Loading...
765 Plaza ROOF20-0067 Mod Bit RoofOWNER:ADDRESS:CITY:STATE:ZIP: FORNEY RALPH J 765 PLAZA ATLANTIC BEACH FL 32233-3907 COMPANY:ADDRESS:CITY:STATE:ZIP: PROGRESSIVE BUILDERS dba PROGRESSIVE ROOFING AND REMODEL P O BOX 160 BUNNELL FL 32110 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 171119 0000 ROYAL PALMS UNIT 01 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 765 PLAZA ROOF NON SHINGLE MODOFIED BIT ROOF $0.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 455-0000-322-1000 0 $55.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $27.50 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL: $86.50 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 11/9/2020 PERMIT NUMBER ROOF20-0067 ISSUED: 11/9/2020 EXPIRES: 5/8/2021 ROOF NON SHINGLE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 2 of 2Issued Date: 11/9/2020 PERMIT NUMBER ROOF20-0067 ISSUED: 11/9/2020 EXPIRES: 5/8/2021 ROOF NON SHINGLE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 DESCRIPTION ACCOUNT QTY PAID PermitTRAK $86.50 ROOF20-0067 Address: 765 PLAZA APN: 171119 0000 $86.50 BUILDING $55.00 BUILDING PERMIT 455-0000-322-1000 0 $55.00 BUILDING PLAN REVIEW $27.50 BUILDING PLAN CHECK 455-0000-322-1001 0 $27.50 STATE SURCHARGES $4.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R14066 $86.50 Printed: Monday, November 9, 2020 1:15 PM Date Paid: Monday, November 09, 2020 Paid By: PROGRESSIVE BUILDERS dba PROGRESSIVE ROOFING AND REMODEL Pay Method: CREDIT CARD 393622567 1 of 1 Cashier: CG Cash Register Receipt City of Atlantic Beach Receipt Number R14066 ~+; CENTRALSQUARE ROOF20-0067 Certain1~-~g Technical Product Data Product Information Technical Data Product Application FLINTLASTIC ® FR CAP 30 T MINERAL SURFACED, FIRE RESISTANT, SBS MODIFIED BITUMEN FIBER GLASS CAP SHEET Product Use: FLINTLASTIC FR Cap 30 Tis a fire rated, glass mat cap sheet used iM two-ply or multi-layer modified bitumen fire rated roofing systems. It is designed for use as a cap sheet in built-up roofing systems. It may also be used as a heavy-duty, venting type base sheet when installed mineral side down and either mechanically fastened or spot mopped over lightweight insulating concrete decks or existing smooth surfaced membranes. FLINTLASTIC FR Cap 30 T is suitable for both new construction and reroofing membranes over a variety of substrates. It is surfaced with ceramic granules to provide a durable, heat reflective weathering surface when used as a cap sheet. FLINTLASTIC FR Cap 30 Tis reinforced wlth a tough fibrous glass fabric. Limitations: FLINTLASTIC FR Cap 30 T is intended for torch application. Rolls should be stored upright. off ground, completely protected from the weather . Roof decks shall be structurally sound, dry, smooth and meet or exceed minimum requirements of the deck manufacturer, local code and CertainTeed . Additional specifications and precautions are contained in the CertainTeed Commercial Roof Systems Manual. Product Composition and Featnres: FU NTLASTIC FR Cap 30 T is reinforced with a durable, high quality fiber glass mat which receives a heavy coating of weathering grade rubberized asphalt. FLINTLASTIC FR Cap 30 T is manufactured on state-of-the-art, dedicated roofing lines that were exclusively designed for the production of modified bitumen roofing membrane. Rall Dimensions: Coverage: Approximate We ight: Top Surfa ce: Back Surface: 39¾' X 32' 10' One square 100 lbs. per roll Ceramic granules Torchable polyester film Applicable Standards: Meets ASTM D6163, Grade G, Type I. FLINT LASTIC FR CAP 30 T is approved by Underwriters Laboratories for use in va rious Class A, 8, and C roof assemblies, ICC (pending), Factory Mutual, Miami-Dade, Florida Building Code Statewide Approval (FL 2533) and Texas Department of Insurance (RC-47). ~L: J5 33 -1<.l \ Modified Bitnmen Coating: Non-oxidized (flux) asphalt, blended with a compatible elastomeric styrene-butadiene-styrene polymer and selected inert fillers. Test Descrigtion Test Method Softening Point: ASTM D36 Tensile Strength: ASTM D5147 Elongation: Dimensional Stability: Lo w Temperature Flex: Compound Stability: Thickness: Tear Strength: @ 73.4 +J_ 3.6°F MD/XO @ 0 +/. 3.6°F MD/XO ASTM D5147 @ 73.4 +/_ 3.6°F MD/XO @ 0 +/_ 3 .6°F MD/XD ASTM D5147 MD/XO ASTM D5147 ASTM D5147 ASTM D5147 ASTM D5147 @ 73.4 +/_ 3.6°F MD/XD Results" 260°F 85/60 lbs.tin . 140/90 lbs.tin. 4%/4% 5%/5% 0.1/0.1 Max Pass@ -20°F 250°F 4.0mm (160 mils) 100/135 lbs. *NOTE: Published res ul ts are nominal pro ducti on values confirmed by independent laboratory testing. FLINTLASTIC FR Cap 30 T roof systems must be applied in accordance with installation procedures contained in the CertainTeed Commercial Roof Systems Manual. The following information is intended for general information purposes only and is not all-inclusive. Preparation : Substrates to receive a roof system shall be firmly attached , smooth, dry, clean and free of depressions and sharp projections. Substrates requiring priming shall be primed with Product Application ( continued) Warranties Technical Assistance and Services Caution: Fire Hazard asphalt pr im er such as FlintPrime~ and be allowed to complete ly dry. Substrates shall provide positive drainage. Roof insulation shall be tapered to drains. Installation: Unless otherwise specified by CertainTeed, a CertainTeed approved base sheet shal l be installed with 3' sidelaps and 4 ' endlaps, with endlaps diagonally staggered not less than 3 feet apart. The base sheet shall be mechanically fastened to nailable substrates, and torched or mopped to non-nailable or insulated substrates as specified in the CertainTeed Commercial Roof Systems Specification Manual. Over the base ply, torch one ply of FLINTLASTIC FR Cap 30 T lapping 3' on sides and 6' on ends with end laps diagonally staggered not less than 3 feet apart. Sides arnd endlaps shall be i nspected to ensu re an approximately 1Al ' flow of modified compound has been achieved. Note that torching SBS is very different than torching APP. The key point is to make the backside of the SBS memb rane just shiny. At that stage, the SBS modified compound is softened sufficiently to adhere aggressively. If the SBS modified asphalt shows signs of f low, the materia l has been overheated. Refer to the CertainTeed Commercial Roof Systems Manua l for additional speci fications. Precautions: Cold weather applications requi re special handling to prevent damage to the rolls and to ensure satisfactory installation. Do not apply roofing systems over improperly prepared substrates or substrates which contain moisture. Follow all safety recommendations relating to the use and maintenance of liquid propane gas torches and equipment. Refer to the CertainTeed Commercia l Roof Systems Manual for additional safety information. Maintenance: CertainTeed Commercial Roof Systems do not require any additional maintenance beyond normal roof maintenance procedures. CertainTeed recommends regular roof maintenance and inspection to determine the condition of drains, flashings and other similar items, and to prolong the life expectancy of th e roof system. CertainTeed offers a n umber of different types of Roof Membrane Warranties desig ned to meet the building owner's specific req uirements. Please con tact your nearest CertainTeed office for additional information and requirements. CertainTeed provides technical assistance in the design, selection , specification and application guidelines of FLINTLASTIC Roof Systems. Architectural and field representatives are availab le for consultation within ea ch region. For more information , contact CertalnTeed's Tec hnici;II Support at 800-396-8134 x2 . Torch down application of this product may create a risk of FI RE, including SMOLDERING FIRES. The roofing applicator is solely responsible for ensuring and enforcing safe and proper application of CertainTeed products by competent and qualified personnel. Only properly trained roofing professionals are authorized to install this product. Never apply flame directly to combustible materials or al low t he f lame to enter into hTdden or protected areas that may contain combustible materials. Follow all local code requirements. Have a Class A-B-C fire extinguisher available to each applicator. Thoroughly inspect the Job site whenever torching equipment has been used . Be certain that all chances of a f ire have been eliminated. Refer to the CertainTeed Commercial Roof Systems Manual, Midwestern Roofing Contractors Association (MRCA) GERTA program, National LP Gas Association, National Roofing Contractors Association (NRCA), Natio nal Fire Protection Association (NFPA), and Asphalt Roofing Manufacturers Association (ARMA) for further information and safety recommendat ions. ASK ABOUT ALL OF OUR OTHER CERTAINTEED® PRODUCTS AND SYSTEMS: CertalnTeed Corporation P.O. Box 860 Valley Forge, PA 19482 ROOFING • SIDING • T RIM • DECKING • RAILING • FENCE • FOUNDAT IONS GYPSUM • CEILINGS • INSULATION • PIPE www.certalnteed.com http://blog .certainteed.com ~ SAJNT·GOBAIN Professional: 800-233-8990 Consumer: 800-782-8777 o 0 7h 2 CenalnTeed OOrpor ation. Prtnted In 1he U.S.A. Code No. COMM,176 APP Torch Applied Roofing Systems This section contains the following: Specification Listing Specification Plates with Material Requirements and Eligible Guarantees Installation Requirements Page Part 1-7 General Installation Requirements ...................... 48 Part 8 Membrane System Installation ........................ 234 Part 9 Flashing ................................•....•.. 239 Part 1 O Surfacing ........••............................. 243 Part 11 Cold Weather Application Precautions .......•........... 244 Note: See MB Flashing Details following this section . APP Torch Applied Systems 210 GAFMC APP MODIFIED BITUMEN ROOFING SYSTEMS KEY TO SPECIFICATION NUMBERS Substrate N NN I A Nailable Non -nailable In sulated Recover over existing roof . May include additional insulation I Surfacing (If applicable) C Coating G Flood Coat and Gravel 1-1 -1 -1 I TSC 'I Number of Base Plies O None 1 One Ply 2 Two Plies 3 Three Plies Base plies can include: GAFGLA~ St rataven t'9 Eliminator"' Nailable, GAFGLA~ #75 Base Sheet, GAFGLA~ #80 Ultima'" Base Sheet, GAFGLAS-FlexPly"' 6 and GAFGLAse Ply 4. ~ I Top Ply of RUBEROID-Membranes TG RUBEAOIIYTorch (Granule) TS RUBEAOIIYTorch (Smooth) TGFAEC EnergyCap"' Torch FR TGPFA AUBEROIIYTorch FR TGPFAEC EnergyCapm Torch Plus FR SA RUBERO!