Loading...
2277 Seminole Rd Unit K ROOF20-0074 Shingle, Low SlopeOWNER:ADDRESS:CITY:STATE:ZIP: MURPHY MICHAEL P 1803 ATLANTIS PL TALLAHASSEE FL 32303 COMPANY:ADDRESS:CITY:STATE:ZIP: RELIANT ROOFING INC 8000 Belfort Parkway Suite 200 Jacksonville FL 32256 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 168344 0110 DEWEES GRANT S/D PT JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 2277 SEMINOLE RD K ROOF NON SHINGLE SHINGLE AND LOW SLOPE ROOF $8350.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 455-0000-322-1000 0 $95.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $47.50 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.14 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL: $146.64 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 12/18/2020 PERMIT NUMBER ROOF20-0074 ISSUED: 12/18/2020 EXPIRES: 6/16/2021 ROOF NON SHINGLE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 2 of 2Issued Date: 12/18/2020 PERMIT NUMBER ROOF20-0074 ISSUED: 12/18/2020 EXPIRES: 6/16/2021 ROOF NON SHINGLE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 DESCRIPTION ACCOUNT QTY PAID PermitTRAK $146.64 ROOF20-0074 Address: 2277 SEMINOLE RD K APN: 168344 0110 $146.64 BUILDING $95.00 BUILDING PERMIT 455-0000-322-1000 0 $95.00 BUILDING PLAN REVIEW $47.50 BUILDING PLAN CHECK 455-0000-322-1001 0 $47.50 STATE SURCHARGES $4.14 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.14 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R14406 $146.64 Printed: Friday, December 18, 2020 10:19 AM Date Paid: Friday, December 18, 2020 Paid By: RELIANT ROOFING INC Pay Method: CREDIT CARD 405315610 1 of 1 Cashier: CG Cash Register Receipt City of Atlantic Beach Receipt Number R14406 ~+; CENTRALSQUARE ROOF20-0074 Building Permit Application ~ ~ Updated10/9/18 City of Atlantic Beach Building Department 800 Seminole Road, Atlantic Beach, FL 32233 Phone: (904) 247-5826 Email: Building-Dept@coab.us Job Address: 2277 Seminole Road Unit K, Atlantic Beach, FL, 32233 Permit Number: __________ _ Legal Description AG-212 37-2S-29E DEWEES GRANTS/DPT LOT 1 DIV 3 RECD O/R 15533-46, RE# 168344•0110 ---------- Valuation of Work (Replacement Cost) $_8_35_0_.o_o ____ Heated/Cooled SF ____ Non-Heated/Cooled ____ _ • • Class of Work: □New □Addition ~eration □Repair □Move □Demo □Pool □Window/Door Use of existing/proposed structure{s): □Commercial ~sidential If an existing structure, is a fire sprinkler system installed?: □Yes ~ • osed ro·ect? □Yes moval Permit ~o Florida Product Approval# tL\O \1}-1-'.fb~(o + H .. 6'.oSD-R27 Property Owner Information for multiple products use product approval form Name Michael & Nancy Murphy Address 2277 Seminole Road Unit K City !Atlantic:: Beach '.. -. . .. . . - E-Mail rnprnurphy1050@grnail.com - State .,,.,F.,,,..L......,.,,.,,.,,Zip 3:2°233 _____ P.!1_<?n~J~_59U~45-~31.6 -_ -_-_______ ,.,,, ______ _ Owner or Agent (If Agent, Power of Attorney or Agency Letter Required) __________________ _ Contractor Information Name of Company ""'R-'-e=li=an""'t-'-R=o=ofi=in=g'-------------Qu~li!yi~~ }).~_en_!._....,.,_c=a=m=e=ro,...n_S_h_o ..... u.,,,.pp..,.,e==-=====....,.,- Addressi 8000 Belfort Parkway #200 Cityj Jacksonville --State...,,[ F....,I __ Zipf' 32256 Office Phone 9(}4-667-06!30 ---. -· -Job Site Contact Number ...:9;.;:0-'-4--'-7'""12;;;..