It's the General Contractor's, his of producing 1000 RPMs. TIP: In areas representative's, or individual owner's subject to extremely dry and/or hot responsibility to assure adequate climates, it may be necessary to add drainage. water (up to .47L [1 pint] per mix). To 2. All plywood substrates are avoid flash drying, it may be necessary recommended to be sloped of 1/4" per to chill the GU80-1 Liquid Admixture, foot. before mixing. A proper safety 4 Pli-Dek Systems, Inc. Waterproof Deck Coating—Pli-Dek System 800.364.0287 Application Instructions PD-120 www.plidek.com Rev 05/19/2015 Page 2 of 6 i ventilation mask should be worn when DECK PLAN in the Pli-Dek Detail working with all Pli-Dek Products. Appendix.) 3. If colored cement is required, a Pli-Dek 4. Secure metal lath to plywood with a recommended tint pack may be added to minimum 22mm (7/8") crown by a the mix to achieve the desired color. minimum 16mm (5/8") long corrosion Note: ensure that all of the colorant is resistant staples spaced approximately dispersed out of the container. All mixes 11/2" on center around the perimeter and must be consistent (use the same mix on overlapped lath seams, and 75mm ratios) to maintain color consistency. (3") in the field (approximately 12 staples per square foot). C. Custom Top Coat 5. Additional staples spaced every 1'/2" on 1. Pour 4.75L (1.25 gallon) of GU80-1 center are required where the metal lath Liquid Admixture into a clean 19L (5 overlaps the seam paper, as installed in gallon)plastic container. Section I. 2. Add one 21kg (461b.) bag of GU80-1 Custom Top Coat and mix thoroughly for C. Base Coat Application 3 to 4 minutes. Use a Wind-lock B-M1 1. Mix the GU80-1 Base Coat as described mixing blade, or equivalent, powered by in Section II—A. a 13mm (1/2") variable speed drill 2. Pour the GU80-1 Base Coat over the capable of producing 1000 RPMs. TIP: metal lath and trowel, filling all voids at a In areas subject to extremely dry and/or rate of 25 - 30 square feet per mix. The hot climates, it may be necessary to add metal lath must be completely covered in water (up to .47L [1 pint] per mix). To the Base Coat. avoid flash drying, it may be necessary 3. Allow the GU80-1 Base Coat to dry for a to chill the GU80-1 Liquid Admixture minimum of 6 hours prior to applying the before mixing. A proper safety next application. If the base coat does ventilation mask should be worn when not cover the lath completely, a screed working with all Pli-Dek products. coat is required. 3. If colored cement is required, a Pli-Dek recommended tint pack may be added to D. Screed Coat Application the mix to achieve the desired color. 1. Screed coat may not be necessary in all Note: Ensure that all of the colorant is applications. Contact Pli-Dek Systems, dispersed out of the container. All mixes Inc. for application details and must be consistent (use the same mix recommendations. ratios) to maintain color consistency. 2. Prior to the screed coat application, remove any high or rough edges using a Ill. BASE&SCREED COAT hand grinding stone or scraper. 3. The deck must be free of all surface A. General contaminants, such as dust, dirt, etc., 1. Ensure that the exterior plywood surface which will impair the adhesion of the Pli- has been prepared in accordance with Dek GU80-1 Top Coat. Section I. 4. Mix the GU80-1 Top Coat as described 2. Ensure that all proper flashing is in place. in Section II—B. 3. Air temperature for application of the 5. Trowel a screed coat over the base coat Base Coat must be between 10°C (50°F) at a rate of 150 square feet per mix. and 43°C(110°F)and must remain so for Allow to dry for a minimum of 2 -6 hours. a minimum of 2 - 6 hours. Ensure humidity levels are low. Do not apply E. Pli-Dek—"F": Fiberglass& Resin over moisture. °°This application becomes required when job conditions may experience excessive B. Plywood Deck Preparation movement. Examples: cantilevered decks, 1. Lay out 2.5 hot dipped lbs per square large spanning decks, etc. Contact Pli-Dek yard Galvanized Metal Lath in a Systems, Inc. for written recommendations. staggered pattern over the entire Some geographic locations may require the plywood surface overlapping the metal Fiberglass and Resin Coating in ALL flashing, to the edge of the deck surface. applications. Contact Pli-Dek Systems, Inc for G90 galvanized metal lath is required in written verification. Inclement Weather areas (refer to 1. Air temperature for application of the PD Technical Bulletin TB-110 Inclement Resin and Fiberglass Coat must be Weather) between 10°C (50°F) and 43°C (110°F) 2. Overlap all edges of metal lath, a and must remain so in the acceptable minimum of 13mm (3/4"). range until the product has cured. 3. Offset metal lath edges a minimum of 2. Mix the PD Resin using a mechanical 150mm (6") from plywood seams. (See mixer at slow speed for approximately 1 minute. 4 Pli-Dek Systems, Inc. Waterproof Deck Coating—Pli-Dek System 800.364.0287 Application Instructions PD-120 www.plidek.com Rev 05/19/2015 Page 3 of 6 3. The deck must be free of all surface 4. Air temperature for application of the contaminants, such as dust. dirt, etc., GS88-1 Sealer must be between 13°C which will impair the adhesion of the PD (55°F) and 43°C (110°F) and must Resin. remain in acceptable range until the 4. Lay out the .75 oz fiberglass mat over product has fully cured. Ensure humidity entire deck surface extending to all levels are low. Do not apply over edges of the deck. Overlap mat seams a moisture. minimum of 1/4"to a maximum of 1/2". 