Loading...
Exh 8FAGENDA ITEM NO._~~ COMMISSION MEETING DATE:_ 9- /3' ~I9 Q:I'TY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Tresca Property change order-extend boardwalk leading to the canoe launch 30 additional feet at a cost of $3,070. SiJBMITTED Bl~: Tnnmy Johnson, Recreation Director DATE: September. 9, 1999 BACKGROUND: On Janua~.y 25, 1999, the City Commission award bid number 9899- 7-Constnuction ofthe Tresca Property to ABBA Construction Inc. AI3BA has installed the crushed shell, parking area, and 50% of the boardwall'{. After reviewing the plans and measuring the ~~rea fc-r the canoe launch, the Contractor informed us that the canoe launch fell 30 feet short of the water.. Because of the tide the current design would allow limited access to the; water and the proposed 30 foot extension would allow far greater access. ABBA Construction has given us a change order proposal to extend the boardwalk leading to the canoe launch. The funds for this change order will come from account number. 300-0000- 5 72-5300 (Improvements other than Building). RECOMMENDATION: Approve proposed change order to extend the boardwalk leading to th.e canoe launch at the Tresca Property 30 feet in the amount of $3,070. ATTACHMENTS: ABBA Construction change order proposal REVIEWED BY CITY MAN.AGER:_ A-.BBA CONSTRUCTION, INC. 6959-1 Phill'.ips Pkwy Dr S., Jacksonville, FL 32256 Ph. # (904)886-2990 Fax # (904)886-7036 i~, Change Order Proposal Date:8/=~ 0/99 Submitted To:City of Atlantic Beach Job Site: TRESCA PARK. 716 Ocean Boulevard Atlantic BE:ach, Florida 322.33 Contact: Timmy Jotmson Ph.. #904-247-5828 Fax #904-247-5849 Description of Work ABBA Construction has installed the cn.lsh shell path per the plans and has come up with situation that needs to be rectified inunE:diately. The (~:anoe Launch will fall short of reaching the waters edge by 30' feet. ABBA is proposing to lengthen the boardwalk the additional 30' inorder to reach the waters ecjge for; l.) $ 3,070.00 2,) An Additional 5 days i.s al<io being requested for the completion of this work t a Owner/Buyer agFees to pay Contra<or f<tr all labor„ material and services to be fumishad by Contractor to OKnzrBuyer, under tl~e terms ofthis Contract. ALL FOR THE SUM OF:ThI•ee th.ous~and seve;nt3~ dollars and no cents ($ 3,070.00) DEPOSIT: N/A BALANCE DUE DATE:Upon Invoice All wterial ss gnarmteed to be as specified. A11 wotlt to be coatpleted is a workmaalt~e moaner according to staadard practices, Aay ahrntion or deviation from about specifications iavolviag extra costs will Ix executed only upm written orders, with th.e exception of aay hidden damage that must be repaired to wmpiete wort and wi1S become an extra charge over and above the estimate. 'Ibis proposal subject to acceptance within 30 days cad is void thereafter at the option of the mdersigned. Signature of Sales Representative Acceptance of Proposal Date The above prices, specifications and conditions are hereby accepted. You arc authorized to do the work as specified. Payment ~~~ill be made as outlined above <lnd on the Term:; and Conditions listed on the next page of this document. ACCEPTED: Signature Date Signature `__~___`_„_ Date ~`wv R1dg. l.ic #CBCOJ5703 General Con. Lict{~C'GC023789 Underground Uti1 Lit !lCUC0568d 1 RaajLic CCCO-169a'a