~ SA or llberty"' Base/Ply Dnsert "SA/' prior to top sheet designation (i.e. l-0-2-SA/TG)] Number of Plies of RUBEROID-Membranes 1 2 One Ply Two Plies North Zone Includes Alaska West Zone Includes Hawaii South Zone Incl udes Puerto Rico Note: The West Zone comprises low elevation regions only . Mountainou s areas in the South and West Zones should comply with North Zone specttications. APP Torch Appfied Systems 211 AP P TO R C H AP P L I E D RO O F I N G SY S T E M CO N F I G U R A T I O N S 10 YR OI A M O N O PL E O G E AN O SY S T E M Pl . E D G E GU A R A N T E E SP E C I F I C A T T O N S P A G E # ~ NO , PL I E S ~ BO T T O M SH E E T A TT A C HM E N T 21 6 IN SU L A T I ON 2 l + H S MO P TO 'P E R L I T E MO P TO PE R L I T E SC R E W S & PL A T E S SC R E W S & PL A T E S 22 2 NO N - N A I L A B L E 1 NN - 0 - H S TO R C H 22 3 2 NN -1 - H S MO P MO P 22 4 NA I L A B L E 2 N- 1 - H S NA I L NA I L NA i l 22 8 LI G H T W E I G H T • 2 N- 1 -1 -T S FA S T E N E R CO N C R E T E 12 YR DI A M O N D PL E D G E AN O SY S T E M PL E D G E GU A R A N T E E SP E C I F / C A TT O N S fA G f . ! M C K NO , eu E s ru C J t BO T T O M SH E E T AT T A C H M E N T 21 6 IN S U L A T I O N 2 I- 1 - 1 - T G MO P TO PE R U T E MO P TO PE R L I T E SC R E W S & PL A T E S SC R E W S & PL A T E S l > 21 6 2 I- 1 - H G F R E C MO P T O PE R L I T E - 0 MO P TO PE R L I T E - 0 - , SC R E W S & PL A T E S 0 ~ SC R E W S & PL A T E S =r l > 21 6 2 l- 1 - 1 - T S C MO P TO PE R L I T E ' O ' O MO P TO PE R L I T E ~ 0 . SC R E W S & PL A T E S u , SC R E W S & PL A T E S ' < "' .; ; 22 2 NO N - N A I L A B L E N N- 0 - 1 - T G TO R C H ~ 22 2 1 NN - 0 - H G F R E C TO R C H .. . . , 22 2 1 NN - 0 - H S C TO R C H N 22 3 2 NN - 1 - H G MO P MO P 22 - 3 2 NN - 1 - 1 - T G F R E C MO P MO P 22 3 2 NN - 1 - 1 - T S C MO P MO P 22 4 NA I L A B L E 2 N- 1 - H G NA I L NA I L NA I L 22 4 2 N- H - T G F R E C NA I L NA I L NA I L 22 4 2 N- 1 - 1 - T S C NA I L NA I L NA I L 22 8 LI GH T W E I G H T 2 N- 1 - 1 - T G FA S T E N E R CO N C R E T E 22 8 2 N- 1 - H G F R E C FA S T E N E R 22 8 2 N- 1 - 1 - T S C FA S T E N E R BA S E SH E E T IN T E H P L Y IN T E R P L Y IN T E R P L Y #7 5 BA S E SH E E T #8 0 UL T I M A' ' BA S E SH E E T #7 5 BA S E SH E E T #8 0 UL T I M A ' " BA S E SH E E T 11 7 5 BA S E SH E E T 18 0 UL T I MA ' " BA S E SH E E T #7 5 BA S E SH E E T #8 0 U L TI M A '" BA S E SH E E T ST R A T A V E N 1 ' a NA I L A B L E ST R A T A V E N T' I ' NA I L A B LE BA S E SH E E T IN T E R P L Y #7 5 BA S E SH E E T IN r n B P L Y IN T E B P L Y #8 0 UL T I M A ' " BA S E SH E E T #7 5 BA S E SH E E T 11 8 0 UL T I M A ' " BA S E SH E E T tf 7 5 BA S E SH E E T #8 0 UL T I M A ~ BA S E SH E E T #7 5 BA S E SH E E T #80 UL T I M A '" BA S E SH E E T #7 5 BA S E SH E E T 11 80 UL TI M A '" BA S E SH E E T #'7 5 BA S E SH E E T #B O UL TI M A " BA S E SH E E T #75 BA S E SH E E T #8 0 UL T I M A '" BA S E SH E E T #7 5 BA S E SH E E T #8 0 UL T I MA "' BA S E SH E E T #7 5 BA S E SH E E T #8 0 UL T I M A ~ BA S E SH E E T #7 5 BA S E SH E E T 11 8 0 UL TI M A " BA S E S~ / E H ST R A T A V E N 1'3 NA I L A B L E 11 7 5 BA S E SH E E T #8 0 UL T IM A'" -B A S E SH E E T ST R A T A V E N T" ' NA U . A B L E #7 5 BA S E SH E E T #8 0 UL TI M A * BA S E SH E E T ST R A T A V E N T" ' NA I L A B L E ST R A T A V E N T " ' NA I L A B L E ST R A T A V E N T" ' NA I L A B L E ST R A T A V E N T " ' NA I L A B L E CAf TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH ToRCHSMOOTH TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH CAe TORCH GRA NU LE TORCH GRANULE TORCH GRANULE TORCH GRANULE ENERGYCAP '" TORCH FR ENERGYCAP'"TORCH FR ENERGYCAP ~ TORCH FR ENERGYCAP ~ TORCH FR TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH TORCH GRANULE ENERGYCAP ~ TORCH FR TORCH SMOOTH TORCH GRANULE TORCH GRANULE ENERGYCAP '" TORCH FR ENERGYCAP '" TORCH FR TORCH SMOOTH TORCH SMOOTH TORCH GRANULE TORCH GRANULE TORCH GRANULE ENERGYCAP '" TORCH FR ENERGYCAP "'I M TORCH FR ENERGYCAP '" TORCH FR TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH TORCH GRANULE ENERGYCAP '" TORC H FR TORCH SMOOTH Torch Applied Roofing Systems SUB FACIN G S UB FACING COATING COAT I NG COATING COATING COATING COATING COATING COATING COATI NG COATING COATING 15 YR DI A M ON D PL E D G E AN D SY S T E M PL E D G E GU A R A N T E E SP E C IF I C A nD N S PA G E # ~ NO , PL I E S .s e . E C 1 BO T T O M S HE E T AT T A C H M E N T 21 7 IN S U L A T I O N 2 1- 1 - 1 - T G P F R MO P TO PE R UT E MO P TO PE R UT E 21 7 2 1- 1 - H G P F R E C MO P TO PE R L I T E MO P TO PE R L I T E 21 8 2 l- 0 - 2 - S N T G SA TO IS O 21 8 2 1- 0 - 2 - S A I T G F R E C SA TO I SO 22 0 3 1 -2- H G MO P TO PE R LI T E MO P TO PE R LI T E 22 0 3 1-2- H G F R E C MO P TO PE R UT E MO P TO PE R U T E 21 9 3 l- 1 - 2 - T G MO P TO PE R LI T E MO P TO PE R LI T E SC R E W S & PL A T E S SC R E W S & PL A T E S 21 9 3 1- 1 - 2 - T GF R E C MO P TO PE R L I T E MO P TO PE R L I T E SC R E W S & PL A T E S > SC R E W S & PL A T E S - 0 - 0 22 6 NA I L A B L E 3 N- 2 - 1 - T G P F R NA I L .. . . 0 (W E S T ON L Y ) NA I L ;: : ; :: : r NA I L > 22 6 3 N- 2 + T G P F R E C NA I L " 0 -e . NA I L ~ 0 . . NA I L en ' < 22 5 3 N- 1 - 2 - T G NA I L "' ii ' NA I L 3 "' NA I L ~ c. > 22 5 3 N- 1 - 2 - T G F R E C NA I L NA I L NA I L 23 0 LI G H T W E I G K T 3 N- 2 · 1 - T G P F R FA S T E N E R CO N C R E T E 23 0 3 N· 2 · H G P F R E C FA S T E N E R 22 9 3 N- 1 · 2 - T G FA S T E N E R 22 9 3 N- 1 · 2 - T G F R E C FA S T E N E R 20 YR DI A M O N D PL E D G E AN O SY S T E M PL E D G E GU A R A N T E E SP E C I FI C A T T O N S UG U D.E C K ND . eu ~ s Sf f C _ j BO T T O M SH E E T AT T A C H M E N T 21 8 IN S U L A T I ON 2 1 ·0 - 2 - S A / T G P F R SA T O I SO 21 8 2 1- 0 - 2 - S M G P F R E C SA TO IS O 21 9 3 1- 1 · 2 - T G P F R MO P TO PE R U T E MO P TO PE R L I T E SC R E W S & PL A T E S SC R E W S & PL A T E S 21 9 3 f- 1 - 2 - T G P F R E C MO P TO PE R L I T E MO P TO PE R L I T E SC R E W S & PL A T E S SC R E W S & PL A T E S 22 0 3 1- 2 - 1 - T G P FR MO P TO PE R L I T E 22 0 3 1- 2 - 1 - T G P F R E C MO P TO PE R L I T E BA S E SH E E T IN T E R P L Y IN T E R P L Y I N T E R P L Y #7 5 BA S E SH E E T #8 0 UL TI M A " BA S E SH E E T 17 5 BA S E SH E E T 18 0 UL TI M A , . BA S E SH E E T RU B E R O I D " " SA OR LI B E R T Y " BA S E / P L Y RU B E R O I D ,. SA OR LI B E R T Y ' ' BA S E : / P L Y PL Y 4 PL Y 4 FL E X P L Y " " 6 R. E X P L Y " ' 6 PL Y 4 PL Y 4 FL E X P L Y " " 6 Fl E X P L Y " ' 6 #7 5 BA S E SH E E T TO R C H SM O O T H #8 0 UL T I M A '" BA S E SH E E T TO R C H SM O O T H 17 5 BA S E SH E E T TO R C H SM O O T H #8 0 UL T I M A ~ BA S E SH E E T TO R C H SM O O T H n s BA S E SH E E T TO R C H SM O O T I - l #8 0 UL T I M A ' " BA S E SH E E T TO R C H SM O O T H #7 5 B A S E S H E E T TO R C H SM O O T H #8 0 UL T I M A ~ BA S E SH E E T TO R C H SM O O T H #7 5 BA S E SH E E T FL E X P L Y" " 6 18 0 UL T I M A '" BA S E SH E E T FL E X P L Y" " 6 ST R A T A V E N T ' 9 NA I L A B L E FL E X P L Y " ' 6 11 7 5 BA S E SH E E T FL E X P L Y" ' 6 #8 0 UL T IM A " BA S E SH E E T FL E X P L Y ' " 6 ST R A T A V E N T ' l NA I L A B L E FL E X P L Y " ' 6 17 5 BA S E SH E E T TO R C H SM O O T H 18 0 UL TI M A ~ BA S E SH E E T TO R C H SM O O T H ST R A T A V E N ' J " l NA I L A B L E TO R C H SM O O T H 11 7 5 BA S E SH E E T TO R C H SM O O T H #8 0 UL T I M A ~ BA S E SH E E T TO R C H SM O O T H ST R A T A V E N T - NA I L A B L E TO R C H SM O O T H ST R A T A V E ~ NA I L A B L E FL E X P L Y" ' 6 ST R A T A V E ~ NA I LA B LE FL E X P L Y " 6 ST R A T AV ~ NA I L A B L E TO R C H SM O O T H ST R A T A V E N T 9 NA I L A B L E TO R C H SM O O T H BA S E S H E f T IN T E B P L Y l~ T E B P L Y IN T E B f l: . Y RU B E R O I D " ' SA OR LI B E R T Y ' BA S E : / P L Y RU B E R O I D " SA OR LI B E R T Y " " BA S f / P L Y #7 5 BA S E SH E E T TO R C H SM O O T H 18 0 UL T I M A W BA S E SH E E T TO R C H SM O O T H #7 5 BA S E SH E E T TO R C H SM O O T H #8 0 UL T I M A " BA S E SH E E T TO R C H SM O O T H 11 7 5 BA S E SH E E T TO R C H SM O O T I - l ta o U L TI M A "' BA S E SH E E T TO R C H SM O O T H 17 5 BA S E SH E E l TO R C H SM O O T H #8 0 UL T I M A ~ BA S E SH E E T TO R C H SM O O T H FL E X P L Y " ' 6 FL E X P L Y - 6 FL E X P L Y " ' 6 FL E X P L Y" ' 6 CAf S URFACING TORCH FR TORCH FR ENERGYCAP'" TORCH PWS FR ENERGYCAP"' TORCH PLUS FR TORCH GRANULE ENERGYCAP " TORCH FR TORCH GRANULE TORCH GRANULE ENERGYCAP '" TORCH FR ENERGYCAP '" TORCH FR TORCH GRANULE TORCH GRANULE TORCH GRANULE TORCH GRANULE ENERGYCAP"' TORCH FR ENE RGYCAP * TORCH FR ENERGYCAP 1 • TORCH FR ENERGYCAP '" TORCH FR TORCH FR TORCH FR TORCH FR ENERGYCAP '" TORCH PLUS FR ENERGYCAP'" TORCH PLUS FR ENERGYCAP '" TORCH PLUS FR TORCH GRANULE TORCH GRANULE TORCH GRANULE E NERGYCAP ~ TORCH FR ENERGYCAP~ TORCH FR ENERGYCAP " TORCH FR TORCH FR ENE RGYCAP '' TORCH PLUS FR TORCH GRANULE ENERGYCAP '' TORCH FR CM SUB FACING TORCH FR ENERGYCAP"' TORCH PLUS FR TORCH FR TORCH FR TORCH FR TORCH FR ENERGYCAP "' TORCH PLUS FR ENERGYCAP ~ mRCH PLUS FR ENERGYCAP"' TORCH PWS FR ENERGYCAP~ TORCH PLUS FR TORCH FR ENERGYCAP " TORCH PLUS FR swaisAs 6uuooy pa11ddlf lj:JJOl 20 YR DI A M O N D PL E D G E AN O SY S T E M PL E D G E GU A R A N TE E SP E C I F IC A n ON S (a on t i nu e d ) PA G E # ~ HO , eL ! E S s m J t BO T T O M SH E E T AT T A C H M E N T BA S E S HE E T IH U BP L Y IH T E B P L Y 22 1 IN S U L A T I O N 4 1· 3 · 1- T G P F R MO P TO PE R L I T E FL E X P L Y' " 6 FL E X P L Y ' " 6 MO P TO PE R L l l E PL Y 4 P L Y 4 22 1 4 1- 3 -1- T G P F R E C MO P TO PE R L l l E FL E X P L V ' " 6 FL E X P L Y " 6 MO P TO PE R L I T E PL Y 4 P L Y 4 22 5 NA I LA B LE 3 N- 1 - 2 - T G P F R NA I L 11 7 5 BA S E SH E E T TO R C H S M OO T H (W E S T ON L Y ) NA I L #8 0 UL T I M A '" BA S E SH E E T TO R C H SM O O T H NA I L ST A A T A V E N T 9 NA I L A B L E TO R C H SM O O T H 22 5 3 N- 1 -2 -TG P F R E C NA I L 17 5 BA S E SH E E T TO R C H SM O O T H NA I L 18 0 UL T I M A ' " BA S E SH E E T TO R C H SM O O T H NA I L ST R A T A V E ~ N AI L A B L E TO R C H SM O O T H 22 7 4 N- 3 - 1 - T G P F R NA I L 11 7 5 BA S E SH E E T FL E X P L Y ' ' 6 FL E X P L Y ' ' 6 NA I L #8 0 UL T I M A ~ BA S E SH E E T FL E X P L Y ' " 6 FL E X P L Y ' ' 6 NA I L ST R A T AV E N ' f ' l NA I LA B L E FL E X P L Y " 6 FL E X P L V - - 6 22 7 4 N- 3 · 1- T G P F R E C NA I L #,7 5 BA S E SH E E T FL E X P L Y ' " 6 FL E X P L Y " 6 NA I L #B O UL TI M A '" BA S E SH E E T FL E X P L Y ' " 6 FL E X P L Y " ' G NA I L ST R A T A V E N T " NA I LA B L E FL E X P L Y ' " 6 FL E X P L Y " 6 22 9 LI G H l W E I G H T 3 N- 1 - 2 - T G P F R FA S T E N E R ST R A T A V E ~ N A I LA B L E TO R C H SM O O T H 22 9 CO N C R E T E 3 N- 1 - 2 - T G P F R E C FA S T E N E R ST R A T A V E N T " " NA I LA B L E TO R C H SM O O T H 23 1 4 N- 3 - 1 - T G P F R FA S T E N E R ST R A T A V E NT 9 NA I L A B LE FL E X P L Y " 6 FL E X P L Y" ' 6 23 1 4 N- 3 · 1- T G P F R E C FA S T E N E R ST R A T A V E N T 9 NA I LA B L E FL E X P L Y ' " 6 FL E X P L Y" ' 6 ) > 10 YR IN T E R G R A T E O SY S T E M EN H A N C E D RO O F I N G GU A R A N T E E SP E C / F I C A n O N S : RE C O V E R ., , ., , ~ fA G . U l l f C K NO . PL I E S m u BO T T O M SH E f f AT T A C HM E N T BA S E SH E E T IN T E B e L Y IN T E B e L Y ~ 23 2 EX I S T I N G 1 R- 0 - 1 - T S TO R C H :: . - ) > SM O O T H BU R "' "' [ 12 YR /N T E R G R A T E D SY S T E M EN H A N C E D RO O F I N G GU A R A N T E E SP E C I F I CA T I O N S : RE C O V E R !R eA G U OE . K NO . PL I E S .8 f K ! BO T T O M S HE E T AT T A C H M E N T BA S E SH E E T IN T E R e L Y IN T E R e L Y Cl > ;; ; 23 2 EX I S T I N G 1 R- 0 - 1 - T G TO R C H 3 "' SM O O T H BU R ~ 23 2 R- 0 - 1 - T S C TO R C H .. . 