8. The deck must be free of all surface 5. Apply the PD Resin over fiberglass mat, contaminants, such as dust, dirt, etc., at a rate of approximately 40 - 50 square which will impair adhesion of the GS88-1 feet per gallon with a trowel. Allow to Sealer. completely dry, usually 6 - 8 hours 9. Mix the GS88-1 Sealer thoroughly by depending on temperature. PD Resin mixing with the use of a mechanical must completely penetrate through the mixer. All containers should be boxed fiberglass mat. and stirred to ensure consistent coloring 6. After the PD Resin has cured, remove throughout. any loose areas, where fiberglass was 10. Apply the GS88-1 Sealer over the dry not bonded. and reapply PD Resin and Knockdown Coat, using a 19mm (3/4") Fiberglass as needed before application nap paint roller, suitable for latex type of Finish Coat. coatings at a rate of 100 square feet per gallon (2 coats may be necessary). IV. FINISH OPTIONS 11. To make cleaning easier in high traffic Prior to any finish coat installation the following areas, a coat of GS13 or PD Clear must be completed: Sealer may be applied over the dry 1. Remove any high or rough areas using GS88-1 Pigmented Sealer at a rate of hand grinding stone or scraper. Rough 200 square feet per gallon. (Surface will areas will affect the aesthetic become more slippery. Use of a non- appearance of the finished product. skid agent is recommended) 2. The deck must be free of all surface contaminants, such as dust, dirt, etc., B. ELASTOMERIC SAND FINISH which will impair the adhesion of the Pli- 1. Air temperature for application of the PD Dek material. Ensure humidity levels are Resin must be between 10°C (50°F) and low. Do not apply over moisture. 43°C (110°F), and must remain so for a minimum of 8 hours. Do not apply over A. KNOCKDOWN TEXTURE FINISH any moisture. 1. Air temperature for application of the 2. Apply a bead of manufacturer's Knockdown Texture Coating mixture recommended elastomeric joint sealant must be between 10°C (50°F) and 43°C at all wall-to-deck junctions, wood posts, (110°F) and must remain so in wrought iron posts, etc. acceptable range until the product has 3. Before application, mix PD Resin using a fully cured. mechanical mixer at slow speeds; mix 2. Mix the GU80-1 Top Coat as described thoroughly until a homogenous mixture in Section II—B. and color is obtained. Use care not to 3. Using a hopper gun, spray the allow the entrapment of air into the Knockdown Coating over the entire deck mixture. surface at a rate of 150—sq ft per mix. 4. Apply PD Resin over the entire deck CAUTION: AS WITH ANY SPRAY surface and flashing using a 3/4" nap MATERIAL, BE CERTAIN TO roller and a brush at a rate of 75 square PROTECT ALL SURROUNDING feet per gallon. Do not allow PD Resin to AREAS FROM OVER-SPRAY. puddle. 4. When the material begins to dry, 5. Broadcast aggregates of washed, dry, knockdown the material with a trowel. rounded, crystal silica sand, TIP: In order to eliminate footprints, we approximately 16 mesh at a rate of 100 suggest wearing metal spiked shoes lbs. per 100 square feet or until refusal (golf shoes)during this process. (depending on skid resistance 5. Allow the Knockdown Coating to dry a requirements) into the wet/uncured PD minimum of 2-6 hours. Resin. 6. Remove any sharp edges by scraping 6. Allow a minimum of 8 hours before the surface with a scraper or trowel. removing all excess silica sand. Ensure surface is free from dust and/or 5. Air temperature for application of the contaminates. GS88-1 Sealer must be between 13°C 7. Apply a bead of Pli-Dek's recommended (55°F) and 43°C (110°F) and must be elastomeric joint sealant at all wall-to- allowed to dry for a minimum of 8 hours. deck junctions, wood posts, wrought iron Ensure humidity levels are low. Do not posts, etc. apply over moisture. 4 Pli-Dek Systems, Inc. Waterproof Deck Coating—Pli-Dek System 800.364.0287 Application Instructions PD-120 www.plidek.com Rev 05/19/2015 Page 4 of 6 7. The deck must be free of all surface 3. Trowel a second coat of GU80-1 Gray contaminants, such as dust. dirt, etc., Base over the entire deck surface at a which will impair adhesion of the GS88-1 rate of 150 square feet per mix. While Sealer. the second coat is wet/uncured, 8. Mix the GS88-1 Sealer thoroughly by broadcast aggregates of washed, dry, boxing, stirring, or by using a mechanical rounded, crystal silica sand mixer. Box and mix all containers to approximately 16 mesh at a rate of ensure consistent coloring throughout. 100Ibs. per 100 square feet, or until 9. Apply the GS88-1 Sealer over the dry PD refusal (depending on skid resistance Resin and Sand Coat, using a 19mm requirements) ('/<") nap paint roller, suitable for latex 4. Allow drying for 6 hours before removing type coatings (2 coats may be all excess silica sand. A proper necessary.) ventilation mask should be worn at all 10. To make cleaning easier in high traffic time when working with Pli-Dek products. areas, a coat of GS13 or PD Clear 6. Air temperature for application of the Sealer may be applied over the dry GS88-1 Sealer must be between 13°C GS88-1 Pigmented Sealer at a rate of (55°F) and 43°C (110°F) and must 200 square feet per gallon. (Surface will remain dry for a minimum of 8 hours. become more slippery. Use of a non- Ensure humidity levels are low. Do not skid agent is recommended) apply over moisture. 5. The deck must be free of all surface C. Pli-Dek—"U": UNDERLAYMENT FOR contaminants, such as dust. dirt, etc., TILE OR CONCRETE FINISH which will impair adhesion of the GS88-1 Note: The vertical leg of all flashings should be Sealer. coated with Fiberglass and PD Resin. 