-""'31.;_1'--'1---------~- State Certification/Registration# CCC1330615 E-MaiLamanda@reliantroofing.com Architect Name & Phone# _________________________________ _ Engineer's Name & Phone# --,,,, .. ~=--=·•""'-----=·--=-=•---=-··=--·----=· -=--=---=· -=-=--·"'"·---------=,,,..,,=~=-,,.. __ ------,,,.,.c,--,_\ -------====-=----=·----=--=-·--=-·-=-.. =··"·=----=--- Workers Compensation Insurer I Policy 'lt,· WC 196-49725 OR Exempt )A Expiration Date __ 1w1_,_/1,.,,0,.,,/2""0"'21.L..-, ___ _ Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS,PO()LS, F~RNA(ES, .~01 __ L_ER~,. HEATERS,TA~KS, and AIRC()~DITIO __ N ERS_, .• etc .. Np'fts~:,lp\a,dtlitipp.;t?.':tfi~{r,~91.1jf~~g.6ts:§t,Jh1~ perfolJ/Jr~n~:ni~ifif~~~lfign~_,,r:~~ttlctl,~.hS•~p~liq'.~bl,·\tC?i~i~--~rpp~~~;th~t;l!l~Y'P~f P~pp;iQ;·.t..~Ef P~.btf.9 ._[!:!f~i~-~.9t•!til.s; __ QflYpltY/i?P~ t_Mr~-m~v/6.itf~~.ftl96.~!iperm'its: tiefqqireq'.fr'C>Q1°9t,1:i~rgpY~r&me.11t~i:.~nJifre~'suc.1:i:c1.sW:iit~Fm~ri~g~rnent.dlstri~~i'.;sta,t~;ag~ry~l~S/Q.f fedet~liaii!:!hqi~S} OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING-rn~~OF COMMENCEME~_T·-~a~-----~-. 7"'-'/4·-· _Al -tt-. """"/ ____ _ (Signature of Owner or Agent) (Si~ Contractor) Signed and sworn to (or affirmed) before me this JQ_ day of bee.. '.2o . Signed and sworn to (or affirmed) before me this _ID_ day of pee_ , 20 , by C,o'N"Yf'YQO S'xw\~~ --~ ~~ [~rsonally Known OR [ ] Produced ldentificatio Type of Identification: (Signature ofotar0 ,,1111,,,, AMANDA JACKSON_ .:-w State of Florida-Notary Publrc f,.. .~ Commission# GG 205328 ~:"l: iff My Commission Expires ",'J.'i'-!li \.'iJf',.,❖ .a ',I (\Q -,n-,2 111 -ps .....,,.....,..., ROOF20-0074 Doc# 2020276439, OR BK 19491 Page 9, Number Pages: 1, Recorded 12/11/2020 11:06 AM, RONNIE FUSSELL CLERK CIRCUIT COURT DUVAL COUNTY RECORDING $10.00 NOTICE OF COMMENCEMENT . (PREPARE IN DUPLICATE) Permit No. ___________ _ Tax Folio No. _______________ _ County of _____ _,'51<.\lC><..>\l'-"O,,"'\..,,.:..· _..., _____ _ State of ,_Fl"'o'-'rid""a"------------ To whom it may concern: The undersigned hereby informs you that improvements will be made to certain real property, and in accordance with Section 713 of the Florida Statutes, the following Information is stated In this NOTICE OF COMMENCEMENT. Legaldescriptionofpropertybeingimproved: AG-212 37-2S-29E DEWEES GRANT S/D PT LOT 1 DIV 3 RECD 0/R 15533-463 BEING PARCEL K & 1715TH INTEREST IN COMMON AREA PARCEL Address of property being improved: ;)271 Sero ,nt)\~ Rd . \ ,\¥)\ \ \'\ -312,.'.3'.!> General description or improvements: _R_o_o_f_R_e_._p_la_c_e_m_e_n_t _______________ _ Owner M,rno.e\ M\J,,:cpb~ Address Sc,'C:{) € Owner's Interest in site of the improvement_,Q._.,.,\,A)...,..c,.(\..,_f ...... L _________________ _ Fee Simple Titleholder (if other than owner) ______________________ _ Name _________________________________ _ Address _______________________________ _ Contractor Reliant Roofing Address 4230 Pablo Professional Ct #155 Jacksonville FL 32224 Phone No. 904-657 -0880 Fax No. _______________ _ Surety (if any) _______________________________ _ Address ___________________ ,Amountof bond$ _______ _ Phone No. _____________ Fax No. _______________ _ Name and address of any person making a loan for the construction of the improvements. Name _________________________________ _ Address ________________________________ _ Phone No. ______________ Fax No. _______________ _ Name of person within the State of Florida, other than himself. designated ty owner upon whom notices or other documents may be served: Name _________________________________ _ Address ________________________________ _ Phone No. _____________ Fax No.