Loading...
89 Dewees Roof Revision Aer, Revision Request/Correction to Comments **ALL INFORMATION HIGHLIGHTED IN : City of Atlantic Beach Building Department GRAY IS REQUIRED. 800 Seminole Rd, Atlantic Beach, FL 32233 1 Phone: (904) 247-5826 Email: Building-Dept@coab.us PERMIT#: ❑ Revision to Issued Permit OR LJ Corrections to Comments Date:r,2 s p2 ( Project Address: g 6 Dem) e W 0-1/(— Contractor/Contact Contractor/Contact Name: (t /ZvaR p, Ce Contact Phone: 004— 02.Y eL. Email: S/' cine_eel Description of Proposed Revision/Corrections: 1., ,L: FLFEBO52U GENIIcc I Q)m sh0 rt.' affirm the revision/correction to comments is inclusive of the proposed changes. (printed name) • Will proposed revision/corrections add additional square footage to original submittal? ❑No ❑ Yes (additional s.f.to be added: • Will proposed revision/corrections add additional increase in building value to original submittal? ❑No ❑*yes (additional increase in building value: $ ) (Contractor must sign if increase in valuation) *Signature of Contractor/Agent: (Office Use Only) ❑ Approved ❑ Denied ❑ Not Applicable to Department Permit Fee Due$ Revision/Plan Review Comments Department Review Required: Building Planning&Zoning Reviewed By Tree Administrator Public Works Public Utilities Public Safety Date Fire Services updated 10/17/18 APPROVED SUBSTRATES REFERENCE endlaps 4". Offset(stagger) endlaps of adjacent courses a minimum 3'. Base Sheets Cut endlaps at opposing diagonal corners at an •Flintlastic®SA NailBase angle approximately 5-1/2" long by the selvage •Flintlastic SA PlyBase •Flintlastic SA MidPly dimension from the corners to minimize potential water incursion at T-Seams (see T-Seam Detail). Insulation Apply a bead or small trowel dab (quarter size) of •FlintBoard°ISO&ISO Cold(polyisocyanurate insulation) FlintBond SBS Modified Bitumen Adhesive, Caulk or Cover Board Trowel grade, at the edge of the angled cut to avoid •High density fiberboard(ASTM C208&209-primed boards only) e.STRUCTODEK°High Density Fiberboard with Primed a capillary. Use of a hand-held hot air gun at the joint -i.Red Coating area prior to rolling the membrane will maximize •Asphalt coated cover boards adhesion. It is recommended to apply a bead of •Gypsum based cover board products(priming may be required): FlintBond SBS Modified Bitumen Adhesive, Caulk -USG Securock°Gypsum-Fiber Roof Board grade, at all SA PlyBase or SA MidPly side and •Georgia Pacific DensDeck°Roof Boards: endlap edges to eliminate a capillary. -DensDeck(priming is required) -DensDeck Prime(priming is not required but will enhance Do Not Leave Base Sheet Exposed To The Weather. adhesion) Cover in the same day with SA Cap (FR). •Zip System°Sheathing Decks Cold Weather Application Instructions, •Structural concrete decks*(priming is required) Interply Sheet -'Lightweight Structural Concrete is subject to greater moisture When ambient temperatures are between content and not acceptable for direct adherence of Flintlastic 20°F - 49°F; SA self-adhering products •Wood(priming is required) • Store materials in a heated location and draw -Approved Wood Types: materials as needed. If the materials have •APA Rated Exterior Grade Plywood been exposed to cold temperatures, allow a •APA Rated Exterior Grade Oriented Strand Board(OSB) sufficient period of time in a heated environment precautions:Direct adhesion is not permitted by code in Miami-Dade for them to warm to 50°F. County;check your local building code);At the end of the roofing membrane's life,roofing membranes directly adhered to wood roof DO NOT INSTALL COLD ROLLS. decks will require replacement of the deck. • No additional cold weather application precautions are required for interply sheets. Application Of Interply (Optional) Before Installing Flintlastic SA Cap Note: Proceed to "Before Installing Flintlastic SA Or SA Cap FR Cap(or SA Cap FR)" if installing a 2-ply system. If roof edge detail utilizes edge metal, proceed as Before installing Flintlastic SA PlyBase or SA MidPly follows. sweep the underlying anchor sheet or base ply to remove any debris that could interfere with adhesion. Cut rolls to manageable lengths and allow to relax for a minimum of 15 minutes. Start with SA PlyBase or SA MidPly at the low point of the roof with appropriate roll width to offset sidelaps 18" from sidelaps of underlying anchor sheet or base ply (see Field Details chart) all flush to roof edge. Design layout so that no sidelaps are against the flow of water. Fold the membrane back halfway lengthwise to remove the split release film. Press membrane securely into place and repeat with the opposite half Edge Metal for Two-Ply Systems (with no interply) of the membrane. Use a heavy, weighted roller over the entire surface of the SA PlyBase or SA MidPly If an interply is not installed, install a 9" wide to secure the membrane. Work from the center of flashing strip of SA PlyBase or SA MidPly (material the roll outwards across the width to eliminate air assumed to match base sheet if fully adhered) pockets; DO NOT roll lengthwise as it can cause the onto the field of the roof and flush to the roof roll to stretch. edge, self-adhered. Install minimum 26 gauge edge metal using appropriate fasteners, set entirely in Overlap sidelaps of subsequent SA PlyBase or a uniform 1/8" -1/4" thick troweling of FlintBond SA MidPly membrane courses a minimum 2" and Trowel. Fasten edge metal through the surface,