10 YR D IA MO N D PL E D G E A NO SY S T E M PL . E D G E GU A R A N T E E OR 10 YR IN T E R G R A TE O SY S T E M EN H A N C E D RO O F I N G GU A R A N T E E SP E c t F I C A T T O N S : R E CO V E R fA G U QE C K NO , fL I E S ~ BO T T O M S HE E T AT T A C H M E N T BA S E SH E E T IN T E B e L Y IH T E R P L ) ' 23 3 EX I ST I NG 2 R- 1 - H S Sp 0 T M OP #7 5 BA S E SH E E T SM O O T H BU R SP O T MO P #B O UL TI M A "' BA S E SH E E T 1 0 YR DI A M O N D PL E D G E AN D SY S T E M P LE DG E GU A R A N T E E OR 12 Y R I NT E R G R A T E D SY S T E M EN H A N C E D RO O F I N G GU A R A N T E E SP E CI F I C A n D N S : RE C OV E R fA G U !l f C . K NO , PL I E S ~ BO T T O M S HE ET AT T A C H M E N T BA SE S HE E T IN I E B e ! . Y I N TE B P L Y 23 3 EX I S T I NG 2 R- 1 - 1 - T G SP O T MO P #7 5 BA S E SH E E T SM O O T H BU A SP O T MO P #B O UL T I M A " ' BA S E SH E E T 23 3 2 R- 1 - 1 - T S C SP O T MO P /1 7 5 BA S E SH E E T SP OT MO P 18 0 UL TI M A "' BA S E SH E E T IU T E R P L Y FL E X P L Y ' M G PL Y 4 tN T E R e L Y IN T E B P L Y IN T E B e L Y IN T E R e LY CM TORCH FR TORCH FR Torch Applied Roofing Sy s t e m s S URFAC I NG ENERGYCAP .. TORCH PLUS FR ENERGYCAP,. TORC H PLUS FR TORC H FR TORCH FR TORCH FR ENERGYCAP"' TORCH PLUS FR ENERGYCAP'" TORCH PLUS FR ENER G YCAP~ TORCH PLUS FR TORCH FR TORCH FR TORCH FR E NERGYCAP • TO RCH PWS FR ENERGYCAP'" TORCH PLUS FR ENERGYCAP"' TORCH PLUS FR TORCH FR ENERGYCAP• TORCH PWS FR TORCH FR E N ERGYCAP '" TORCH PLUS FR ~ SUB E AC!NG TORCH w S UREACIHG TORCH GRANULE TORCH SMOOTH COAT IN G CAf SURFACING TORC H SMOOTH TORCH SMOOTH w S UBfACING TORCH GRANULE TORCH GRANULE TORCH SMOOTH COATING TORCH SMOOTH COAT ING TWO (2) PLY APP TORCH SYSTEM INSULATED DECK •• GAfMAlcRIALS CORPORATION See Base Sheet Attachment Below GENERAL Safety: Refer to Section 1.06. DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLE MENTED . MATERI ALS Material Requirements per 100 sq. ft.: Insulation Asphalt (per ply, if app li cable) ................... 25 lbs. (1 .22 kg/m 2) Base Sheet . . . . . . . . . . 1 ply RUBERDID 0 orGAFGLAS• RUBEROID • Base Sheet Membrane Sllr11cing {II eppllcablt) Membrane .......... 1 ply Surf acing (if app licab le) 10 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES SPEC# BOTTOM SHEET ATTACHMENT BASE SHEET CAP I-1-1-TS MOP TO PERLITE #75 BASE SHEET TORCH SMOOTH MOP TO PERLITE #80 UL TIMA"' BASE SHEET TORCH SMOOTH SCREWS & PLATES #75 BASE SHEET TORCH SMOOTH SCREWS & PLATES #80 UL TIMA"' BASE SHEET TORCH SMOOTH 12 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES SPEC# BOTTOM SHEET ATTACHMENT BASE SHEET CAP I-1-i-TG MOP TO PERUTE #75 BASE SHEET TORCH GRANULE MOP TO PERLITE #80 ULTIMA"' BASE SHEET TORCH GRANULE SCREWS & PLATES #75 BASE SHEET TORCH GRANULE SCREWS & PLATES #80 ULTIMAN BASE SHEET TORCH GRANULE I-1-1-TGFREC MOP TO PERLITE #75 BASE SHEET ENERGYCAP "' TORCH FR MOP TO PERLITE #80 UL TIMA'" BASE SHEET ENERGYCAP'" TORCH FR SCREWS & PLATES #75 BASE SHEET ENERGYCAP'" TORCH FR SCREWS & PLATES #80 ULTIMA"' BASE SHEET ENEAGYCAP1 " TORCH FR I+1-TSC MOP TO PERLITE #75 BASE SH EET TORCH SMOOTH MOP TO PERLITE #80 ULTIMA"' BASE SHEET TORCH SMOOTH SCREWS & PLATES #75 BASE SHEET TORCH SMOOTH SCREWS & PLATES #80 ULTIMA"' BASE SHEET TORCH SMOOTH APP Torch Applied Systems 216 SURFACING COATING COATING COATING COATING TWO (2) PLY APP TORCH SYSTEM INSULATED DECK GAF EnergyGoard"' Non-lsocyanuratt l nsulaUon --/---'-'------'---:..._--r-""::all 3P /t' RUBEROID•or GAFGLAS* RUBEROID8 Base She et Memb rane GENERAL m· GAF WO'ERIALS CORPORATION Safety: Refer to Section 1.06. DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLEMENTED . MATERIALS Material Requirements per 100 sq. ft.: Insulation (Perlite) Asphalt (per ply) ...... 25 lbs. (1.22 kg/m 2) Base Sheet .......... 1 ply Mernbrane . . . . . . . . . . 1 ply 15 YEAR DIAMOND PLEDGE ANO SYSTEM PLEDGE GUARANTEES SPEC# I-1-1-TGPFR I-1-1-TGPFREC BOTTOM SHEET ATTACHMENT MOP TO PERLITE MOP TO PERLITE MOP TO PERUTE MOP TO PEALITE BASE SHEET #75 BASE SHEET #80 UL TIMA BASE SHEET #75 BASE SHEET #80 UL TIMA BASE SHEET APP Torch Applied Systems 217 CAP TORCH FR TORCH FR ENERGYCAP'" TORCH PLUS FR ENERGYCAP"' TORCH PLUS FR TWO (2) PLY SBS SELF-ADHERING BASE/APP TORCH SYSTEM INSULATED DECK ■· GAFWQ"ERIAI.S CORPORATION . . . -.. -. . 3!'~.1 ..... i 4"Ml n RUBEROID• SA or LIBERTY-RU8EROIO• SASE/PLY SHEn Membrane GENERAL Safety: Refer to Section 1.06 . DO NOT BEGIN INSTALLATIO N UNTIL THIS INFORMATIO N IS RE AD, UNDERSTOOD AND IMPLE MENTED . MATERIALS Material Requ irements per 100 sq . ft.: Approved In sulation Matrix"' 201 Fl ashing Cement. ... as required Liberty'" MA Base Sheet. . . . . 1 Pl y Liberty"' Base /Ply Sheet . . . . . 1 Pl y Liberty "' Cap Sheet. . . . . . . . . 1 Pl y 15 YEAR DIAMOND AND SYSTEM PLEDGE GUARANTEE SPECIFICATIONS: SPEC# 1-0-2-S.AJTG 1-0-2-S.AJTGFREC BOTTOM SHEET ATTACHMENT SATO ISO SA TO ISO BASE/ INTE APLY RUBEROI D® SA OR LIBERTY" BASE/PLY RUBEROI 00 SA OR LIBERTY" BASE/PLY CAP TORCH GRANULE ENERGYCAPlW TORCH FR 20 YEAR DIAMOND AND SYSTEM PLEDGE GUARANTEE SPECIFICATIONS: SPEC# 1-0-2-S.AJTGPFR 1·0-2-S.AJTGPFREC BOTTOM SHEET BASE/ ATTACHMENT !NTERPL Y SA TO ISO RUBEROI D® SA OR LIBERTY'" BASE/PLY SA TO ISO RUBEROID® SA OR LIBERTY'" BASEJPLY APP Torch App li ed Systems 218 CAP TORCH FR ENERGYCAP!V TORC H PLUS FR THREE (3) PLY APP TORCH SYSTEM INSULATED DECK a · GAFMAJEllALS CORPORATION GAf EnergyG1ud111 lnsulallon -z=____// GAFGlAS~ 175 RUBEROID• TORCH Bau Shtel SMOOTH RUBEROIO• Mambrana GENERAL Safety: Ref er to Section 1.06. DO NOT BEGI N INSTALLATION UNTIL THIS INFORMATION IS READ, UNDERSTOOD AND IMPLEMENTED. MATERIALS Material Requirements per 100 sq. ft.: Asphalt (if applicable) .. 25 lbs . (1.22 kg/m 2) Insulation Base Sheet. . . . . . . . . . 1 ply lnterply . . . . . . . . . . . . . 1 ply Membrane . . . . . . . . . . 1 ply 15 VEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC# ATTACHMENT BASE SHEET INTERPLY CAP 1·1-2-TG MOP TO PERLITE #75 BASE SHEET TORCH SMOOTH TORCH GRANULE MOP TO PERLITE #80 ULTIMA"' BASE SHEET TORCH SMOOTH TORCH GRANULE SCREWS & PLATES #75 BASE SHEET TORCH SMOOTH TORCH GRANULE SCREWS & PLATES #85 ULTIMA"' BASE SHEET TORCH SMOOTH TORCH GRANULE 1-1-2-TGFREC MOP TO PERLITE #75 BASE SHEET TORCH SMOOTH ENERGYCAP .• TORCH FR MOP TO PERLITE #80 ULTIMA"' BASE SHEET TORCH SMOOTH ENERGYCAP" TORCH FR SCREWS & PLATES #75 BASE SHEET TORCH SMOOTH ENERGYCAP .. TORCH FR SCREWS & PLATES #80 ULTIMA"' BASE SHEET TORCH SMOOTH ENERGYCAP .. TORCH FR 20 VEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC# ATTACHMENT BASE SHEET INTERPLY CAP 1·1-2 -TGPFR MOP TO PERLITE #75 BASE SHEET TORCH SMOOTH TORCH FR MOP TO PERLITE #80 UL TIMA"' BASE SHEET TORCH SMOOTH TORCH FR SCREWS & PLATES #75 BASE SHEET TORCH SMOOTH TORCH FR SCREWS & PLATES #85 ULTIMA "' BASE SHEET TORCH SMOOTH TORCH FR ~1 -2-TGPFREC MOP TO PERLITE #75 BASE SHEET TORCH SMOOTH ENERGYCAP~ TORCH PL US FR MOP TO PERLITE #80 UL TIMA"' BASE SHEET TORCH SMOOTH ENERGYCAP~ TORCH PLUS FR SCREWS & PLATES #75 BASE SHEET TORCH SMOOTH ENERGYCAP" TORCH PLUS FR SCREWS & PLATES #85 ULTIMA"' BASE SHEET TORCH SMOOTH ENERGYCAP~ TORCH PLUS FR APP Torch Appl ied Systems 219 THREE (3) PLY APP TORCH SYSTEM INSULATED DECK See Base Sheet Attachment Below GAf EnorgyGuanr lnsulaUon---,._ GAFGLAS" FlerPly" 6 or Ply 4 Sleep Asphalt ASTM l'f P• Ill or IV RUBEROID,_ Membrine GENERAL Safety: Refer to Section 1.06. a· GAF MIITERIAlS CORPORATION DO NOT BEGIN INSTALLAT ION UNTIL THIS INFORMATION IS READ i UNDERSTOOD AND IMPLEMENTED. MATERIALS Material Requireme nts per 100 sq. ft.: In su lati on (Perli te) Asphalt (pe r ply) ...... 25 lbs. (1 .22 kg/m 2) lnterply ............. 2 plie s Membrane . . . . . . . . . . 1 ply 15 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC# ATTACHMENT 1-2-1-TG MOP TO PERLITE ·MOP TO PERLITE I-2-1-TGFREC MOP TO PERLITE MOP TO PERLITE INTERPLY PLY 4 FLEXPLY"' 6 PLY 4 FLEXPLY"' 6 INTERPLY PLY 4 FLEXPLY"' 6 PLY 4 FLEXP L Y"' 6 CAP TORCH GRANULE TORCH GRANULE ENERGYCAP"' TORCH FR ENERGYCAP'" TORCH FR 20 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC# ATTACHMEN T I-2-1-TGPFR MOP TO PERLITE I-2-1-TGPFREC MOP TO PERLITE INTERPLY FLEXPLY" 6 FL EXPLY"' 6 INTERPLY FLEXPLY"' 6 FLEXPLY'" 6 APP Torch Applied Syste ms 220 CAP TORCH FR ENERG YCAP '" TORCH PLUS FR FOUR (4) PLY APP TORCH SYSTEM INSULATED DECK 11'/a" GAfGLAS• FIUP!y"' 6 or Ply 4 RUBEROme Membrne GENERAL Safety: Refer to Section 1.06. DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLEMENTED . MATERIAL S Material Requirements per 100 sq. ft.: Asphalt (per ply) ...... 25 lbs. (1.22 kg/m2 ) lnterply ............. 3 plies Membrane .......... 1 ply Insu lation (Perlite ) 20 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC# ATTACHMENT INTERP!,.Y INTERPLY INTERPLY CAP I-3-1-TGPFA MOP TO PERLITE FLEXPLY"6 FLEXPLY" 6 FLEXPLY"' 6 TORCH FR MOP TO PERLITE PLY4 PLY 4 PLY 4 TORCH FR I-3-1-TGPFAEC MOP TO PERLITE FLEXPL Y"' 6 FLEXPLY'" 6 FLEXPLY'" 6 ENERGYCAP'" TORCH PLUS FR MOP TO PERLITE PLY4 PLY 4 PLY 4 ENERGYCAP .. TORCH PLUS FR Note: If GAFGLA~ STRATAVENT'> ELIMINATOR"' Perforated Venting Base Sheet is installed under this specification, one interply may be eliminated and the system can be installed directly over EnergyGuard™ lsocyanurate roof insulation. APP Torch Applied Systems 22 1 ONE (1) PLY APP TORCH SYSTEM NON-NAILABLE DECK m· GN MATERIALS CORPORATION RUBEROID• Surfacing Momb11n1 (II ~ppll~abl1I GENERAL Safety: Refer to Section 1.06. DO NOT BEG IN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERST OOD AN D IMPLEMENTED . MATERIALS Material Requirements per 100 sq . ft.: Asphalt Concrete Primer ... 1/2 -1 gal. (.2 -.4 Um2) Membrane ........... 1 ply Surfacing (if applicab le) 10 VEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES SPEC# NN-0-1-TS BOTTOM SHEET ATTACHM ENT TORCH CAP TORCH SMOOTH 12 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES SPEC# NN-0-1-TG NN-0-1-TGFREC NN·0-1-TSC BOTTOM SHEET ATTACHMENT TORCH TORCH TORCH CAP TORCH GRANULE ENERGYCAP"' TORCH FR TORCH SMOOTH APP Torch Applied Systems 222 SURFACING COATING TWO (2) PLY APP TORCH SYSTEM NON -NAILABLE DECK :m - GAF~ CORPORATION 39¼" Sleep AsphaH ASTM Type Ill or I~ RUBEROI09 or GAFGLA~ RUBERO!D9 Sarf1cin9 Ban Shaal Membrane [II applicable) GE NER AL Safety: Ref er to Section 1.06. DO NOT BE GIN INSTALLAT IO N UNTIL THIS INFORM ATIO N IS READ , UNDER STOOD AND IMPLEMENTED . MATERIALS Material Require ments per 100 sq. ft .: Asphalt Concrete Primer ... 1 /2 -1 gal. (.2 -.4 ltrs./m2) Base Sheet . . . . . . . . . . 1 ply Memb rane . . . . . . . . . . 1 ply Surf aci ng (if app lica bl e) As pha lt ............. 25 lb s. (1.22 kg/m2) 10 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES SPEC # NN-1-1-TS BOTTOM SHEET ATTACHM ENT MOP MOP BASE SHE ET #75 BASE SHEET #80 ULTIMA"' BASE SHEET CAP TORCH SMOOTH TORCH SMOOTH 12 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARAN TEES BOTTOM SHEET SPEC# ATTACHMENT BASE SHEET CAP NN-1-1-TG MOP #75 BASE SHEET TORCH GRANULE MOP #80 UL TIMA'" BASE SHEET TORCH GRANULE NN-1-1-TGFREC MOP #75 BASE SHEET ENERGYCAP'" TORCH FR MOP #80 UL TIMA "' BASE SHEET EN ERGYCAP'" TORCH FR NN-1-1 -TSC MOP #75 BASE SHEET TORCH SMOOTH MOP #80 ULTIMA"' BASE SHEET TORCH SMOOTH APP Torch Ap pl ied Systems 223 SURFACING COATING COATING TWO (2) PLY APP TORCH SYSTEM NAILABLE DEC K . . . . . . . . rl.1 -RUBER010• or OAFGLAS9 RUBERO10• Sar1ac lng Bast Shut lhmb11na (II appllelblt) GENERAL Safety: Refer to Section 1.06. m· GAF MATERIALS CORPORATION DO NOT BEGIN INSTALLATION UNTIL TH IS IN FORMATION IS READ , UN DERSTOOD AND IMPLE MENTED. MATERIALS Materia l Requirements per 100 sq. ft .: Base Sheet. . . . . . . . . . 1 ply Membrane . . . . . . . . . . 