Loading...
306 2nd st HVAC 2013 CITY OF ATLANTIC BEACH j 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 INSPECTION PHONE LINE 247-5814 Application Number . . . . . 13-00003434 Date 9/24/13 Property Address . . . . . . 306 2ND ST Application type description MECHANICAL HVAC ONLY Property Zoning . . . . . . . RES SF DISTRICT Application valuation . . . . 0 ---------------------------------------------------------------------------- Application desc 1 cu 1 ahu ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ MORTON WILLIAM K ET AL DONALD CARTER PLUMBING INC 961 LEW BLVD P O BOX 735 ST.AUGUSTINE FL 320805462 CALLAHAN FL 32011 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL HVAC PERMIT Additional desc . . Permit Fee . . . . 91 . 00 Plan Check Fee . 00 Issue Date . . . . Valuation . . . . 0 Expiration Date . . 3/23/14 ---------------------------------------------------------------------------- Other Fees . . . . . . . . . STATE MECH DCA SURCHARGE 2 . 00 STATE MECH DBPR SURCHARGE 2 . 00 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 91 . 00 91 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Other Fee Total 4 . 00 4 . 00 . 00 . 00 Grand Total 95 . 00 95 . 00 . 00 . 00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. MECHANICAL PERMIT APPLICATION CITY OF ATLANTIC BEACH 800 Seminole Rd Atlantic Beach, FL 32233 Ph (904) 247-5826 Fax (904) 247-5845 fOB ADDRESS: �U& ST PERMIT# PROJECT VALUE $ 3Z.00 `eo ARI# 5 1-7 1 9 0'2- REQUIRED _Air Handling Equipment Only Air Handling Unit & Condenser Condenser Only STEW AIR CONDITIONING & HEATING SYSTEM INSTALLATION Air Conditioning: Unit Quantity Tons Per Unit _ _ Heat: Unit Quantity— BTU's Per Unit _ Seer Rating , Duct Systems: Total CFM REQUIRED ZEPLACEMENT AIR CONDITIONING & HEATING SYSTEM INSTALLATION Air Conditioning: Unit Quantity f Tons Per Unit 2- Heat: Unit Quantity I BTU's Per Unit Zy_v� Seer Rating Duct Systems: Total CFM REQUIRED +IRE PREVENTION Fire Sprinkler System Quantity (Requires 3 sets of plans) Fire Standpipe Quantity (Requires 3 sets of plans) Underground Fire Main Value (Requires 3 sets of plans) Fire Hose Cabinets Quantity (Requires 3 sets of plans) Commercial Hoods Quantity (Requires 3 sets of plans) Fire Suppression Systems Quantity (Requires 3 sets of plans) +IRE PLACES MISCELLANEOUS: Prefabricated Fireplace Qty Automobile Lifts Gas Piping Outlets Boilers BTU's Elevators/Escalators ALL OTHER GAS PIPING Heat Exchanger Quantity of Outlets Pumps # Vented Wall Furnaces Refrigerator Condenser BTU's # Water Heaters Solar Collection Systems Tanks (gallons) Wells )THER: ermit becomes void if work does not commence within a six month period or work is suspended or abandoned for six months.I hereby certify that I have read its application and know the same to be true and correct. All provisions of laws and ordinances governing this work will be complied with whether specified or ot. The permit does not give authority to violate the provisions of any other state or local law regulation construction or the performance of construction. 'roperty Owners Name� Phone Number 7_0 ✓lechanical Company '„I wn n r" Office Phone2111 31 K5 Fax 24 t 37q S ;o. Address: ��S L City 3�X CA- State Zip32 1 SO License Holder(Print): State Certification/Registration# CAU 39 Notarized Signature of License HolderD �---- �i ;.,, RICHARD TOMPKINS Before me this 2 3 day of 20 Commission#FF 040399 =; azz Expires July 29,2017 Bonded ThmTroy Fain inswame8WiW7019 Signature of Notary Public t Job: + wrightsoft Project Summary Date: September 20,2013 Entire House By: Aaron Thacker Donovan Heat&Air 315 6th Ave S, Jacksonville Beach, FL 32250 Phone 904-241-3785 Fax:904241-3745 Email:aaron@donownac.com Web:www.DonovarLAC.com For: Bill Morton 306 2nd St,Atlantic Beach, FL 32233 Notes: Design Information Weather: Jacksonville Mayport Naval, FL, US Winter Design Conditions Summer Design Conditions Outside db 39 OF Outside db 99 OF Inside db 70 OF Inside db 75 OF Design TD 31 OF Design TD 24 OF Daily range L Relative humidity 50 Moisture difference 69 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 10754 Btuh Structure 9911 Btuh Ducts 1856 Btuh Ducts 3243 Btuh Central vent(0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 12610 Btuh Use manufacturer's data n Rate/swing multiplier 1.04 Infiltration Equipment sensible load 13680 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average 241 Btuh Fireplaces 0 Structure 2241 Ducts 9W Btuh Heating Cooling Central vent(0 cfm) 0 Btuh Area (ft') 1140 1140 Equipment latent load 3158 Btuh Volume (ft') 9120 9120 Air changes/hour 0.45 0.23 Equipment total load 16838 Btuh Equiv.AVF (cfm) 68 35 Req. total capacity at 0.70 SHR 1.6 ton Heating Equipment Summary Cooling Equipment Summary Make Tempstar Make Tempstar Trade 13 SEER N SERIES R41 OA HP Trade 13 SEER N Cond N4H324A(G)KARIES R41 OA HP Model N4H324A(G)KA` Coil FEM4P24"A AHRI ref no3853298 AHRI ref no3853298 Efficiency 8 HSPF Efficiency 11.0 EER, 13 SEER Heating input Sensible cooling 15820 Btuh Heating output 23000 Btuh @ 47°F Latent cooling 6780 Btuh Temperature rise 28 °F Total cooling 22600 Btuh Actual air flow 753 cfm Actual air flow 753 cfm Air flow factor 0.060 cfm/Btuh Air flow factor 0.057 cfm/Btuh 0 in H2O Static pressure 0 in H2O Static pressure Space thermostat Load sensible heat ratio 0.81 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. 2013-Sep-23 07:35:55 ' wrightsoft Right-Suite®Universal 8.0 24 RSU05995 Page 1 r' C;l'` C:\Users\Owner\Documents\Wrightsoft MVAC\Bogus 2 ton.rup Calc=MJ8 Front Door faces W