6. Mix the GS88-1 Sealer thoroughly by 1. Air temperature for application of the PD mixing with the use of mechanical mixer. Resin must be between 10°C (50°F)and Box mix all containers to ensure 43°C (110°F), and must remain so for a consistent coloring throughout. minimum of 8 hours. Do not apply over 7. Apply the GS88-1 Sealer at a rate of 75- any moisture. 100 square feet per gallon depending on 2. Apply a bead of Pli-Dek's recommended thickness of Sand Coat, using a 19mm elastomeric joint sealant at all wall-to- (3/4") nap paint roller, suitable for latex deck junctions, wood posts, wrought iron type coatings (2 coats may be posts, etc. necessary). 3. The vertical leg of all flashings should be 8. To make cleaning easier in high traffic coated with Fiberglass and PD Resin. areas, a coat of GS13 or PD Clear 4. PD Resin should not be exposed to Sealer may be applied over the dry construction traffic. GS88-1 Pigmented Sealer at a rate of 5. Mix the Pli-Dek GU80-1 Top Coat as 200 square feet per gallon. Surface will described in II-A. become more slippery, use of a non — 6. Apply a screed coat of GU80-1 Top Coat skid agent is recommended. over the entire deck at a rate of 150 square feet per mix. Allow to dry for a E. POLYACRYLIC SMOOTH FINISH minimum of 2 - 6 hours. Mix the GU80-1 1. Air temperature for application of the Top Coat as described in Section II—B. Polyacrylic smooth finish must be 7. Allow a minimum of 8 hours prior to between 10°C (50°F) and 43°C (110°F) installing any finished product over the and must remain so for a minimum of 8 PD Resin and sand surface or screed hours. It may be necessary to grind the coat. rough ridges of the Base Coat to 8. *Optional: Broadcast aggregates of washed, minimize chatter lines. dry, rounded crystal silica sand, 2. Mix the GU80-1 Top Coat as described approximately 16 mesh, at a rate of 1001bs. in Section II—B. per 200 square feet. 3. Trowel a screed coat over the entire deck surface at a rate of 150 square feet D. POLYACRYLIC SAND FINISH per mix. Allow it to dry for a minimum of 1. Air temperature for application of the Pli- 6 hours. Dek C finish must be between 10°C 4. It may be necessary to apply an (50°F) and 43°C (110°F) and must additional coat of GU80-1 Custom Top remain in acceptable range until product Coat to create a smoother finish. has fully cured. Coverage rate should be approximately 2. Mix the GU80-1 Gray Base Coat as 200 square feet per mix. **Please note: described in Section II - A and add an Surface will not be perfectly smooth and additional 1/2 gallon of GU80-1 Liquid will have some imperfections/variations. Admixture. 5. Apply a bead of Pli-Dek recommended elastomeric joint sealant to all wall-to- 4 Pli-Dek Systems, Inc. Waterproof Deck Coating—Pli-Dek System 800.364.0287 Application Instructions PD-120 www.plidek.com Rev 05/19/2015 Page 5 of 6 deck junctions, wood posts, wrought iron 7. Trowel a tinted screed coat over the posts, etc. stenciled or taped deck surface at a rate 6. Air temperature for application of the of 150 square feet per mix. Allow to dry GS88-1 Sealer must be between 13°C for a minimum of 2 -6 hours. (55°F) and 43°C (110°F) and must 8. Apply desired stain/shading using a low remain dry for a minimum of 8 hours. pressure sprayer, soft broom, or sponge. Ensure humidity levels are low. Do not Contact Pli-Dek Systems, Inc. for apply over moisture. complete details. 7. Prior to color coat application, remove 9. Remove the stencil or tape pattern. any high or rough edges using a hand 10. The deck must be free of all surface grinding stone or scraper. contaminants, such as dust. dirt, etc., 8. The deck must be free of all surface which will impair adhesion of the GS13 contaminants, such as dust, dirt, etc., or PD Clear Sealer. which will impair adhesion of the GS88-1 11. Apply a coat of GS13 or PD Clear Sealer Sealer. at a rate of 200 square feet per gallon. 9. Mix the GS88-1 Sealer thoroughly by (2 coats may be necessary.) mixing with the use of a mechanical mixer. Box mix all containers to ensure H. Slip and Fall Precautions consistent coloring throughout. 1. OSHA, American Disabilities Act (ADA), and 10. Apply the GS88-1 Sealer using a 19mm The Federal Housing Act (FHA) have now (3/4") nap paint roller, suitable for latex set enforceable standards for slip-resistance type coatings, at a rate of 100 square on pedestrian surfaces. Pli-Dek Systems, feet per gallon (2 coats may be Inc. recommends the use of angular slip- necessary). resistant aggregate in all coatings or flooring 11. To make cleaning easier in high traffic systems that may be exposed to wet, areas, a coat of GS13 or PD Clear oily/greasy, or otherwise potentially slippery Sealer may be applied over the dry conditions. It is the end users responsibility GS88-1 Pigmented Sealer at a rate of to provide a flooring system that meets 200 square feet per gallon. (Surface will current safety standards. Pli-Dek Systems, become more slippery. Use of a non-skid Inc or its sales agents will not be responsible agent is recommended.) for injury incurred in a slip and fall accident. Please consult local building codes for the F. EPDXY STONE FINISH current coefficient of friction requirement. `Contact Pli-Dek Systems, Inc.for written instructions. Disclaimer Information contained in this specification G. CUSTOM FINISH: SIMULATED TILE, BRICK, conforms to standard detail and product AND STONE recommendations for the installation of the 1. Air temperature for application of the Pli-Dek products as of the date of publication Custom Finish must be between 10°C of this document and is presented in good (50°F) and 43°C (110°F) and must faith. Pli-Dek Systems, Inc. assumes no remain so for a minimum of 8 hours. liability, expressed or implied, as to the 2. Mix the GU80-1 Custom Top Coat as architecture, engineering or workmanship of described in Section II - C and add the any project. To insure that you are using the selected color tint pack to establish the latest, most complete information, contact desired grout color. Note: All mixes Pli-Dek Systems, Inc. at: must be consistent (use the same mix ratios) to maintain color consistency. 