1 ply Surfacing (if applicable) 10 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC # ATTACHMENT BASE SHEET CAP N-1-1-TS NAIL #75 BASE SHEET TORCH SMOOTH NAIL #80 UL TIMA ~ BASE SHEET TORCH SMOOTH NAIL STRATAVEN~ NAILABLE TORCH SMOOTH 12 VEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC# ATTACHMENT BASE SHEET CAP SURFACING N-i-1-TG NAIL #75 BASE SHEET TORCH GRANULE NAIL #80 UL TIMA"' BASE SHEET TORCH GRANULE NAIL STRATA VEN ~ NAILABLE TORCH GRANULE N-1 ·1-TGFREC NAIL #75 BASE SHEET ENERGYCAP'" TORCH FR NAIL #80 UL TIMA ~ BASE SHEET ENERGYCAP'" TORCH FR NAIL STRATAVEN~ NAILABLE ENERGYCAP'" TORCH FR N-H-TSC NAIL #7 5 BASE SHEET TORCH SMOOTH COATING NAIL #80 ULTIMA~ BASE SHEET TORCH SMOOTH COATING NAIL STRATAVEN~ NAILABLE TORCH SMOOTH COATING APP Torch Applied Systems 224 THREE (3) PLY APP TORCH SYSTEM NA IL ABLE DECK See Base Sheet Attachment Below 2"Mln Side H1ll1bl1 D ■.11~:;t:::=.--/ l.1 GAfGt.AS" RUIERom• STRATAVEN~ lnttrply Eliminator• N1ll1bl1 8111 Sheet RUIEROtll• Mtmbraae GENER AL Safety: Refer to Section 1.06. DO NOT BEG IN INSTALLATI ON UNTI L THIS INFORMATION IS READ , UND ERSTOOD AND IMP LEMENTED. MATERIALS Base Sheet. . . . . . . . . . 1 ply lnterply ............. 1 ply Membrane . . . . . . . . . . 1 ply 15 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES (West Zone Only) BOTTOM SHEET SPEC# N-1-2-TG ATTACHMENT NAIL NAIL NAIL N-1-2-TGFREC NAIL NAIL NAIL BASE SHEET #75 BASE SHEET #80 ULTIMA"' BASE SHEET STRATAVEN~ NAILABLE INTERPLY TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH #75 BASE SHEET TORCH SMOOTH #80ULT1MA"' BASE SHEET TORCH SMOOTH STRATAVEN T-NAILABLE TORCH SMOOTH CAP TORCH GRANULE TORCH GRANULE TORCH GRANULE ENERGYCAP'" TORCH FR ENERGYCAP'" TORCH FR ENERGYCAP"' TORCH FR 20 VEAR DIAMOND PLEDGE AN'D SYSTEM PLEDGE GUARANTEES (West Zone Only) BOTTOM SHEET SPEC# ATTACHMENT N· 1·2-TGPFR NAIL NAIL NAIL N-1-2-TGPFREC NAIL NAIL NAIL BASE SHEET #75 BASE SHEET #80 ULTIMA~ BASE SHEET STRATAVENT-NAILABLE INTERPLY TORCH SMOOTH TORCH SMOOTH TORCH SMOOTH #75 BA.SE SHEET TORCH SMOOTH #80 ULTIMA" BASE SHEET TORCH SMOOTH STRATA\/EN? NAILABLE TORCH SMOOTH APP Torch App li ed Systems 225 CAP TORCH FR TORCH FR TORCH FR ENERGYCAP'" TORCH PLUS FR ENERGYCAP" TORCH PLUS FR ENERGYCAP"" TORCH PLUS FR THREE (3) PLY APP TORCH SYSTEM NAILABLE DECK m· GN' !UJ'ElllAI.S CORPORATION Ste tp Asph11l Type Ill or IV RUBERDIO- M1mbran 1 GENER AL Safety: Refer to Section 1.06. DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLE MENTED. MATER IALS Material Requirements per 100 sq. ft.: Asphalt (per ply} ...... 25 lbs. (1.22 kg/m2) Base Sheet . . . . . . . . . . 1 ply lnterply ............. 1 ply Membrane . . . . . . . . . . 1 ply 15 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES (West Zone Only) BOTTOM SHEET SPEC# ATTACHMENT BASE SHEET INTERPLY CAP N-2· 1 • TGPFR NAIL #75 BASE SHEET FLEXPL Y"' 6 TORCH FR NAIL #80 UL TIMA '" BASE SHEET FLEXPL Y"' 6 TORCH FR NAIL STRA T AV ENT8 NAILABLE FLEXPL Y" 6 TORCH FR N-2+TGPFREC NAIL #75 BASE SHEET FLEXPL Y" 6 ENERGYCAP"' TORCH PLU S FR NAIL #80 UL TIMA"' BASE SHEET FLEXPLY" 6 ENERGYCAP"' TORCH PLUS FR NAIL STRAT AVENT8 NAILABLE FLEXPL Y"' 6 ENERGYCAP '" TORCH PLUS FR APP Torch Applied Systems 226 FOUR (4) PLY APP TORCH SYSTEM NAILABLE DECK Sleep Asphall GAFGLAs8 BauSbael ---- RUBEROID Membraoe GEN ER AL Safety: Refer to Section 1.06. m·- GAi'MAl'ERIALS CORPORATION DO NOT BEG IN INSTALLATION UNTIL THIS INFORMATION IS READ, UN DE RSTOOD AN D IMPLEMENTED. MATERI ALS Materia l Requirements per 100 sq. ft.: Asphalt (per ply) ...... 25 lbs. (1.22 kg/m2) lnterply ............. 2 plies Membrane .......... 1 ply Base ............... 1 ply 20 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES (West Zone Only) BOTTOM SHEET SPEC# ATTACHMENT BASE SHEET N-3-1-TGPFR NAIL #75 BASE SHEET INTERPLY FLEXPLY'" 6 NAIL #80 ULTIMA"' BASE SHEET FLEXPL Y" 6 NAIL STRATAVENT-NAJLABLE FLEXPL Y'" 6 INTERPLY FLEXPLY'" 6 FLEXPLY-6 FLEXPLY'" 6 CAP TORCH FR TORCH FR TORCH FR N-3-1-TGPFREC NAIL NAIL NAIL #75 BASE SHEET FLEXPL Y" 6 FLEXPL Y-6 ENERGYCAP~ TORCH PLUS FR #80 UL TIMA"' BASE SHEET FLEXPL Y" 6 FLEX PLY"" 6 ENERGY CAP'' TORCH PLUS FR STRATAVENT8 NAJLABLE FLEXPL Y" 6 FLEXPL Y'" 6 ENERGYCAP" TORCH PLUS FR APP Torch Applied Systems 227 TWO (2) PLY APP TORCH SYSTEM LIGHTWEIGHT INSULATING CONCRETE GENERAL E GAF~ CORPORATION See Base Sheet Attachment Below l19htw1lghl ---- lnsulallng Concret• Safety: Refer to Section 1.06. DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLEMENTED. MATERIALS Material Requirements per 100 sq. ft.: -Base Sheet .......... 1 ply -.-·-.... ..--, . . . 39 ¼" Membrane . . . . . . . . . . 1 ply Surfacing (if applicable) . . . . STRATAVENT'" Eliminator~ Nallable Base Shnl RU8Ell01~ Membrane Sulfaclng (II applicable) 10 YEAR DIAMOND PLEDGE ANO SYSTEM PLEDGE GUARANTEES SPEC# N-1-1-TS BOTTOM SHEET ATTACHMENT FASTENER BASE SHEET CAP STRA T AVENT® NAILABLE TORCH SMOOTH 12 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC# ATTACHMENT BASE SHEET CAP N-1-1-TG FASTENER STRATAVE~ NAILABLE TORCH GRANULE N-1-1-TGFREC FASTENER N-HTSC FASTENER STRATAVE~ NAILABLE STRATAVE~ NAILABLE ENERGYCAP'" TORCH FR TORCH SMOOTH APP Torch Applied Systems 228 SURFACING COATING THREE (3) PLY APP TORCH SYSTEM LIGHTWEIGHT INSULATING CONCRETE L!ghlWalghl ___,..__ l'r,sulat ing Concrete Declt GAFGlAS• RUBEROID" RUBEROID" Base Sheet TORCH Membrane GENERAL Safety: Refer to Section 1.06. DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLEMENTED. MATERIALS Base Sheet . . . . . . . . . . 1 ply lnterply . . . . . . . . . . . . . 1 ply Membrane .......... 1 ply 15 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES SPEC# N-1-2-TG BOTTOM SHEET ATTACHMENT FASTENER N-1-2-TGFREC FASTENER FR BASE SHEET STRATAVENT® NAlLABLE STRATAVEN'f"e NAILABLE INTERPLY TORCH SMOOTH TORCH SMOOTH 20 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SHEET SPEC# ATTACHMENT N-1-2-TGPFR FASTENER BASE SHEET STRATAVEN-r' NAILABLE INTERP LY TORCH SMOOTH CAP TORCH GRANULE ENERGYCAP"' TORCH CAP TORCH FR N-1-2-TGPFREC FASTENER STRATAVEN~ NAILABLE TORCH SMOOTH ENERGYCAP~ TORCH FR APP Torch Applied Systems 229 THREE (3) PLY APP TORCH SYSTEM LIGHTWEIGHT INSULATING CONCRETE See Base Sheet Attachment Below rMln Side fr-'==-J,.✓ · · · • Staap Asphatt Tn• Ill or IV ~ . ~ mu STRATAVENte GAfGUS fleiPIY & RUBER0IO• llemb11n1 Blml111lor"' llall>blo Bau Shot! GENERAL Safety: Refer to Section 1.06 . m· GN'MmRIALS CORPO RATION DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLEMEN TED. MATERIALS Material Requirements per 100 sq. ft.: Asphalt (per ply) ...... 25 lbs. (1.22 kg/m2) Base Sheet . . . . . . . . . . 1 ply lnterply ............. 1 ply Membrane .......... 1 ply 15 VEAR DIAMOND PLEDGE ANO SYSTEM PLEDGE GUARANTEES BOTTOM SH EET SPEC# ATTACHMENT BASE SHEET INTER PLY ~ N-2-1-TGPFR FASTENER STRATAVEN')'ltNAILABLE FLEXPLY"' 6 TORCH FR N-2-1-TGP FREC FASTENER STRATAVENT0 NAILABLE FLEXP L r 6 ENERGYCAP"' TORCH PLUS FR APP Torch App li ed Systems 230 FOUR (4) PLY APP TORCH SYSTEM LIGHTWEIGHT INSULATING CONCRETE GAFGLAS" Slralavenl ·~--1- Ellmln1tor Naill Bu s Steep A>ph■II Side RUBEROID Membrane GENERAL Safety: Refer to Section 1.06. DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLEMENTED . MATERIALS Material Requirements per 100 sq. ft.: Asphalt (per ply) ...... 25 lbs. (1.22 kg/m 2) lnterply ............. 2 plies Membrane .......... 1 ply Base Sheet .......... 1 ply 20 YEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES BOTTOM SH EET SPEC# ATTACHM ENT BASE SHEET INTERPL Y INTER PLY CAP N-3-1-TGPFR FASTENER STRATA VENT® NAJLABLE FLEXPL Y"' 6 FLEXPL Y"' 6 TORCH FR N-3-1 -TGPFREC FASTENER STRA TAVE~ NAILABLE FLEXPL Y"' 6 FLEXPL Y"' 6 ENERGY CAP"' TORCH PLUS FR APP Torch App li ed Systems 231 ONE (1) PLY APP TORCH SYSTEM EXISTING SMOOTH SURFACED BUR ROOF m· GAFIOOcRIALS CORPORATION Existing Srnoolh Surfacod BUR Root --- RUBEROIO8 Surfacing 10 YEAR LMG GUARANTEES SPEC# R-0-1-TS BOTTOM SHEET ATTACHMENT TORCH 12 YEAR LMG .GUARANTEES SPEC# R-0-1-TG R-0-i-TSC BOTTOM SHEET ATTACHMENT TORCH TORCH TORCH {fl appll~bJa, CAP TORCH SMOOTH CAP TORCH GRANULE TORCH SMOOTH GENERAL Safety: Refer to Section 1.06. DO NOT BEGIN INSTALLATION UNTIL THIS INFORMATION IS READ , UNDERSTOOD AND IMPLEMENTED . MATERIALS Material Requirements per 100 sq. ft.: Asphalt Concrete Primer . 1 /2-1 gal (.2-.4 Um 2) Membrane ............ 1 ply Surfacing (i f applicable) SURFACING COATING APP Torch App li ed Systems 23 2 TWO (2) PLY APP TORC H SYSTEM EXISTING SMOOTH SURFACE BUR ROOF m· - GAF MATERIALS CORPORATION histing Smooth Surtac1 BUR Root Spol or Strip mop with Stee~ Asphalt ASTM Type Ill orlV --#'-----1 2"Mln Side . -- 19111,.· GAFGLAS" f75 Base Sheet RUBEROID• Surlaclno MEMBRAIIE (It applicable) GENER AL Safety: Refer to Section 1.06 . DO NOT BEG IN INSTALLATIO N UNTIL THI S INFORMATI ON IS RE AD, UNDERST OOD AN D IMPLE MENTED . MATERI ALS Materia l Requi rements per 100 sq. ft.: Asphalt Concrete Primer. . . 1 /2 -1 gal. (.2 -.4 ltrs./m2 ) As pha lt ............. 20 lbs . (.98 kg/m 2 ) Base Sheet. . . . . . . . . . 1 pl y Membrane . . . . . . . . . . 1 ply Surfacing (if ap pl icable) 10 YEAR DIAMOND PLEDGE AND SYSTEM PL EDG E GUARANTEES OR 10 YEAR LMG GUARANTEES SPEC# R-1-i-TS BOTTOM SHEET ATTACHMENT SPOT MOP SPOT MOP BASE SHEET #75 BASE SHEET #80 UL TIMA'" BASE SHEET CAP TORCH SMOOTH TORCH SMOOTH 12 VEAR DIAMOND PLEDGE AND SYSTEM PLEDGE GUARANTEES OR 12 YEAR LMG GUARANTEES BOTTOM SHEET SPEC# ATTACHMENT BASE SHEET CAP SURFACING R-1-1 -TG SPOT MOP #75 BASE SHEET TORCH GRANULE SPOT MOP #80 ULTIMA"' BASE SHEET TORCH GRANULE R-1-1 -TSC SPOT MOP #75 BASE SHEET TORCH SMOOTH COATING SPOT MOP #80 UL TIMA'" BASE SHEET TORCH SMOOTH COATING APP Torch Applied Systems 233 Installation Requirements -RUBEROID® APP Torch Applied Systems: The following specification requirements shall be considered part of and used in conjunction with the Roof Design, Gen eral Installation and Construction Details sections of this manual. Part 8 -Membrane System Installation 8.01 General A. Substrates must be inspected and accepted by the contractor as suitable to receive and hold roof membrane materials. B. Start the installation of all membrane plies at the low point or drains, so the flow of water is over or parallel to the ply laps, but never against t he laps. C . Position and align roll prior to application. Chalk lines where necessary to assure proper alignment and headlap widths of membrane plies. D. Use half base sheet width as a starter strip in two-ply roof constructions. E. Installation of all membrane plies, except those that are mechan ically fastened , shall result in a visible , uniform flow-out of bitumen at side and end laps. F. Assure that all membrane plies lay flat and are uniformly secured to their substrate. Wrinkles, fish mouths and sim ilar defects must be removed and patched. G. Extend all membrane plies to dimensions necessary to accommodate flashing conditions shown in t he Flash ing Details section of this manual. H. All lap edges for GAFMC cap membranes shall be rolled-in or walked-in immediately after installation. Additional care must be taken to insure complete bonding at "T" laps. Lap edges on all membrane sheets should be inspected for full and uniform bonding to the underlying membrane sheet. I. Stagger all adjacent end laps for all membrane plies a minimum of 18" (45.7 cm). Side laps shall not coincide with underlying plies in multiple layer applications. J . Prime all masonry, metal and existing asphalt surfaces and substrate with asphalt primer where insulati on or GAFMC membranes are to be adhered. Matrix"' 307 Premium