·----~----------- ln addition to himself. owner designates the following person to receive a ccpy of the Lienor·s Notice as provided in Section 713.06 (2) (b). Florida Statutes. (Fill in at Owner's optlon). Name _________________________________ _ Address _______________________________ _ Phone No. ____________ Fax No. ________________ _ THIS SPACE FOR RECORDER'S USE ONLY Myco t, g herell\MANDA JACKSON .:?..-rJ;'\~l State of Florida-Notary Public ~;-;§ Commission# GG 205328 -!-,:;,tt~"" ... ~$' My Commission Expires 1 '1111111' April 09, 2022 Perso ---,,..'---'--~---~-~--or Produ on_~ f1&C0 SBS Self-Adhering Roofing System 195/8" 4" Min Side Lap 393/8" 393/8" EnergyGuard™ Polyiso Insulation or DensDeck® DuraGuard LIBERTY™ CAP SHEET LIBERTY™ BASE/PLY SHEET 4" Min 195/8" 131/8" 2" Min Side Lap 4" Min Side Lap 393/8" 393/8"393/8" Nailable Deck LIBERTY™ MA LIBERTY™ CAP SHEET LIBERTY™ BASE/PLY SHEET 4" Min 9" Max. 18" Max. 1911/16" 2" Min Side Lap 4" Min Side Lap 393/8" Nailable Deck Liberty™ Cap Sheet Liberty™ MA Base Sheet 9" max 393/8" 18"max 2-Ply Lay-out (SA Base)2-Ply Lay-out (MA Base)3-Ply Lay-out Liberty Installation Kit How Do I Prepare for a Liberty ™Project? Before You Start… the installation of your new Liberty™SBS Self-Adhering Roofing, do the following: • Read Instructions Thoroughly...and understand how the entire system works before starting your installation. • Understand The Materials… know when and where to use each component, why each is necessary, and the common mistakes to avoid. • Contact GAF Contractor Services...at 1-800-ROOF-411 for detailed information on specific applications or consult the technical specification for detailed application instructions. Do’s And Don’ts…Liberty™SBS Self-Adhering Roofing Systems are designed to be installed over low sloped roof decks. • Do Install On Roofs Between 1/2” And 6” Per Foot…and backnail the Liberty™Cap Sheet when the slope is greater than 1” per foot. Contact GAF Contractor Services at 1-800-ROOF-411 for fastening requirements specific to your project. • Do Install In Moderate Temperatures...between 45°F (7°C) and 95°F (35°C), to assure proper adhesion and easier work conditions. • Do Follow Proper Storage Recommendations...Keep material clean and dry. In cooler weather, 24 hours prior to application store at 55°F (12.8°C) for best installation result. • Do Install Over Clean Surfaces… that are free of dirt, moisture, debris, damage or are otherwise unsuitable for installation. • Don't Work Alone...GAF recommends between 2 and 4 people to install Liberty™SBS Self-Adhering Roofing. SAFETY FIRST... Protect yourself and others. Consider the following common sense safety precautions, including: • Wear appropriate clothing, including protective footwear, eye wear and gloves. • Be aware of your surroundings. Watch for power lines when working near ladders and use common sense on your jobsite. • Follow local building codes. • Bend at the knees. Never lift with your back. Precautionary Note:The application instructions for this product require the use of primers, adhesives or cements that contain solvents. Apply solvent-based products ONLY as instructed. Excess application of solvent-based products may affect the performance of