Loading...
1730 Ocean Grove Drive TREE08-00100011 Staff Time 05.19.20081730 Ocean Grove Staff Time on Tree Permitting DATE TASK TIME RATE EXTENDED 11/6/2007 review of preliminary tree survey submitted by applicant (Phillips) to determine if permit required, response (only trees from interior, all under 20") 0.50 $30.81 $15.41 12/20/2007 email to plan review staff informing them, based on plan submitted,tree removal permit will be required 0.50 $30.81 $15.41 1/8/2008 request from PW for copy of tree removal/protection plan; informed PW nothing had been received; PW Director noted requirement on plan review notes to applicant (Altenbach) 0.50 $30.81 $15.41 1/9/2008 staff filled in application with information from preliminary survey, COJPA info, and submitted via email to applicant (Altenbach) along with instructions for completing the application, completing a formal tree survey, and preparing the site for inspection 2.00 $30.81 $61.62 3/17/2008 received incomplete, inaccurate application packet; redlined & prepared for tree board packets 2.00 $30.81 $61.62 3/24/2008 site inspection; site not prepared as required 1.00 $30.81 $30.81 3/26/2008 Tree Board meeting - application reviewed, found incomplete, deferred (applicant not in attendance) 1.00 $30.81 $30.81 3/27/2008 email correspondence to applicant relaying requested by TB, deferral of application 1.00 $30.81 $30.81 3/31/2008 meeting w/ applicant to submit revised tree survey, add trees to mitigation worksheet (came in 2 x) 0.50 $30.81 $15.41 4/1/2008 appl/survey still not to code standards; prepared submittal for tree 1.00 $30.81 $30.81 board packets 4/9/2008 Tree Board meeting - application reviewed, approved for removal of trees shown survey submitted on 3/31 1.00 $30.81 $30.81 4/10/2008 application tracking/approvals; permit issuance 1.00 $30.81 $30.81 4/21/2008 walk-in - report of violation(s) (incorrect placement of property line, removal of trees from west exterior zone/marking of trees on adj prop) 0.50 $30.81 $15.41 4/21/2008 site inspection to verify reported violation(s) 0.50 $30.81 $15.41 4/21/2008 email correspondence to applicant relaying findings of site inspection related to report of violations 0.50 $30.81 $15.41 4/23/2008 Tree Board meeting - staff reported to board on status of requested materials 0.50 $30.81 $15.41 4/24/2008 phone call from adj prop owner to find out if TB had taken any action at 4/23 mtg 0.25 $30.81 $7.70 4/28/2008 phone call - report of violation(s) (removal of trees from north exterior zone) 0.25 $30.81 $7.70 4/28/2008 site inspection to verify reported violation(s); meeting w/ adj property owner 1.00 $30.81 $30.81 4/28/2008 email correspondence to applicant relaying finds of site inspection related to report of violations 0.25 $30.81 $7.70 4/29/2008 meeting w/ applicant to submit revised tree survey 0.25 $30.81 $7.70 4/30/2008 staff prepared tree survey (adding int/ext lines), added additional ext trees to tree mitigation worksheet 1.00 $30.81 $30.81 5/7/2008 meeting w/ applicant to submit further revised tree survey 0.25 $30.81 $7.70 5/8/2008 staff prepared tree survey (adding int/ext lines), created new tree mitigation worksheet 1.50 $30.81 $46.22 5/9/2008 prepared submittal for tree board packets 1.00 $30.81 $30.81 1730 Ocean Grove Staff Time on Tree Permitting DATE TASK TIME RATE EXTENDED 5/12/2008 phone call from adj prop owner regarding tree that fell from subj property, has been laying across deck, palm, azaleas, ferns for a week 0.25 $30.81 $7.70 5/12/2008 email to appl, relaying info re down tree, permission to remove that tree only 0.25 $30.81 $7.70 5/12/2008 phone call from appl re down tree 0.25 $30.81 $7.70 5/14/2008 phone call from adj prop owner regarding meeting 0.25 $30.81 $7.70 5/14/2008 Tree Board meeting - application reviewed, public comment heard; application deferred due to failure of applicant to follow procedures in application preparation and site preparation. 1.50 $30.81 $46.22 5/15/2008 drafted notice of violation, forwarded to Alan Jensen for review and comment 1.00 $30.81 $30.81 5/16/2008 phone call from Alan Jensen, instruction to draft mitigation order, have TB approve, forward to CEB; in mean time, have Building Official issue stop work 0.50 $30.81 $15.41 5/16/200/ discussion with CE Officer & Building Official regarding appropriate procedures 0.50 $30.81 $15.41 5/16/2008 site inspection to determine if last submitted tree survey was reasonably accurate; unable to determine due to number of trees already removed 1.00 $30.81 $30.81 5/19/2008 phone call from applicant, complaints about procedure wanted to know what his options are 0.50 $30.81 $15.41 5/19/2008 follow-up email to Sonya regarding applicant's phone 0.25 $30.81 $7.70pyggppp call, request to speak w/ her regarding application 5/20/2008 meeting with adj property owner regarding movement property line tape onto adjacent property (west) 0.25 $30.81 $7.70 5/20/2008 meeting w/ Sonya to relay options available to applicant, according to code specifications 0.25 $30.81 $7.70 26.50 $816.46