Asphalt Primer (ASTM D 41) shall be applied at the rate of 1 gaVsquare (0.41 Um2) minimum or as required by primer manufacturer. Allow the primer adequate time to dry. K. Broom ing-in of glass felts is vital to minim ize voids and assure complete, uniform attachment. L. Occasionally, a roll of felt or membrane will contain a splice that was fabricated as part of the manufacturing process. These splices are marked. Cut out all splices, and treat as an end lap. M . Back nailing of felts and cap sheets, and the use of ASTM D-312 Type IV asphalt is required on slopes 3/4'' per foot (6.2 cm per meter) or greater. Refer to General Installation Requirements, Part 6, uSteep Slope Requirements". N. RUBEROl[)'!ll Torch Grade APP membranes are intended for use with RUBEROI OS' Torch Grade flashing membranes and should not be mixed with SBS materials. RUBEROIIY Torch Grade APP membranes may be used with compatible asphalt based built-up roofing systems as torch applied flashing materials. APP Torch Applied Systems 234 8.02 Phas ing-------------------~· A . The term "phasing" refers to the practice of applying part of a total roof membrane at one time and allowing that part to remain exposed to the weather for a period of time before applying the remaining elements of the roof system. Membranes applied in t his manner are subject to early deterioration. Blisters , voids, membrane damage and moisture infiltration are much more likely to occur in uphased" roof membranes. B. GA FMC does not approve the practice of "phasing". C. Whenever it is necessary to put a building 'in the dry'' quickly, a temporary roof covering is recommended; this temporary roof should be removed prior to installation of t he roof system. 8.03 Base Sheets -Mechanically Fastened ----------- A. After allowing the base sheet to relax , keep sheet taut, fastening at center of sheet and working in opposite directions. Push all wrinkles and buckles ahead as fastening proceeds. The following are minimum faste ning patterns that may be used when fastening the base ply. For Factory Mutual Global approved fastenin g patterns, refer to the current FM Global Approvals and li stings. 1. Base sheet (no insulation) on decks of wood , plywood, OSB, lightweight concrete, gypsum, or cementitious wood fiber (Figure 1 ). A. Lap the base sheet 2" (5.1 cm), and mechanically fasten with three rows of fasteners . The fi rst row (on the seam ) wi ll be 1" (2.5 cm) from the leading edge and on 9" (22.9 cm) centers. Locate the second row of fasteners 14" (35.6 cm) from the leading edge and on 18" (45.7 cm) centers. The third row of fasteners shall be 26" (66.0 cm) from the leading edge on 18" (45 .7 cm) centers. The cente rs for the second an d third rows shoul d be staggered. B. Plywood or OSB decks only. Lap the base sheet 2'' (5.1 cm), and mechanically fasten with four equally spaced rows of Senco Tape and N12 BAB or N12 FAB Staples spaced at 9" (22.9 cm) o.c. centered over the 2" (5.1 cm} wide laps and at 9" (22.9 cm) o.c. in three rows equally spaced in the field of the sheet. 2. Simultaneous fastening base sheets with insul ation , with the fasteners having a 3" (7.6 cm) plate (Figure 2): A. Lap the base sheet 2" (5.1 cm). Screws and plates are t hen install ed in 3 staggered, equa lly spaced rows on 24" inch (61.0 cm) maximum centers in each row. One row is in the 2" (5.1 cm) side lap, the other rows are located equidistant from the lap rows approximately 12" -13" (30.5 -33.0 cm) from the lap rows . This pattern results in approximately one fastener per 2.1 square feet (0.20 m). Along bu ilding perimeters (minim um 4 foot wide) fastening pattern must be increased to one fastener per 1.2 square feet (0.11 m), in 4 staggered , equally spaced rows of fasteners on 18" (45.7 cm) centers. Note: When fastening base sheets using screws and plates without insulation or over Oens0ec1(41 boards, the plate must be of a desi gn that allows it to lie flat on the dec k. APP Torch Applied Systems 235 Figure 1 +: I I + -H t 9' 11 18' + 1i , • .J ,l, I 1 -H : 26'--+ +: + 1'-2·1ap 39 3/s" 0 0 0 Figure 2 0 0 0 !o I I I I I I I :o I I I I I I I I :o I I I I I 12"-13 " /1'\. * * 0 0 0 0 01 24 " Max. 0 0 0 0 8.04 Base/lnterply Sheets -Hot Asphalt Application-------- A. General The following applies to all GAFMC sheets, which may be used as ply sheets or base sheets (excluding Stratavenr Eliminator"' Perforated): Foot and machine traffic on freshly applied membranes with asphalt must be kept to a minimum to reduce the possibility of asphalt displacement du e to "po int applied'' pressure. The potential result is the creation of an area where the asphalt quantity may be too light to perform the required waterproofing or bonding function. Workmen must stand on the insulation, or deck side of the system and avoid traffic on the fresh ly laid membrane system for a long enough time to allow the asphalt to set up. Do not allow eq uipm ent over, or store materials on , the fresh ly laid membrane. Asphalt dispensing equipment must have balloon tires. B. For slopes under 3/4" per foot (6.2 cm per meter), Type Ill or IV asphalt can be used. Type IV must be used on all slopes 3/4" per foot (6.2 cm pe r meter) and greater. C. Asphalt shall be applied in a uniform layer, without voids, at a rate of 25 lb/square (1.2 kg/m2) ± 20%. See General Installation Requirements , Part 3 "Asphalt". D. Apply asphalt so that a small bead of asphalt shows at the edge of the membrane. Do not allow heavy flows of asphalt to extend beyond the membrane edge. Heavy, irregu lar surface flows of asphalt will make proper application of cap membrane difficult. E. In the event a wrinkle or a "fishmouth" forms during the application of the membrane, do not "walk It down" as the memory of the sheet or felt may cause it to reapp ear. Fishmouths or wrinkles shall be sliced open and patched with hot asphalt and additional membranes. Avoid cutting into the plies below the fishmouth or wrinkle by angling the knife blade to the side. F. Base plies must be installed with all side and end laps staggered and offset from previous plies with adjacent end laps a mi nimum of 18" (45.7 cm) apart. APP Torch Appl ied Systems 236 Base Sheet & Ply Felt Application Chart Recommended 2nd Full Widt h Sheet Follow ing Courses End Laps1 Starter Rolls Side Lap/Exposure Lap/Exposure RUBERO!~ Torch Smooth (Base 19-11/16" L ap 3" / Exp 36-3/8" Same 6" Sheet)* GAF GLAS® Base 19-11/16'' L ap 2" I Exp 37-3/8" Sheets* Same 4" One Ply 19-11 /16" Lap 2" / Exp 37-3/8" Same 6" GAFGLAS' F elt Two Ply 19-11 /16" I 39-3/8" L ap 21-11 /16" Lap 20-11 /16" 6" GAFGLAS' Felt Exp 17-11/16" Exp 18-11/16" Three Ply 13-1 /8", 26-1 /4", L ap 28-1/4" Lap 26-15/16" 6" GAF GLAS® F elt 39-3/8" Exp 11-1/8" E xp 12 -7/16" Four Ply 9-7/8", 19-11/16", L ap 31-1/2" Lap 30-1/16" 6" GAFGLAS® Felt 29-1 /2", 39-3/8" Exp 7-7/8'' Exp 9-5/16" *Where necessary to maintain offset between all p lies, base sheet and one ply starter rolls may be cut to narrower widths to maintain a suitable offset from succeeding courses. Refer to individual specification installation drawings. 1 All end laps must be staggered a minimum of 18" from adjacent or underlying courses 8.05 Strataven l® Elimin ator™ Perforated Base Sheet -------- Note: DO NOT torch apply RUBEROl [:)8 APP m embranes directly to Stratavenf' Eliminator"' Perforated Venting base sheet. At least one ply of GAF GLAS® #75 Base Sheet or two p lies of GAFGLAS® ply sheets MUST be hot mopped over the Strataven~ E liminator"' Perforated Venting base sheet before torch applying RUBEROI ~ APP membranes. A . Roll Stratave~ Eliminator"' Perforated Base Sheet out dry, granule surfaced down directly over EnergyGu ard"' Polyiso insulations, asphalt primed structural concrete roof decks, and selected DensDec~ roof boards. 8. For recover applications, Strataven? Perforated may be installed over prepared existing smooth built- up, or m ineral surfaced asphalt based roofing systems surfaced with conventional, fiberglass reinforced cap sheets or granule surfaced SBS modified b itumen memb ranes. C . Follow all recover recommendations and requirements contained in General Installation Requirements parts 2.03 and 2.04, Roof Design and F lashing Details sections of this man ual. D. Existing surfaces must be smooth, clean and dry. Existing granule surfaces must be determined to be in sou nd condition. Power brooming and power washing of the existing granule surfaces is required to remove all loose granules or dirt. After drying thoroughly, prime the existing surface with Matrix"' 307 Premium Asphalt Primer and allow to d(Y prior to installation of roofing materials. APP Torch Applied Systems 237 E. Lap base sheet 2" (5.1 cm) on the sides and 4" (10.2 cm) on the ends, with adjacent end laps a minimum of 18" (45.7 cm) apart. F. Install the subsequent system ply/plies in hot asphalt over the Stratavenf' Eliminator· Perforated Base Sheet. The hot asphalt used to install the subsequent ply/plies mopped ove r the surface of StratavenP Eliminator'" Perforated Base Sheet flows through the perforations to attach the base sheet and membrane system to the substrate. 8.06 RUBEROID ® APP Torch Membrane Application--------- A. Do not install RUBEROI D3 Torch grade membranes without careful review and impleme ntation of all relevant saf~ty and fire watch requirements including materials / combustible substrates review, LP-Gas equipment storage and handl in g guidelines, worker safety precautions and training. Refer to General Install ation Requirements, Part 1.06 Safety Considerations and Warnings for additional recommendations and safety precautions. B. The surface over which the membrane is to be in stalled must be clean, smooth, dry and prep ared in accordance with this specification manual. Do not apply RUBEROIIY Torch APP membranes directly to a fresh asphalt glaze or flood coat, or over base plies with excessive asphalt moppi ng bl eed out at laps. C. Do not install RUBERO!