Loading...
1259 Linkside Dr SOLR21-0001 Solar ElecOWNER:ADDRESS:CITY:STATE:ZIP: CHUCK BARNES TAX RECEIVABLES LLC 2747 ART MUSEUM DR JACKSONVILLE FL 32233-4392 COMPANY:ADDRESS:CITY:STATE:ZIP: A1A SOLAR CONTRACTING INC 10418 NEW BERLIN 223 JACKSONVILLE FL 32226 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 172374 5390 SELVA LINKSIDE UNIT 01 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 1259 LINKSIDE DR ELECTRICAL SOLAR PANEL ELECTRIC FOR SOLAR PV 3.9KW $500.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT ELECTRICAL BASE FEE 455-0000-322-1000 0 $55.00 SOLAR COLLECTOR SYSTEM 455-0000-322-1000 0 $30.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 1/29/2021 PERMIT NUMBER SOLR21-0001 ISSUED: 1/29/2021 EXPIRES: 7/28/2021 ELECTRICAL SOLAR PANEL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 TOTAL: $89.00 2 of 2Issued Date: 1/29/2021 PERMIT NUMBER SOLR21-0001 ISSUED: 1/29/2021 EXPIRES: 7/28/2021 ELECTRICAL SOLAR PANEL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 DESCRIPTION ACCOUNT QTY PAID PermitTRAK $89.00 SOLR21-0001 Address: 1259 LINKSIDE DR APN: 172374 5390 $89.00 ELECTRICAL $55.00 ELECTRICAL BASE FEE 455-0000-322-1000 0 $55.00 MECHANICAL $30.00 SOLAR COLLECTOR SYSTEM 455-0000-322-1000 0 $30.00 STATE SURCHARGES $4.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R14744 $89.00 Printed: Friday, January 29, 2021 11:25 AM Date Paid: Friday, January 29, 2021 Paid By: A1A SOLAR CONTRACTING INC Pay Method: CREDIT CARD 418348367 1 of 1 Cashier: CG Cash Register Receipt City of Atlantic Beach Receipt Number R14744 ~+; CENTRALSQUARE SOLR21-0001 Electrical Permit Application City of Atlantic Beach Building Department 800 Seminole Rd, Atlantic Beach, FL 32233 Phone: (904} 247-5826 Email: Building-Dept@coab.us MIT#: ____ _ ~ ' -~t!""":--" .,,-- 259lihksidQ prwe ! PROJECT VALUE JOB ADDRESS: JEA INFORMATION REQUIRED ON ALL PERMITS: f~AMPS (2..fo ,; · VOLTS 1. ;, : , PHASE ...,,h.,-••••-•-.-•• • ~ •• •-•••' .. ~ •-, □ NEW SERVICE: CJ Overhead CUnderground □Underground up Pole Cllesidential (Main) Service: Cl151-200amps C0-100 amps [Jl.01-lS0amps CICommercial (Main) Service: □0-100 amps □101-lS0amps □1s1-2ooamps Conductor Type _______ Size _____ _ []Multi-Family (Main) Service: Cll-100 amps □101-lS0amps O151-200amps □ TEMPORARY POLE: ___ amps _a ______ a.mps □. ___ amps a ___ amps □ SERVICE UPGRADE : D ___ amps ctT Service ___ amps 0 NEW FEEDER (ADDITIONS, ACCESSORY STRUCTURES, ETC.): □100 amps □lS0amps □2ooamps □. ___ amps [J:T Service __ amps 0 ADDITIONS, REMODELS, REPAIRS, BUILD-OUTS, ACCESSORY STRUCTURES, ETC: # of Meters __ _ □CT Service ___ amps # of Unit Meters __ _ Outlets/Switches: ___ 0 -30amps ___ 31-lO0amps ___ 101-200amps Appliances : ___ 0-30amps ___ 31-l00amps ___ 101-200amps A/C Circuits : ___ 0-60amps ___ 61-lO0amps Heat Circuits: ___ #circuits @ ___ kw Number of Lighting Outlets, Including Fixtures : __ _ □ OTHER ELECTRICAL PROJECTS : []swimming Pool □Sign □smoke Detectors ___ {Qty) Orransfo rmers ____ KVA □Motors ___ HP □ FIRE ALARM SYSTEM (Requires 3 sets of plans): Qty ____ volts/amps ____ _ (Z] REPAIRS/MISCELLANEOUS: □Replace Burnt/Damaged Meter Can 0)ther: Connection to Solar PV 3.9KW □Safety Inspection □Panel Change OOH to UG Updated 10/17/18 Permit becomes void if work does not commence within a six month period or work is suspended or abandoned for six months. I hereby certify that I have read this application and know the same to be true and correct. All provisions of laws and ordinances governing this work will be complied with whether specified or n ot. The permit does not give authority to violate the provisions of any other state or loca l law regulation construction or the performance of construction. Owner Name: aoseplj Ravi . Notarized Signature of License Hold The foregoin instru e ged before me thi __ day DEPARTMENT OF PLANNING AND DEVELOPMENT .)tl Where Florida Begins. April 16, 2018 MEMORANDUM To: BULLETIN G-03-18 All Permit Applicants From: Thomas H. Goldsbury, P.E., C.B.O. Chief, Building Inspection Division Subject: Solar Photovoltaic In order to provide architects, engineers, contractors and owners with the necessary requirements for permitting and installing Solar Photovoltaic, the following General Requirements have been developed. This bulletin is effective May 7, 2018. Submit two sets of drawings, as defined under the "Construction Documents and Specifications" section, signed and sealed by the appropriate Florida professional engineer and/or architect. Complete the Building Permit Application and make sure the Owner/ Agent section has been signed, dated and notarized and the Contractor Affirmation section has been signed, dated and notarized. Please note that the contractor must be registered with the City of Jacksonville. Please be aware that, since every project is unique, there may be some situations where you will be asked to provide additional information. GENERAL REQUIREMENTS ❖ Required Permit Applications: ► Solar Photovoltaic: Building permit Electrical permit ❖ All drawings shall be a minimum size of 11" x 17" and dimensioned and drawn to a minimum of¼" scale and a minimum of 1/8" lettering. Hand drawn sketches will not be acceptable. 