41610 Date St, Suite 104 3. The deck must be free of all surface Murrieta, CA 92562 contaminants, such as dust, dirt, etc., Tel.: (800) 364-0287 which will impair adhesion of the GU80-1 Website: www.plidek.com Custom Top Coat. 4. Trowel a tinted GU80-1 Top Coat over * The Trained Applicator indicates certain the entire deck surface at a rate of 150 employees of the company have been square feet per mix. Allow to dry for a instructed in the proper application of Pli-Dek minimum of 2 - 6 hours. (Decorative products and have received copies of the Pli- scroll lines can be achieved at this step Dek Application Instructions and prior to screed coat drying, as long as no Specifications. The Trained Contractor templates or tape are going to be used.) Program is not an apprenticeship. Each 5. Install one of the various types of stencil trained contractor is an independent patterns or install a tape pattern over the company and bears responsibility for its own cured screed coat to achieve the desired workmanship. Pli-Dek Systems Inc. finish. assumes no liability for the workmanship of a 6. Mix the GU80-1 Custom Top Coat as in trained contractor. Section II—C. ® Pli-Dek Systems, Inc. Waterproof Deck Coating—Pli-Dek System 800.364.0287 Application Instructions PD-120 www.plidek.com Rev 05/19/2015 Page 6 of 6 E 15"c;47.� ESICC Most Widely Accepted and Trusted EVALUATION SERVICE Innovation RESEARCH:..SS ICC-ES Evaluation Report ESR-2097 ICC-ES I (800) 423-6587 I (562) 699-0543 I www.icc-es.org Reissued 08/2017 This report is subject to renewal 08/2018. DIVISION: 07 00 00—THERMAL AND MOISTURE PROTECTION SECTION: 07 18 13—PEDESTRIAN TRAFFIC COATINGS REPORT HOLDER: PLI-DEK SYSTEMS, INC. 41610 DATE STREET, SUITE 104 MURRIETA, CALIFORNIA 92562 EVALUATION SUBJECT: PLI-DEK AND CON-DEK WALKING DECK AND ROOF COVERING SYSTEMS ICC ICC ICC PMG C LISTED Look for the trusted marks of Conformity! �\ "2014 Recipient of Prestigious Western States Seismic Policy Council IRS (WSSPC)Award in Excellence" A Subsidiary of CODE om i ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not ' SCCs • '°"'° specifically addressed, nor are they to be construed as an endorsement of the subject of the report or a ANSI recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as ACCREDITED SO/IEC 17085 to any finding or other matter in this report, or as to any product covered by the report. P,��1 C �r AGc Mne CC Copyright®2018 ICC Evaluation Service, LLC. All rights reserved. ES ,r,tuAfloti RVICE Tait Most Widely Accepted and Trusted ICC-ES Evaluation Report ESR-2097 Reissued August 2017 Revised February 2018 This report is subject to renewal August 2018. www.icc-es.orq I (800)423-6587 I (562) 699-0543 A Subsidiary of the International Code Council® DIVISION: 07 00 00—THERMAL AND MOISTURE of a plywood substrate covered with expanded metal lath; PROTECTION a polymer-modified cementitious base coat; an optional Section: 07 18 13—Pedestrian Traffic Coatings reinforcing fabric layer; and intermediate and sealer coats. See Section 4.0 and Tables 1 and 2 for recognized REPORT HOLDER: system configurations and corresponding component requirements. PLI-DEK SYSTEMS, INC. 3.1.1 Materials: 41610 DATE STREET, SUITE 104 MURRIETA, CALIFORNIA 92562 3.1.1.1 Substrate: Exterior-grade plywood must comply (800) 364-0287 with U.S. DOC PS-1 or PS-2 Minimum thickness is www.plidek.com specified in Tables 1 and 2 of this report. EVALUATION SUBJECT: 3.1.1.2 Metal Lath: Metal lath must be a minimum 2.5-pound-per-square-yard (1.36 kg/m2), hot-dipped PLI-DEK AND CON-DEK WALKING DECK AND ROOF galvanized lath, complying with ASTM C847. COVERING SYSTEMS 3.1.1.3 Staples: Staples must be No. 16 gage, 718-inch- crown (22.2 mm), /8-inch-long (15.9 mm), corrosion- 1.0 EVALUATION SCOPE resistant staples complying with ASTM F1667. Compliance with the following codes: 3.1.1.4 Pli-Dek GU-80-1 Gray Base: A proprietary ■ 2015, 2012, 2009, and 2006 International Building mixture of portland cement and silica sand packaged in Code®(IBC) 46-pound (20.9 kg) bags that is mixed on-site with the GU-80-1 Liquid Admix, at a ratio of 1 gallon (3.8 L) of ■ 2015, 2012, 2009 and 2006 International Residential Liquid Admix for each 46-pound (20.9 kg) bag of GU-80-1 Code®(IRC) Gray Base, in accordance with the manufacturer's • 2013 Abu Dhabi International Building Code(ADIBC)t instructions. The mixture is used as a component of the tThe ADIBC is based on the 2009 IBC.2009 IBC code sections referenced base coat and intermediate coat of Pli-Dek systems. in this report are the same sections in the ADIBC. 