~ Torch APP membranes over base plies or materials installed with solvent based cold adhesives or mastics. D. For s lopes 3/4'' per foot (6.2 cm per meter) and over, RUBEROID®' T arch membranes must be run vertically, parallel to roof slope and back nailed in accord ance with General Installation Requirements Part 6, "Installation on Steep Slope 3/4" per foot and Over." For slopes less than 3/4" per foot {6.2 cm per meter), in stall cap sheet perpendicular to slope. E. Cap sheet application : Install full width cap sheets, lappi ng 3" (7.6 cm) on the sides and 6" (1 5.2 cm) on ends. Stagger adjacent end laps a minimum of 18" (45.7 cm) apart. All side and end laps must be staggered from underlying plies. F. Never apply RUBEROIIY Torch membranes by any method except welding with a propane torch or other equipment specif ically designed for application of APP modified bitumen. G. The coiled membrane must be unrolled approximately 1 O ft. (3 meters), a lig ned, t hen the propane torch flame applied uniformly across the exposed back su rface of t he membrane and lap areas until the compound reaches the proper application temperature and exhibits a slight sheen. Be sure that there is complete bum-off of release films where present on the underside of the rolls, membrane selvage edges or both surfaces as applicable. Avoid overheating which may result in damage to or improper adhesion of the membrane. (The 11ame shou ld be moved from side to side in the shape of an "L", applying about 75% of the heat to the membran e and 25% to the substrate or underlying plies including the lap area of the previously installed courses.) The membrane is slowly unrolled as heat is applied to ensure proper adhesion. When complete, re-roll the opposite end of the membrane a nd install in the same manner. H. A minimum 'J/8" (10 mm) asphalt flow-out must be obtained at all seam areas. Dry laps are not acceptabl e. To ensure the proper bead of bitumen at the seam areas, a GAFMC Roller may be used. Roller application sh ould fo ll ow behind the torch no more than 4 ft . (1 .2 m) nor less th an 3 ft. (0.9 1 m) to be sure that the membrane will be at t he proper temperature to produce proper flow. Hand rollers or "walking-in the seam" methods are also acceptable. Check all seams for full and uniform adhesion. Unad hered seams must be lifted with a heated trowel and resealed by lightly torching the seam area. I. Matching granu les may be broadcast into the modified bitumen bleed out at seams while hot to enhance the finished appearance of the membrane. It is not requi red for issuance of a GAFMC Guarantee . APP Torch Appli ed Systems 238 J . All end laps must be staggered a mini mum of 18H (45 .7 cm) so that no adjacent end laps coincide. If end laps fall in li ne or are not staggered the proper d istance, a full width of RUBEROI ~ Torch membrane must be installed over the end laps. End laps, flashing sheets and other sea ms fanned over granule surfaces require pre -heating of the top surface of the under1ying granu le surface membrane to a point where the granules just begin to sink into, and the modified bitumen co mpound comes up through the granules to ensure proper seam construction and adhesion. K. All laps must be parallel or perpendicular to the slope of the roof such that the flow of water is never aga inst the lap . L. APP membranes must not be applied during adverse weather or without precautionary measu res in temperatures below 45°F (7.2 °C}. Refer Part 11 fo r additional infonnation on Cold Weather Precautions. Part 9 -Flashing 9.01 General------------------- A. Refer to the construction detai ls in this manual which depict flashing requirements for typically encountered conditions. Install flashing materials as shown in the construction details. For RUBEROI D® APP Torch applied roof systems instal l only flashing const ructions that include APP Torch applied membrane. B. Base flashing constructions for 15 and 20 year RUBEROl rY APP Torch applied roof systems require a minimum two ply construction . Prior to installi ng the RUBER Ol rY flashing membrane, a backer ply must be installed extending the full height of the base flashing. C . Basic wood blocking anchorage recommendations are found in Factory Mutual Data Sheet 1-49. Th ese recommendations are required for Factory Mutual approved projects. D. All penetrations shou ld be at least 18" (45.7 om) from curbs, walls , and edges to provide for proper flashing. E. Install flas hing sheets starting at low points. F. Where indicated by GAF MC construction details. in sta ll base sheets and backer plies in Type Ill or IV hot asphalt. Maintain asphalt at EVT ± 25°F (13.9°G) for all base and ply sheets used in flash ing details. Never use solvent based flashing cements, adhesives, mastics and coatings in conjunction with RUBERO!~ Torch APP membranes. G. Prime all metal flashings and masonry surfaces with Matrix'" 307 Premium Asphalt Primer and allow to dry prior to installation of flash ing materials. H. Only use approved GAFMC and BMCA membranes in construction of flashin g detai ls. I. Do not use metal base flashing. Damage to the rooting system caused by metal base flashing is not the responsibility of GAFMC . J . Base flashing shou ld extend a m inimutn of 8" (20.3 cm), and a maximum of 24" (61 .0 cm) above the roof li ne. K. Comer membrane flashings, such as "bow ties" for outside comers and "footballs" for inside comers or other membrane reinforcements are required to ensure that base flashing comers are sealed at cant areas. Alternate method of the comer reinforcing: install a smooth Torch APP membrane reinforcem ent piece on the prepared comer substrate prior to final surfacing membrane. Refer to Fl ashing Detail section. Note: Mastic and fabric coursing is not an acceptable alternate for proper flashing and counterflashing details. APP Torch Applied Systems 239 9.02 Cant Strips and Wood Nailers------------- A. Cant strips 1. EnergyGuard'" perlite cant strips must be installed at the intersection of the roof and all walls , parapets, curbs, or transitions approaching 90° that are to be flashed . They shall be approximately 4" (10.2 cm) in horizontal and 4" (10.2 cm) in vertical dimension. The face of the cant shall have an incline of not more than 45 ° with the roof. 2. Wood cants shall be solid. Perlite based cant strips must comply with ASTM C-728. Do not use fiberboard cants for torch grade installations. Use solid wood cants when mechanical securement to cants Is required or when solid wood cants will help stabilize the vertical wood nailers at projections or expansion joint openings. 3. Masonry cants shall be integrally cast to the wall and deck. They shall be finished and prepared with the same care as the deck. The cant shall be constructed so that it provides a vertical offset equal in thickness to the roof insulation. 4. Metal cant or metal curb strips are not approved. 5. Cants shall always be installed on top of the roof insulation, or wood nailers. 6. Mechanically fasten cant where applicable. Otherwise, set in hot asphalt and install as shown in the Flashing Details section. Do not use solvent based cements or adhesives with RUBEROICY Torch grade membranes . 7. Neatly fit all joints and miters. B. Wood Nailers 1. Wood nailers must be 3 1/," {8.9 cm) minimum width or 1" (25 mm) wider than metal flange and minimum 1" (25 mm) thick and secure ly fastened to the deck. 2. Wood nailers shall be the same thickness as tapered edge strip or insulation . 3. For roof systems requiring perimeter venting , nailers shall be slotted. 9.03 Sheet Metal----------------- A. Metal should not be used as a component ,of base flashing. Because of the high coefficient of expansion of sheet metals and the large temperature changes that can be experienced on a roof, sheet metal or exposed metal components must be isolated from the waterproofing components of the roofing and flashing system as efficiently as possible to prevent the metal from splitting the membranes. GAFMC assumes no responsibility for damage to the rooting system caused by the movement of accessory metal. B. When it is unavoidable to use metal in the roofing system (i.e., lead flange at drains, gravel stops), wood nailers and insulation stops 1" (25 mm) wider than the metal flange, should be provided for metal flange securement. For RUBEROID' Torch APP roof systems, set metal flange in softened rnembranes (torch heated), and secure with fasteners of the same type metal as the flange. The metal flange is then sealed using the app licable construction detail to meet guarantee requirements. Metal accessories (gravel stops, counterflashing , etc.) should be 16 oz . (0.56 mm) copper, 24 gauge (0.71 rnm) galvanized or stainless steel, 2 1/1' to 4 lb (1 .1-1.8 kg) lead, or 0.032" (0.81 mm) alumin um. APP Torch Applied Systems 240 C. Fabricate and install all sheet metal materials as shown in applicable construction details. Refer to SMACNA (Sheet Metal and Ai r Conditioning Cont ractors National Association, Inc.) for guidance on sheet metal treatments not addressed in this Manual. D. Clean metal and apply asphalt prime r to all sheet metal surfaces that wi ll come into contact with asphalt or other bitum in ous materials; allow the primer adequate time to dry. Coat meta ls, which come into contact with each other, with bituminous paint, or other bituminous separating material. E. Use fastener types compatible with the sheet metal type . 1. Copper or lead-coated copp er: use copper or bronze fasteners. 2. Lead an d galvanized steel: use galvanized or cadmium-plated sheet fasteners. 3. Alum inum: use alumin um fasten ers. 4. Stainless stee l: use stainless steel fasteners . F. Metal counterflashing shall have a minimum 4" (10 .2 cm) face with a dri p lip. The bottom edge of the counterflashing shall cover the roofing membrane and/or base flashing by a min im um of 4" (10.2 cm). Metal counterflashing used fo r masonry walls, wooden wall s, or thro ug h wall metal flashings should be a two piece design to allow for installation and later removal. Metal counterflashings for stucco, EIFS, wood siding or similar mate ri als s:hould be designed to receive and set as a base for those materials, such as "Z ' type flashing, whi le providing for securement of separate metal counterflashing to cover base flashings. Metal end joints shall be lapped 3" (7.6 cm) or more _ Adequate fasteners must be provided to secure against wind fo rces. Skirt fasteners shall be watertight. G. Metal termination bars shal l be a minimum of 1/10" (3 mm) thick x 1" (25 mm ) wide with preformed sealant edge lap. Bar should have 1/4" (6 mm) x 3/8" (10 mm) slotted holes on 4" (10.2 cm) centers to facilitate mechanical anchorage. Note: Termination bars are not suitable in all base flashing and wall flashing conditions. Termination bars may only be used in conjunction with an appropriate counte rflashing extending a minimum of 4 " (10.2 cm) below the termination bar. H. Metal flanges for gravel stops, eave stri ps, and pitch pockets to be used in conjunction with roofing shall be primed (both sides). For RU BEROID' T arch APP roof systems, set metal flanges in softened memb ranes (to rch heated) and nail 4" (10.2 cm) o.c. to wood nai lers or insulation stops. All flanges shall be a minimu m of 3" (7 .6 cm). Th e gravel stop lip should be at least 3/4" (19 mm) high. Eave strip lips shall be at least 3/8" (10 mm) high . Provision must be made for securing the skirt to the face of the wal l. This may be wood nai ler strips for masonry and meta l construction. In al l cases, gravel stop and eave strip nailer should be faste ned to the deck or deck system with adequate resistance against wind forces. Provision must be made for securing the skirt to the face of the wall. This may be wood nailer strips for masonry and metal construction . In all cases , gravel stop and eave strip nailer should be fastened to the deck or deck system with adequate resistance against wind forces . I. Stacks shall have metal sleeve flashing a minimum of 8" (20.3 cm) high. Pitch pockets for brackets, supports, pad -eyes, etc., shall have a 4" (10.2 cm) minimum heig ht metal sleeve. J . On reroofing projects, provisions shall be made for reinstallation of existing sheet metal duct work, equipment, coping metal and counterf lashing removed in conjunction with the new work. _Also, provide for cleaning and repairing of existing defective sheet metal, and replacement of missing and irreparable sheet metal to match existing types. Light gauge sheet metal flashings which are incorporated into the RUBEROID' Torch grade roof system are not suitable for re-use and must be replaced with new material. APP Torch App lied Syst ems 241 K. Conduits and piping s uch as electrical and gas lines must be set on wood blocking or some other fonn of support. Wood blocking/supports must be set on doubler pads (an additional layer of the roof membrane). 