214 N. Hogan Street, Room 273 Jacksonville, FL 32202 Phone: 904.630.1100 Fax: 904.255.8552 www.coj.net ❖ Construction documents and specifications: ► Photovoltaic Systems: 1. Provide an electrical diagram showing the PV array configuration, wiring system, overcurrent protection, inverter disconnect grounding, required signs, and the AC connection to the building. 2. Provide specifications sheets, installation manuals (if available) for all manufactured components including, but not limited to, the PV modules, inverter(s), combiner box, disconnect, and mounting system. 3. Provide the attachment details, flashing details, construction design for the unit and any support framing members (signed and sealed by the appropriate Florida design professional) for the Wind Zone, additional loading of the new solar equipment, and any site conditions such as but not limited to framing system (trusses or conventional framing), roofing system, existing dead loads, etc. that all items meet code requirements, in accordance with 2017 Florida Building Codes, 6th Edition, Sections 1510.7 and 1607.12.5. 4. For battery backup systems, include a summary of all standby loads, the power ratings, and estimated daily energy consumption for each load to show that the inverter and battery selection will meet the standby needs. ❖ Roof Plan -provide 2 full sets of the roof plan to scale indicating the location of solar panel(s) installation with dimensions. · REVISIONS (NOTE: In order to facilitate prompt review, revisions will be accepted only after all plans examiners have completed their review of the previous submittal) ❖-·submit only the sheets that are being revised with a "revised" stamp, sealed and signed and dated (2 sets of signed and sealed drawings) ❖ Provide two copies of a narrative, on your company's letterhead, identifying the purpose of the revision and what is being revised. ❖ Provide the permit application number and the address of the project. ❖ All revisions shall be identified on the drawings and clouded. CONTRACTORS ❖ Each of the contractors listed below, may perform all work identified in their individual scopes of work, including the installation of appurtenances, apparatus, or equipment. However, such contractor shall sub-contract all other work which is specified as being the work in the trade of another contractor. In all cases, please refer to Florida Statutes 489 and any properly enacted local licensing laws. ► Solar Contractor (PV) may obtain the Building Permit for the Solar Photovoltaic and the Electrical permit for work on the line side of the inverter. ► Building contractors may pull the building permit for the installation of the panels only. ➔ Electrical Contractors may obtain the Electric Permit in the Photovoltaic category, and the building permit if they are installing the panels. ~ that a building contractor shall obtain the Building permit for the installation of the panels. ► Do not associate the electrical permit to the building permit so all inspections can be completed the same day. JEA PRE-APPROVAL ❖ JEA requires every customer interested in interconnecting to the JEA grid to submit an application for interconnection and get pre-approval from JEA before the permit can be released and prior to initiating installation or construction of the customer-owned generation system. ❖ Please visit JEA.com to obtain the Application for Interconnection of Distributed Generation Systems and other documents required by JEA. ❖ If the solar PV system includes a battery system, the application must include a one-line electric diagram and the battery equipment technical specification sheet(s). ❖ JEA will inspect the installed solar photovoltaic and battery system before approving interconnection to the JEA grid. ❖ If there are any questions regarding our Distributed Generation program, please email JEA at DistGen@jea.com.