3.1.1.5 Pli-Dek GU-80-1 Top Coat: A proprietary mixture • Other Code (see Section 8.0.) of portland cement and silica sand packaged in Properties evaluated: 46-pound (20.9 kg) bags that is mixed on-site with the GU-80-1 Liquid Admix, at a ratio of 1.25 gallons (4.7 L) of • Durability GU-80-1 Liquid Admix for each 46-pound (20.9 kg) bag of • Wind resistance GU-80-1 Top Coat, in accordance with the manufacturer's instructions. The mixture is used as a component of the ■ Fire classification intermediate coat of Pli-Dek systems and as a component ■ Fire resistance of the third coat of the Con-Dek system. 2.0 USES 3.1.1.6 Pli-Dek GU-80-1 Custom Top Coat: A The Pli-Dek and Con-Dek systems are walking deck and proprietary mixture of portland cement and silica sand roof covering systems for use directly over plywood packaged in 46-pound (20.9 kg) bags that is mixed on-site (Pli-Dek) or concrete (Con-Dek) decks. The systems are with the GU-80-1 Liquid Admix, at a ratio of 1.25 gallons also used as components of one-hour fire-resistance- (4.7 L) of GU-80-1 Liquid Admix for each 46-pound rated roof assemblies as described in Section 4.4. The (20.9 kg) bag of GU-80-1 Custom Top Coat, in accordance systems provide a Class A or Class B roof covering fire with the manufacturer's instructions. The mixture is used classification as described in Tables 1, 1A and 2. as a component of the intermediate coat and third coat of 3.0 DESCRIPTION the Pli-Dek CF System and as a component of the third coat of the Con-Dek system. 3.1 Pli-Dek System: 3.1.1.7 Pli-Dek GU-80-1 Liquid Admix: A polyacrylic The Pli-Dek system is a polymer-modified, cementitious emulsion available in 5-gallon (18.9 L) containers, and walking deck and roof covering system that consists used as a component of the base coat and intermediate ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed,nor are they to be construed si co-- as an endorsement of the subject of the report or a recommendation for its use.There is no warranty by ICC Evaluation Service.LLC,express or implied,as to any finding or other matter in this report,or as to any product covered by the report. MN WM. Copyright©2018 ICC Evaluation Service,LLC. All rights reserved. Page 1 of 6 ESR-2097 I Most Widely Accepted and Trusted Page 2 of 6 coat of Pli-Dek systems and as a component of the third material that may prevent adhesion of the base coat. All coat of the Con-Dek system. substrate joints must be tongue-and-groove or be blocked 3.1.1.8 PD Epoxy: A two-part amide epoxy, either clear with nominally 2-by-4 wood members. All substrate joints or pigmented, packaged in 1-gallon (3.8 L) containers for must be gapped /8 inch (3.2 mm) and covered with on-site mixing in equal parts by volume. The workable time Pli Deck Seam Paper, which then must be tacked in place. of the epoxy mixture is 45 minutes, with curing in eight Seam paper ends must overlap a minimum of 2 inches hours at 75°F(23.8°C). The epoxy is used as a sealer coat (51 mm). All valleys, openings, parapets, walls, sliders, in the Pli-Dek T system. door thresholds, jambs, posts, scuppers, penetrations, fascia or adjuncts must be flashed with minimum No. 26 3.1.1.9 Pli-Dek GS-88-1: A proprietary water-based gage [0.019 inch (0.48 mm)] corrosion-resistant metal, and acrylic mixture available in 5-gallon (18.9 L) containers. caulked. Adequate drainage must be provided in Curing time is two hours at 75°F (23.8°C). The mixture is accordance with the applicable code. used as a sealer coat for both Pli-Dek and Con-Dek 4.2.2 Metal Lath: Metal lath must be laid out over the systems. entire substrate surface, with joints overlapping a minimum 3.1.1.10 Pli-Dek GS-99-1: A proprietary water-based of 3/4 inch (19.1 mm).The lath must overlap metal flashings acrylic mixture available in 5-gallon (18.9 L) containers. a minimum of 11/2 inches (38 mm). The lath must be The mixture is used as a sealer coat for both Pli-Dek and stapled in place with No. 16 gage, 5/8-inch-long-by-7/8-inch- Con-Dek systems. wide (15.9 mm by 22.2 mm), corrosion-resistant staples, 3.1.1.11 PD Resin: PD Resin is a liquid polymer bonding no less than twelve per square foot (129 per m2). The resin used as an optional coating for the Pli-Dek B and metal lath must be stapled together at the lath lap joints Pli-Dek U systems, and as the base and intermediate and where the lath overlaps the seam paper, with staples coats for the Con-Dek system, as noted in Table 1 of this not more than 2 inches(51 mm)apart. report. The resin is supplied in 5-gallon (18.9 L)containers. 4.2.3 Coating Application: One bag of GU-80-1 must be 3.1.1.12 Fiberglass Mat: The fiberglass mat must be a mixed with 1 gallon (3.8 L) of GU-80-1 Liquid Admix for multidirectional chopped strand mat weighing 0.75 ounce use as the base coat for the systems described in Tables 1 per square foot(0.23 kg/m2). and 2. This mixture must be applied at the coverage rate noted in Tables 1 and 2 and must be troweled into the 3.1.1.13 Pli-Dek Seam Paper: Pli-Dek Seam Paper is a metal lath in such a manner that all holes and voids are 2-inch-wide (51 mm), water-resistant, reinforced, asphalt- filled to full depth and none of the lath or staples is laminated Kraft paper material that is used to cover exposed. Under normal working conditions at an ambient plywood joints. air temperature of 70°F (21.1°C), finish coatings can be 3.1.1.14 Aggregate: Natural sand, pebble or crushed rock, applied within 24 hours of the base coat application. The intermediate coat and sealer coat must be applied over the ranging in size from ASTM El 1 No. 60 sieve up to, and base coat, in accordance with the schedule in Tables 1 including, 3/8 inch (9.5 mm). and 2 of this report. 