9.04 RUBEROID ® Torch APP Flashing Membrane Application------ A. RUBEROloP Torch AP P membranes used for flashing material can only be installed using a propane torch or other equipment intended for heat weldable APP materials. B. Refer to the Flashing Details section in this manual. C. Wood curbs and walls must be covered with a layer of #75 Base sheet or backer ply of se lected two-ply flashing system and fastened 8" (20.3 cm) o.c. in all directions with approved fasteners with minimum 1" diameter or square caps. All vertical laps shall be 4" (10.2 cm). Base sheet or backer ply must extend out onto field of roof a minimum of 4" (1 0.cm) or as shown in applicable GAFMC construction detail. D. Backer plies installed over masonry or other non-nailable substrates in hot asphalt must be cut into manageable lengths to ensure adeq uate adhesion to cant strip and vertical surfaces without excessive voids . All vertical laps shall be 3" (7.6 cm ). Backer ply shall extend out onto field of roof as shown in applicable GAFMC construction detail. E. All membrane plies must be extended to 2" (5 .08 cm) above top of cant strip and cut off prior to installation of flashing pl ies. F. The finished ply of base flashing should be run vertically to provide a selvage edge that will aid in achieving proper adhesion at the vertical laps. The finished flashing ply shall extend out onto the field of the roof as shown in the applicable GAFMC construction detai l, and must be extended a minimum of 4" (10.2 cm) beyond the edge of the prior flashing plies. The flashing must be soundly adhered to the parapet, cant area and roof surface to result in a minimum void non-bridging construction. G. Vertical laps tor RUBEROl[)!I Torch APP membranes shall be 3" (7 .6 cm.). If the sheet is run horizontally or where laps must be constructed onto granule surfaces, the vertical laps must be a minimum of 6" (15.2 cm). Horizontal applications also require trimming of al l exposed membrane selvage edges or installation in a manner that insures all selvage edge is fully covered by a su itable metal or approved counterflashing. H. Torch Method Application: 1. Measure and cut RUBEROIIY Torch APP membrane into the required le ngths. 2. Apply the propane torch flame uniformly across the back surface of the membrane and lap areas until the compou nd reaches the proper application temperatu re and exhibits a slight sheen. Be careful during application to ensure the complete bum-off of release films where p resent on the underside of the rolls, membrane selvage edges or both surfaces as applicable. Avoid overheating which may result in damage to or improper adhesion of the membrane. {The flame shou ld be moved from side to side in the shape of an "L", applying about 75% of the heat to the membrane and 25% to the substrate or underlying plies including the lap area of the previously installed courses.) The membrane is slowly unrolled as heat is applied to ensure proper ad hesion. Immediately nail the top of the flashing as specified in flashing detail to prevent slippage. 3. Membrane flashing sheets may be either back torched and set into posi tion, or rolled and_ torched into position as the flashing sheet is uncoiled. Flashing sheets must be carefully pressed into place to ensure full adhesion to the substrate and backer plies. Laps must be rolled or pressed to ensure proper seaming with a minimum 3/8" (10 mm) bead of bitumen at all seams. APP Torch App li ed Systems 242 I. All base flashings to rooftop curbs, parapet walls and other vertical surfaces require positive mechanical attachment along the top edge of the completed flashing. As indicated in the applicable flashing detail, vertical flashings shall be secured with mechanical fasteners approved by GAFMC 8" o.c. (20.3 cm) up to 1i' (30.5 cm) above the finished roof, and 4" (10.2 cm) o.c. for flashing heights up to 24" (61 cm). J . Install metal or other suitable counterflashing to extend a minimum of 4" (10.2 cm) below the top edge of the installed and fastened base flashings. Part 1 O - Surfac ing 10.01 General A. lhstall all surfacing to provide proper membrane, wind uplift and fire protection as requi red by GAFMC in conjunction with local code, insu ran ce ahd project requ irements. B, Surfacing weights must be considered when determining the load capacity of the structural support system's ability to handle the completed roof installation and other expected loads. GAFMC is not responsible for determining load capacities, and recom mends that a certified professional make any determ in ation relative to load bearing capacity of a structure. C. RUBEROI~ Torch Smooth membrane is not covered with factory applied surfacing granules and when used as the finish ply, may receive protective surfacing after completion. The membrane should weather a minimum of 30 days prior to applying any type of surfacing. The membrane must be cleaned and prepared prior to surfacing installation. D. RUBERO l[)?l Torch APP membranes with factory applied granule surfacing do not require additional surfacing materials. Do not use liquid surface coatings over these membranes when new. E. GAFMC shall not be liable or responsible for ballast and paver surfacing systems. 10.02 Coatings ------------------- A. High quality GAFMC TOPCOAT" and Matrix"' roof coatings can be used for surfacing of granule and smooth surfaced RUBEROl[)?l Torch APP membranes after completion of a minimum 30 day weathering period. Selected coating must be compatible with the RUBEROID' membrane. Contact GAFMC Technical Services for further information. B. Root coatings are a maintenance item that require periodic re-applicatio~ for best performance. ~AFMC assumes no responsibi lity for the performance or maintenance of reflective o'. other surface coatings except as provided for under specific published GAFMC guarantee or authonzed guarantee addendum . 10.03 Gravel and Asphalt ---------------- A. GAFMC does not permit gravel surfacing of RUBERO!~ Torch roof membrane systems on slopes greater than 1 inch per foot (8.3 cm per meter). B. Not less than 400 lb/square (195 kg/m2) of gravel or 300 lb/square (14.6 kg/m2 ) of slag shall be applied in a flood coat of 60 lb/square (2.9 kg/m2) of hot asphalt. 1. Gravel at the time of application shall be hard, durable, opaque and free of clay, loam, sand or other foreign substances and comply with ASTM D 1863. c . Asphalt shall conform to the la1est revision of ASTM D 312. ASTM D 312 Type III bor IV adsphalt 1 may bet used on slopes up to 3/4" per foot (6.2 cm per meter). ASTM D 312 Type IV must e use on s opes o 3/4" per foot (6.2 cm per meter) or greater. APP Torch Applied Systems 243 D. No more asphalt shall be applied at one time than can be immediately covered with gravel or slag . 10 .03 Walkways------------------ A. Walkways for normal rooftop traffic can be constructed from one or more layers of RUBERO l[)-"J Torch grade membrane. These types of walkways are not intended for plaza deck or patio-type use. B. For normal to moderate traffic conditions torch apply one layer of RUBEROl[)-"J Torch Granule membrane over the completed field plies prior to application of final surfacing. C. For heavier traffic conditions such as around rooftop equipment, hatches and doorways, a two ply walkpad can be constructed from RUBEROI D-Torch Grade membranes with the use of an additional layer of Torch Smooth as the first ply in the walkpad assembly. D. Walkway sections should be no longer than 10' (3 m), with a 6" (15.2 mm) minimum gap between each section to allow for drainage. E. Surface the roof area around and between the walkway sections if additional surfacing is added to the completed membrane. Part 11 -Cold Weather Application Precautions A. In cooler weather, unrolling and relaxing modified bitumen rolls and base sheet rolls prior to installation will reduce the potential for wrin kl es to foTTTI ih the finished roof . The rolls can be cut into shorter lengths for easier handling when rerolling and insta lling. B. Special care is required when installing GAFMC roof membranes at temperatures below 45°F (7.2 °C): 1. The roof substrate must be dry. There must be no ice, dew or water. 2. All membrane rolls , adhesives and coatings must be stored for at least overnight at a minimum temperature of 55°F (12.8°C) prior to their appl ication. All wate r-based coatings must be protected from freezi ng at all times. 3. Remove rolls from the heated storage only as they are being installed. Install membrane rolls immediate ly after removal from storage to avoid membrane cooling. Modified rolls must be at least 45°F (7 .2°C) at time of application. 4. For non-modified glass felts, the asphalt temperature at point of application must be maintained at the asphalt's EVT ±25°F (13.9 °C). The use of insulated asphalt handling equipment is recommended in cold weather. Do not overheat the asphalt to try to offset the cold ambient temperature. If the proper asphalt application temperature can not be consistently maintained , roofing must be discontinued. Be aware that cool, windy conditions wi ll cause asphalt heat loss to occur at a rate equivalent to a lower ambient temperature. For mop applied SBS membranes, the asphalt temperature at point of application must be maintained at the asphalt's EVT or 42.5°F (218°C) whichever is greater with a rolling bank (puddle ) of mopping asphalt across the full width of the roll . 5. Mopping must not precede the roll by more th an f Ive feet. 6. If insulation is being set in mopping asphalt, it must be set quickly while the asphalt is still hot and fluid. Use the minimum insulation size available. At no time should boards larger than 4' x 4' (1.22 m x 1.22 m) be set in hot asphalt. 7. Do not overheat RUBEROI~ Torch Grade rolls to compensate for cold ambient temperatures. APP To rch Applied Systems 244 ROOF20-0067 Updated 10/9/18 Building Permit Application ==,-~! City of Atlantic Beach Building Department 800 Sem in o l e Roa d , Atl a ntic Beac h, FL 32 233 Phone : (904) 24 7-5826 Email : Bu ilding-Dept@coab.us .. ALL I NFORMATION HIGHLIGHTED IN GRAY IS REQUIRED. Job Address: ]fo5 P/az.o. Permit Number: ___________ _ Legal Description Res Lt> 3-J rroi:t:S perti\/ 3o-Go 3 ~~-.;1,,. RE# 111 I I 19 --0000 Valuation of Work (Replacement Cost)$ {,1 ] 30, ~ Heated/Cooled SF _____ Non-Heat ed /Cooled ____ _ • Class of Work: □New □Addition □Alteration ~epai r □Move □Demo □Pool □Window/Door • Use of existing/proposed structure(s): □Commercial IZIResidential • If an existing structure, is a fire sprinkler system installed?: □Yes liiNo • Will treefsl be removed in association w ith orooosed oroiect? □Yes (must submit seo arat e Tree Removal Permit\ 13No Descri be in detail the type of work to be performed: t<, e-roof" J 3ss:s pla+ Florida Product Approval# F L ~5 3 3-R, 2 3 for multiple products use product approval form Plu.z.g Phone YI 3-5 ;;l.3 -.6 3 .::l.;).. f Attorney or Agency Letter Required) ___________________ _ .t:t:~~~~~Soc::d;:~lf-JJ._..1:li!2a!IQdei!I Qualifying Agent B, ~o C\ \ ,f Cw ec ,__.......,_.~~'"'---:~~';::;-;,,,,=--;--------City 6.A-OY"\:t' I\ l State f' \ 1 Zip ~~\ l 0 Job Si~e Contact Number ~~~::?bL State Certification/Registration# ~.