3.2 Con-Dek System: An optional fiberglass and resin coating may be applied The Con-Dek system is a fiberglass fabric reinforced over the base coat of systems (contact Pli-Dek for cementitious walking deck and roof covering system that installations that require this application), as outlined in consists of a 0.75-ounce-per-square-foot (0.23 kg/m2) Footnote 2 of Table 1. The fiberglass mat must be laid over fiberglass mat, a liquid polymer resin, polymer-modified the deck with minimum and maximum overlaps of 1/4 and cementitious coats, and sealer coats applied directly to a 1/2 inch (6.4 and 12.7 mm), respectively, and extending to concrete substrate. See Sections 3.1.1 and 4.3.2 and the furthermost edge of the deck. PD Resin must then be Table 1A for system configuration and component applied over the mat at a rate of 1 gallon per 50 square requirements. feet(0.815 L/m2), and must be worked into the mat using a 1/2-inch (12.7 mm) nap roller or trowel. After the resin is 3.2.1 Materials: allowed to dry for a minimum of eight hours, the surface 3.2.1.1 Substrate: The concrete substrate must comply must be checked for any blemishes, air pockets, or with the applicable code and must have a minimum bubbles, and for any items than may have become compressive strength of 2500 psi (17238 kPa)[minimum of embedded. Areas containing such items must be cut out 24 MPa is required under ADIBC Appendix L, Section and filled with a fiberglass mat and PD Resin as described 5.1.1]. above. Pinholes, if found, must be sealed by applying PD Resin over the affected area at a rate of 1 gallon per 3.2.1.2 Other Components: The Con-Dek system 100 square feet (0.408 L/m2) until the pinholes are sealed. consists of components as described in Sections 3.1.1.5 The fiberglass and resin coating must cure for a minimum through 3.1.1.7, 3.1.1.9 through 3.1.1.12, and 3.1.1.14. of two to six hours before application of the other coats 4.0 INSTALLATION required in Tables 1 and 2. 4.1 General: The temperature range for application is a minimum of 50°F (10°C) and a maximum of 110°F (43°C), with ideal The Pli-Dek and the Con-Dek systems must be installed conditions being between 60°F (15.6°C)and 90°F (32.2°C) by applicators trained and approved by Pli-Dek Systems, in high humidity. The coatings must not be applied in moist Inc., in accordance with this report, the manufacturer's or inclement weather. Pot life and curing time vary with published installation instructions and the applicable code. temperature and humidity. At 70°F (21.1°C), the maximum The manufacturer's published installation instructions must working life is one hour. be available on the jobsite during installation. 4.2.4 Pli-Dek U-Underlayment for Ceramic Tile: The 4.2 Pli-Dek System: system must be applied in accordance with the schedule in 4.2.1 Preparation of Substrates: The plywood substrate Table 1 of this report. After curing for eight hours at 75°F must be installed in accordance with the applicable code, (23.8°C), the surface can be used as a backing for exterior and must be clean, dry and free from dirt and other foreign adhered veneer, such as ceramic tiles, applied in ESR-2097 I Most Widely Accepted and Trusted Page 3 of 6 accordance with the veneer manufacturer's instructions 4.4.2 Con-Dek System: When the Con-Dek system is and the applicable code. installed, as described in Section 4.3, over a concrete roof 4.2.5 Method of Repair: The damaged area must be with a one-hour fire-rated resistance per 2015 and 2012 IBC Table 721.1(3) [2009 and 2006 IBC Table 720.1 (3)], completely removed, including the base coat and lath. New the Con-Dek system will not change the rating of the metal lath must be stapled to the clean, dry substrate, and assembly. the system reapplied as described in Sections 4.2.1 through 4.2.4 of this report. If substrate damage occurs, 4.5 Roof Covering Fire Classification: the retention of the fire-resistance and strength properties 4.5.1 Pli-Dek System:When installation is in accordance of the system must be investigated. with this report,the assemblies have the fire classifications 4.3 Con-Dek System: noted in Tables 1 and 2. 4.3.1 Preparation of Substrate: Concrete substrates 4.5.2 Con-Dek System: When the Con-Dek system is must be designed and installed in accordance with the installed as described in Section 4.3 and Table 1A, at a requirements of the applicable code. The concrete surface maximum slope of 1/4 inch per foot (2 percent slope), the must be free of loose particles, fins, ridges, voids or air- system has a Class A roof classification. entrained holes, curing agents, bond breakers, oil, grease, 4.6 Wind Resistance: dust or any foreign matter which would prevent bonding. Control and expansion joints must be installed at stress The wind uplift resistance of the Pli-Dek and Con-Dek concentration points to control cracking. The concrete walking deck and roof covering systems is limited to the surface to receive coatings must be roughened by wind uplift capacity of the roof deck construction on which water/sand/bead/shot blasting, etching or grinding in the system is installed. accordance with the manufacturer's published installation 5.0 CONDITIONS OF USE instructions. The Pli-Dek and Con-Dek Walking Deck and Roof The concrete surface must be sloped to a minimum of Covering Systems described in this report comply with, or 1/4:12 for proper drainage in accordance with the are suitable alternatives to what is specified in, those requirements of the applicable code. The concrete surface codes listed in Section 1.0 of this report, subject to the must be properly cured prior to installation. Flashing must following conditions: be provided in accordance with the applicable code. 5.1 The systems must be installed by applicators 4.3.2 Con-Dek Application: The fiberglass mat must be trained and approved by Pli-Dek Systems, Inc., in laid over the substrate with minimum and maximum accordance with this report, the manufacturer's overlaps of/4 and 1/2 inch (6.4 and 12.7 mm), respectively, published installation instructions and the applicable and extend to the furthermost edge of the deck. PD Resin code. If there is a conflict between the manufacturer's must then be applied over the mat at a rate of 50 square published installation instructions and this report, this feet per gallon (1.23 m2/L), and must be worked into the report governs. mat using a 1/2-inch (12.7 mm) nap roller or trowel. After 5.2 Installation of the Pli-Dek systems must be limited to the resin is allowed to dry for a minimum of eight hours,the use in areas where the wind speed does not exceed surface is inspected and prepared for a second coat of PD what is specified in Section 4.6.1.The plywood and its Resin at a rate of approximately 100 square feet per gallon attachment to support framing must be adequate to (2.46 m2/L). The fiberglass and resin coating must cure for resist the required wind load. a minimum of two to six hours before application of the third and sealer coats noted in Table 1A. 5.3 The roof deck on which the Pli-Dek system is installed must be designed to resist the design wind pressures The desired third coat (GU-80-1 Top Coat or Custom of the applicable code. Coat mixed with the GU-80-1 Liquid Admix)is applied, and the finished product is sealed with either the GS-88-1 or 5.4 The roof deck on which the Con-Dek system is GS-99-1. installed must be designed to resist the design wind pressures of the applicable code. The temperature range for application is a minimum of 50°(10°C) and a maximum of 110°F (43°C), with ideal 5.5 The products are manufactured for Pli-Dek Systems, conditions being between 60°F(15.6°C)and 90°F(32.2°C) Inc. at manufacturing locations identified in the in high humidity.The coatings must not be applied in moist approved quality manual, under a quality-control or inclement weather. Pot life and curing time vary with program with inspections by ICC-ES. temperature and humidity. At 70°F (21.1°C), the maximum 6.0 EVIDENCE SUBMITTED working life is one hour. 6.1 Data in accordance with the ICC-ES Acceptance 4.4 One-hour Fire-resistance-rated Construction: Criteria for Walking Decks (AC39), dated October 4.4.1 Pli-Dek System: Pli-Dek systems identified in Table 2013(editorially revised December 2016). 1, having a minimum base coat thickness of 3/16 inch 6.2 Report of small-scale fire tests in accordance with (4.8 mm) and installed in accordance with this report over ASTM E119. /8-inch-thick (15.9 mm) exterior-grade plywood, with 7.0 IDENTIFICATION minimum 2-by-8 solid sawn lumber joists spaced at 16 inches (406 mm)on center, and with all substrate joints Each component container is identified with a permanent blocked, or tongue-and-groove exterior-grade plywood, label bearing the report holder's name (Pli-Dek Systems, may be substituted for the double wood floor described in Inc.)and address,the product designation, the lot number, Item 13 of 2015 and 2012 IBC Table 721.1(3) [2009 and and the evaluation report number (ESR-2097). The label 2006 IBC Table 720.1(3)]. When installation is over 2-by-8 includes the one-year shelf life and the date of joists, the design bending stress assigned to the joists manufacture. Rolls of Pli-Dek Seam Paper are identified must be limited to 78 percent of the code-prescribed with the product name (PD Seam Paper) and the Pli-Dek design values. Systems, Inc. name. ESR-2097 I Most Widely Accepted and Trusted Page 4 of 6 8.0 OTHER CODES 3/16 inch (4.8 mm) and installed in accordance with this In addition to the codes referenced in Section 1.0, the report over 5/8-inch-thick (15.9 mm) exterior-grade products described in this report were evaluated for plywood, with minimum 2-by-8 solid sawn lumber joists compliance with the requirements of the 1997 Uniform spaced at 16 inches (406 mm) on center, and with all Building Code" (UBC). The products comply with the substrate joints blocked, or tongue-and-groove exterior- (UBC) as described in Sections 2.0 through 7.0, but with grade plywood, may be substituted for the double revisions to Sections 3.1.1.1,4.4.1 and 6.2 as follows: wood floor described in Assembly 13 of UBC Table 7-C. When installation is over 2-by-8 joists, the design • 3.1.1.1 Substrate: Exterior-grade plywood must comply bending stress assigned to the joists must be limited to with UBC Standard 23-2 or 23-3. Minimum thickness is 78 percent of the code-prescribed design values. specified in Tables 1 and 2 of this report. • 6.2 Report of small-scale fire tests in accordance with • 4.4.1 Pli-Dek System: Pli-Dek systems identified in UBC Standard 7-1. Table 1, having a minimum base-coat thickness of TABLE 1—PLI-DEK CLASS A WALKING DECK AND ROOF COVERING SYSTEMS12 3 MAXIMUM MINIMUM SYSTEM SUBSTRATE4 DECK BASE COAT INTERMEDIATE THIRD COAT SEALER COAT BASE COAT SLOPE COAT THICKNESS (inch) 5 GU-80-1 Gray Base GU-80-1 Top Pli-Dek K— /8-inch-thick 1/4.12 applied at 30 sq.ft. per Coat applied at — GS-88-1 applied at 3/6 Knock Down plywood bag mixture 100 sq.ft.per 100 sq.ft.per gal. bag mixture s GU-80-1 Gray Base GU-80-1 Top Pli-Dek S— /8-inch-thick 1 Coat