___,_....,<=--=:;;:a,,--E-Mail pcoWP S{SNf> Liu_ ½~!.CID Architect Name & Phone# ________________ J _______ -=------------- Engineer's Name & Phone #---,------~----...-----------------+---,1-=---.,---- Workers Compensation Insurer • • OR Exempt o Expirati on Date -.L../-...&...,l-'-"e.>,,,,<;l.£::.1--- Applica t ion is hereby made to obtain a permit to do the work and installatio s as indicated. I certify that no work r installation has commenced prior to the Issuance of a permit and that all work will be performed to meet the standards of all the laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS, and AIR CONDITIONERS, etc. NOT ICE: In addition to the requirements of this permit, there may be additional restrictions a pplicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECO RD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAVING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING 1 CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDIN ~~~.:~NCEMENT. ~~I Signed and sworn to (or affirmed ~ C---"l'"'-'-'11~ by -'-:-:-~"':'-lrt"-_...._....,____;.~......__ ( I Personal ly Known OR (~roduced ldentificati Type of Identification: -4"9,=:;i:~~'r-~"-""!I.I.I..OC'""'-"=......,....._➔_ RO O F 2 0 - 0 0 6 7 PR O D U C T AP P R O V A L IN F O R M A T I O N SH E E T FO R TH E CI T Y OF AT L A N T I C BE A C H , FLORIDA (*REQUIRED) *P r o j e c t Ad d r e s s : _7 _ 6 _ 5 _ P _ l a _ , z _a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Pe r m i t # : _ _ _ _ _ _ _ _ _ _ _ *O w n e r /P r o je c t Na m e : r f ~ ~ h & Co r a Fo r n e y As re q u i r e d by Fl o r i d a St a t u t e 55 3 .84 2 an d Fl o r i d a Ad m i n i st r a t i v e Co d e Ru l e 98 - 7 2 , pl e a s e pr o v i d e th e i nf o r m a ti o n an d pr o d u c t approval number(s ) for th e bu i l d i ng c om p o n e n ts li s t e d be l o w as ap p l i c a b l e t o th e bu il di n g co n s t r u c t i o n pr o j e c t fo r th e pe r m i t nu m b e r li st e d ab o v e . Y ou s hould contact your pr o d u c t s up p l i e r i f yo u do no t kn o w th e pr o d u c t ap p r o v a l n u mb e r fo r an y o f th e ap p l i c a b l e l is t e d p ro du c t s. In f o r m a t i o n re g a r d i n g s tatewide product ap p r o v a l ma y be ob t a i ne d at : w w w .fl o r i d a b u i l d i n g . o r g . Ca t e g o r y / S u b c a t e g o r y Ma n u f a c t u r e r Pr o d u c t De s c r i p t i o n Li m i t a t i o n of Us e St a t e # Local# A. EX T E R I O R DO O R S 1 . Sw i ng i n g 2. Sl i d i n g 3 . Se c t i o n a l 4 . Ga r a ge Ro l l -Up 5 . Au t o m a t i c 6 . Ot h e r B. WI N D O W S 1. S i ng l e hu n g 2 . Ho r i z o n t a l sl i d e r 3 . Ca s em e n t 4 . Do u b l e hu n g 5 . F i xe d 6 . Aw n i n g 7 . Pa ss -t h r o u gh 8. Pr o j e c t e d 9. Mu l l i o n 10 . Wi n d br e a k e r 11 . Du a l ac t i o n 1 2 . 0 t h e r P ag e 1 of 4 Updated 1 0 /1 7/18 Ca t e g o r y / S u b c a t e g o r y Ma n u f a c t u r e r Pr o d u c t De s c r i p t i o n Li m i t a t i o n o f Us e St a t e # Local# C. PA N E L WA L L 1 . S i di n g 2 . So f f r t s 3 . EI F S 4 . St o r e f r o n t s 5. Cu r t a i n wa l l s 6. Wa l l lo u v e r s 7 . Gl a s s bl o c k 8 . Me m b r a n e 9 . Gr e e n h o u s e 10 . Sy n t h e t i c st u c c o 11 . Ot h e r D. RO O F I N G PR O D U C T S 1 . As p h a l t sh i n g l e s r e r- - + - < . u · n + -l e_ p f Y'r l o d; / ; .P ti 'f 3 ·+t . t r n er ' , iY L .; ? 5 ~ 3 - r ~:~ 2 . Un d e r l a y m e n t s 1 - - 3 . Ro o f i n g fa s t e n e r s 4 . No n s t r u c t u r a l me t a l ro o f 5 . Bu i lt -up ro o f i n g 6 . Mo d i f i e d bi t u m e n 7 . S i ng l e pl y ro o f i n g 8 . Ro o f i n g ti l e s 9 . Ro o f i n g in s u l a t i on 10 . Wa t e r p r o o f i n g 11 . Wo o d sh i ng l e s / s h a k e s 12 . Ro o f i n g sl a t e 13 . Li q u i d ap p l i e d ro o f i n g 14 . Ce m e n t - a d h e s iv e co a t s 15 . Ro o f ti l e ad h e s i v e 16 . Sp r a y ap p l i e d po l y u r e t h a n e ro o f 17 . Ot h e r Page 2 of 4 Updated 10/17/18 In ad d i t i o n to co m p l e t i n g th e ab o v e li s t o f ma nu f a ct u r e r s , pr o d u c t de s c r i p t i o n an d St a t e ap p r o v a l nu m b e r fo r th e pr o d u c t s used on this project, the Co n t r a c t o r sh a l l ma i n t a i n on th e jo b si t e an d av a i l a b l e t o th e In sp e c t o r , a le g i b t e co p y o f ea c h ma n u f a c t u r e r ' s pr i n t e d sp e c i f i c a t i o n s and installat i on in s t r u c t i o n s al o n g wi t h th i s Pr o d u c t Ap p r o v a l Sh e e t . I ce r t i f y th a t th i s pr o d u c t ap p r o v a l li s t is tr u e an d co r r e c t t o th e be s t o f m y kn o w l e d g e . I fu r t h e r ce r t i f y th a t us e o f di f f e r e n t components other than the on e s li s t e d in th i s do c u m e n t mu s t be ap p r o v e d by th e Bu i ld in g Of f i c i a l . *C o n t r a c t o r Na m e (P r i n t Na m e ) : . _ R _ y _ a _ n _ L _ e _ C _ u _ y _ e _ r _ _ _ _ _ _ _ _ *C o n t r a c t o r Si g n a t u r e : _ _ _ _ ; Z ::.. . . . . . _ 0 , i _. c , _ - 7 " ' ' - + - - - - 1 . : : = - - ~ - - - - - - - - *C o m p a n y Na m e : P r o g r e s s i v e R o o i n g & R e m o d e l ~ *M a i l i n g A d d r e s s : _P _ O _ B _ O _ X _ 1 _6 _0 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ *C i t y : B u n n e l l *S t a t e : _F _L _ _ _ _ _ _ _ _ *Z i p Co d e : _3 _ 2 _ 1 _ 1 _ 0 _ _ _ _ _ _ _ _ _ _ *T e l e p h o n e Nu m b e r : _(3 _ 8 _ 6 _ ) _ 5 _ 6 _ 9 _ - 3 _ 7 _ 6 _ 8 _ _ _ _ _ _ _ *E - m a i l Ad d r e s s : p r o g r e s s i v e r r @ y a h o o . c o m Ce l l Ph o n e Nu m b e r : (3 8 6 ) 33 8 - 8 9 7 6 Fa x Nu m b e r : - - - - - - - - - - - - - - - - - - - - - - - -Page 4 of 4 Updated 10/17/18 8 N E M 0 1 e t c . - - - . T A B L E 7 A _ : R E C O ~ E R A P P L I C A T t < ? N S : - _ - _ S Y S T E r y 1 T Y ! E A - 1 : _ B O N O E D I N S U L A T I O N , B O N D E D R O O F C O V E R ~ - j System Substrate (Notes 1 & 12) B a s e I n s u l a t i o n L a y e r T o p I n s u l a t i o n L a y e r R o o f C o v e r ( N o t e 1 S ) M D P No. T y p e A t t a c h T y - p e A t t i i c h B a s e P l y c . a p ( p s f ) * R-23 Existing fully bonded BUR or M i n . 0 . 2 5 - i n c h S E C U R O C K G y p s u m - H A N o n e N / A S B S - S A - H ( O p t i o n a l ) S B S - A A , S B S - A A , S B S - · 1 0 5 . 0 modified bitumen roof cover F i b e r R o o f B o a r d S B S - T A , A P P - T A T A , A P P - T A R-24 Existing fully bonded, smooth M i n . 0 . 2 5 - i n c h S E C U R O C K G y p s u m - A · P D , 6 - N o n e N / A S B S - S A - H ( O p t i o n a l ) S B S - A A , S B S - A A , S B S - - 1 0 S . O surface BUR or modified bitu m e n F i b e r R o o f B o a r d i n c h o . c . S B S - T A , A P P - T A T A , A P P - T A R-25 Existing fully bonded, mineral M i n . 0 . 2 5 - i n c h S E C U R O C K G y p s u m - A - P O , 6 - N o n e N / A S B S - S A - H ( O p t i o n a l ) S B S - A A , S B S - A A , S B S - - 1 8 0 . 0 surface modified bitumen f i b e r R o o f B o a r d i n c h o . c . S B S - T A , A P P - T A T A , A P P - T A Existing fully bonded, smooth - o r M i n . 0 . 2 5 - i n c h S E C U R O C K G y p s u m - ( O p t i o n a l ) S 8 5 - A A , S B S - A A , S B S - R-26 granule-surface BUR or modif i e d M - P G l N o n e N / A S B S · S A · H · 1 8 0 . 0 bitumen F i b e r R o o f B o a r d S B S - T A , A P P · T A T A . A P P - T A Existing fully bonded, smooth - o r M i n . 0 . 2 5 - i n c h S E C U R O C K G y p s u m - ( O p t i o n a l ) S B S - A A , S B S - A A , 5 8 S - R-27 granule-surface BUR or modif i e d 0 B 5 0 0 N o n e N / A S B S - S A - H - U O . O bitumen F i b e r R o o f B o a r d S 8 5 - T A , A P P - T A T A , A P P - T A Existing fully bonded, smooth - o r M i n . 0 . 2 5 - l n c h S E C U R O C K G y p s u m - I C P ( O p t i o n a l ) S B S - A A , S B S - A A , S B S - R-28 granule•surface BUR or granu l e - B O A R D - N o n e N / A S B S - S A - H - 1 9 S . O surface modified bitumen F i b e r R o o f B o a r d M A X S B S - T A , A P P - T A T A , A P P - T A Existing fully bonded, smooth - o r M i n . 0 . 2 5 - i n c h S E C U R O C K G y p s u m - ( O p t i o n a l ) 5 8 5 - A A , S 8 5 - A A , S B S - R-29 granule-surface BUR or modff i e d C R - 2 0 N o n e N / A S B S - S A - H - 1 9 5 . 0 bitumen F i b e r R o o f B o a r d S B S - T A , A P P - T A T A , A P P - T A CoHVENTIOMAI. SYSTtMS: Existing fully bonded BUR or O . S - i n c h S t r u c t o d e k H i g h D e n s i t y B P - A A , S B S - ( O p t i o n a l ) B P - A A , S B S · A A , S B S - R-30 F i b e r b o a r d o r m i n . 0 . 7 5 - i n c h F e s c o H A N o n e N / A S B S - A A , S B S - T A o r - 1 0 5 . 0 modified bitumen roof.cover B o a r d ( h o m o g e n e o u s ) A A A P P - T A T A o r A P P - T A Existing fully bonded BUR or 0 . 2 5 - i n c h D e n s D e c k , D e n s D e c k B P - A A , S B S - ( O p t i o n a l ) B P - A A , S B S - A A , S B S - R-31 P r i m e o r S E C U R O C K G y p s u m - F i b e r H A N o n e N / A A A , S B S - T A S B S - A A , S B S - T A o r - 1 0 S . O modified bitumen roof cover R o o f B o a r d o r A P P - T A A P P - T A T A o r A P P - T A M i n . L S - i n c h A C F o a m I I , F l i n t B o a r d M i n . 0 . 5 - i n c h S t r u c t o d e k H i g h ( O p t i o n a l ) B P - A A , R-32 Existing fully bonded BUR or I S O , E N R G Y 3 , H - S h i e l d o r M u l t i - M a x H A D e n s i t y F i b e r b o a r d , M i n . 0 . 7 5 - i n c h H A B P - M o r S B S - A A , S B S - T A o r S S S - A A , S B S . modified bitumen roof cover F e s c o B o a r d ( h o m o g e n e o u s ) o r M i n . S B S . A A T A o r A P P - T A - 1 0 5 . 0 F A 3 0 . 5 - i n c h O u r a B o a r d ( h o m o g e n e o u s ) A P P - T A Existing fully bonded BUR or M i n . 1 . 5 - i n c h A C F o a m 1 1 , F l i n t B o a r d M i n . 0 . 2 5 - i n c h S E C U R O C K G y p s u m - B P - A A , S B S - ( O p t i o n a l ) B P - A A , S B S - A A , S B S - R-33 modified bitumen roof cover I S O , E N R G Y 3 , H - S h i e l d o r M u l t i - M a x H A F i b e r R o o f B o a r d , D e n s D e c k , D e n s H A A A , S 8 S - T A S B S - A A , S B S - T A o r T A o r A P P - T A - 1 0 5 . 0 F A 3 D e c k P r i m e o r A P P - T A A P P - T A Existing fully bonded, smooth M i n . 0 . 5 - i n c h S t r u c t o d e k H i g h A - P D , 6 - B P - A A , S B S · ( O p t i o n a l ) B P - A A , S B S - A A , S B S - R-34 N o n e N / A S B S - A A , S B S - T A o r - 1 0 5 . 0 surface BUR or modified bitu m e n D e n s i t y F i b e r b o a r d i n c h o . c . . A A T A o r A P P - T A A P P - T A Existing fully bonded, mineral M i n . 0 . 5 - i n c h S t r u c t o d e k H i g h A · P D , 6 - B P - A A , S B S - ( O p t i o n a l ) B P - A A , S 8 5 - A A , S B S · R-35 N o n e N / A S B S - A A , S B S - T A o r - 1 8 0 . 0 surface modified bitumen D e n s i t y F i b e r b o a r d i n c h o . c . A A T A o r A P P - T A A P P - T A NEMO ETC, LLC E v a l u a t i o n R e p o r t 3 5 2 0 . 0 3 . 0 4 - R 2 4 f o r F l 2 5 3 3 - R 2 3 Certificate of Authorization #32455 & ' " E D I T I O N ( 2 0 1 7 ) F B C N O N - H V H Z E V A L U A T I O N R e v i s i o n 2 4 : 0 6 / 2 0 / 2 0 1 9 Prepared by: Robert Nieminen, PE-59166 C e r t a i n T e e d F l i n t l a s t i c • M o d i f i e d B i t u m e n R o o f S y s t e m s ; ( 6 1 0 ) 6 5 1 - 5 8 4 7 A p p e n d i x 1 , P a g e 6 3 o f 6 7