applied at GS-88-1 applied at Smooth plywood /4:12 applied at 30 sq.ft. per — /16 p bag mixture 110 sq.ft.per 100 sq.ft.per gal. bag mixture GU-80-1 Gray Base applied at 100 sq.ft.per Pli-Dek C— sinch-thick GU-80-1 Gray Base bag mixture;with GS-88-1 applied at Polyacrylic /6 1/4:12 applied at 30 sq.ft. per No. 16 silica sand — / Sand plywood bag mixture broadcast over 100 sq.ft.per gal. 6 the entire area at 100 lbs.per 300 sq.ft. GU-80-1 Custom GU-80-1 s GU-80-1 Gray Base Custom Top Pli-Dek CF— /8-inch-thick 1 Top Coat applied GS-99-1 applied at Custom Finish plywood /4:12 applied at 30 sq.ft. per Coat applied at /t6 p bag mixture at 120 sq.ft.per 150 sq.ft.per 200 sq.ft. per gal. bag mixture bag mixture PD Resin applied at 75 sq.ft.per s GU-80-1 Gray Base gallon;with No. Pli-Dek B— /8-inch-thick /4:12 applied at 30 sq.ft. per _ 16 silica sand GS-88-1 applied at /6 Sand Finish plywood bag mixture broadcast over 100 sq.ft. per gal. the entire area at 100 lbs. per 300 sq.ft. Pli-Dek U— 5/8-inch-thick GU-80-1 Gray Base PD Resin applied Underiayment plywood /4:12 applied at 30 sq.ft. per at 100 sq.ft.per — — 3/16 for Ceramic Tile bag mixture gal. For SI: 1 inch=25.4 mm, 1 ft2=0.0920 m2, 1 gallon=3.785 L, 1 pound=0.45 kg. 'When applied over 1/2-inch-thick plywood at any slope,systems provide a Class B roof covering fire classification. 'Optional fiberglass mat and resin coating may be applied over the base coat as described in Section 4.2.3 of this report. 'Minimum slope is 1/4:12. 4Substrate thickness is minimum thickness. ESR-2097 I Most Widely Accepted and Trusted Page 5 of 6 TABLE 1A--CON-DEK CLASS A WALKING DECK AND ROOF COVERING SYSTEM' MAXIMUM INTERMEDIATE SYSTEM SUBSTRATE DECK BASE COAT COAT THIRD COAT SEALER COAT SLOPE GU-80-1 Top Coat applied at GS-88-1 applied at PD Resin applied to PD Resin applied 175 sq.ft.per bag Con-Dek System Concrete2 1/4:12 %-oz.fiberglass mat at a at 100 sq.ft. mixture or 100 sq.ft.per gal.or rate of 50 sq.ft per gal per gal. Custom Top Coat GS-99-1 applied at applied at 175 sq.ft. 200 sq.ft.per gal. per bag mixture For SI: 1 inch=25.4 mm, 1 ft2=0.0920 m2, 1 gallon=3.7851. 'Minimum slope is 1/4:12. 2Concrete substrate must comply with the applicable code and have a minimum compressive strength of 2500 psi(17238 kPa)[minimum of 25 MPa is required under ADIBC Appendix L,Section 5.1.1]. TABLE 2—PLI-DEK CLASS B WALKING DECK AND ROOF COVERING SYSTEM' MAXIMUM BMINIMUM SYSTEM SUBSTRATE DECK BASE COAT INTERMEDIATE COAT SEALER COAT THICKNESS, ECOAT SLOPE (inch) GU-80-1 Gray 3/4 gallon of PD Epoxy PLI-DEK T—Troweled 1/2-inch-thick Base applied at PD Resin applied at thoroughly mixed with 100 lbs. 3 Pebbles and Epoxy plywood 5:12 35 sq.ft.per bag 80 sq.ft.per gal. of selected aggregate and /16 mixture troweled over a 30-square-foot area For SI: 1 inch=25.4 mm, 1 ft2=0.0920 m2, 1 gallon=3.785 L,1 pound=0.45 kg. 'Minimum slope is 1/4:12. 2Aggregate is specified in Section 3.1.1.14 of this report. 'Substrate thickness is minimum thickness. EsI EVALUATION SERVICE (.1.1.7=!t" Most Widely Accepted and Trusted ICC-ES Evaluation Report ESR-2097 FBC Supplement Reissued August 2017 Revised February 2018 This report is subject to renewal August 2018. www.icc-es.orq I (800)423-6587 I (562) 699-0543 A Subsidiary of the International Code Council® DIVISION: 07 00 00—THERMAL AND MOISTURE PROTECTION Section: 07 18 13—Pedestrian Traffic Coatings REPORT HOLDER: PLI-DEK SYSTEMS, INC. 41610 DATE STREET, SUITE 104 MURRIETA, CALIFORNIA 92562 (800) 364-0287 www.p1idek.corn EVALUATION SUBJECT: PLI-DEK AND CON-DEK WALKING DECK AND ROOF COVERING SYSTEMS 1.0 REPORT PURPOSE AND SCOPE Purpose: The purpose of this evaluation report supplement is to indicate that the Pli-Dek and Con-Dek Walking Deck and Roof Covering Systems, recognized in ICC-ES master evaluation report ESR-2097, have also been evaluated for compliance with the codes noted below. Applicable code editions: • 2017 Florida Building Code—Building • 2017 Florida Building Code—Residential 2.0 CONCLUSIONS The Pli-Dek and Con-Dek Walking Deck and Roof Covering Systems, described in Sections 2.0 through 7.0 of the master evaluation report, ESR-2097, comply with the Florida Building Code—Building and the Florida Building Code—Residential, provided the design and installation are in accordance with the 2015 International Building Code® (IBC) provisions noted in the master report: Use of the Pli-Dek and Con-Dek Walking Deck and Roof Covering Systems for compliance with the High-Velocity Hurricane Zone provisions of the Florida Building Code—Building and the Florida Building Code—Residential has not been evaluated, and is outside the scope of this supplemental report. For products falling under Florida Rule 9N-3, verification that the report holder's quality assurance program is audited by a quality assurance entity approved by the Florida Building Commission for the type of inspections being conducted is the responsibility of an approved validation entity (or the code official, when the report holder does not possess an approval by the Commission). This supplement expires concurrently with the master report, reissued August 2017 and revised February 2018. ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed,nor are they to be construed ,. icc as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service.LLC,express or implied,as -. � to anyfindingor other matter in this re - port,or as to any product covered by the report. rmiauiv Copyright©2018 ICC Evaluation Service,LLC. All rights reserved. Page 6 of 6