this product, delay application of the cap sheet, cause surface blistering of the cap sheet or result in the asphalt flowing, dripping or staining.You may notice unpleasant odors from the solvents, which will dissipate when the solvent-based product has dried. Liberty™Roof Materials… What Do I Need to Install a Quality Roof? • Liberty Installation Kit… comes with enough primer and cement to install approximately 200 square feet of membrane. Additional kits or extra primer and cement may be purchased if necessary. • Liberty™Self-Adhering Base/Ply...is the base weatherproofing layer when applied over acceptable, prepared decks or insulations. Each roll contains approximately 200 square feet. • Liberty™Mechanically Attached Base...is applied when the deck is unsuitable for self-adhered sheets or when a nailed base sheet is preferred. Each roll contains approximately 200 square feet. • Liberty™Self-Adhered Cap...is the first line of defense from the weather. Each roll contains approximately 100 square feet. • Metal Flashing… for covering roof perimeter edges. Metal flashings are typically sold in 10 foot sections and must be primed with asphalt primer and allowed to dry before installation. • Everything Else… when measuring, note the size and number of vent pipes, and other flashings. Don’t forget any nails, lumber or other additional material that you may need. Liberty™Roof Systems… Which roof is right for me? Note:Single Ply application not shown; visit www.gaf.com for details if required. What Tools & Equipment Do I Need to Install a Liberty™Roof? Tape MeasureGlovesHammerBrushUtility Knife Weighted RollerTrowel Caulk Gun Wear Glasses Look for these important safety symbols Wear Gloves Common Mistakes and How to Avoid Them ROOF20-0074 :m· GAF MATERIALS CORPORATION Shingle underlayment 6" 12" Shingles Plywood Deck Liberty™ Base flashing must extend up a minimum of 3 courses of shingles. Fasteners approx. 8" o.c. Fasteners approx. 8" o.c. 12" Liberty™ Cap flashing must extend up a minimum of 3 courses of shingles.Matrix™ 201 Premium SBS Flashing Cement Figure 2-1 (Fastening) Edge Flashing Shingle Tie-In Primed Edge Flashing, Min. 4” Flange Set In Leak BusterTM Matrix #201 SBS Cement Leak BusterTM Matrix #201 SBS Cement Continuous Metal Cleat Nail 8” O.C. Liberty™ Cap Sheet Liberty™ Base Sheet 4” MIN Pressure Treated Wood Nailer Mechanically Fastened EnergyGuardTM Insulation Leak BusterTM #201 SBS Cement Fasteners 3” O.C. Staggered STEP 1 - Preparing for a Liberty™Roof... Is the Surface Ready? • Remove All Existing Roofs…and determine the suitability of the existing roof deck. Alternately, LibertyTM MA base may be installed over certain roof types or deck types not listed. Contact GAF Contractor Services at 1-800-ROOF-411 for more information. • Inspect The Deck…and determine what type of preparation is required. Replace damaged deck materials as necessary. • Install Insulation (if desired)…using GAF DRILL-TECTM screws and plates or GAF approved adhesives. Use minimum 1/2” thick EnergyGuardTM Polyiso insulation with approved fiberglass or paper facer. Acceptable Decks 15/32” Minimum Plywood..........Apply light asphalt primer at 1/2 to 3/4 gal per 100 sq. ft. GAF EnergyGuard PolyIso Insulation..........Install Self-Adhered Liberty Base Sheet directly to insulation Other Deck Types May Be Acceptable..........Contact GAF Contractor Services at 1-800-ROOF-411 for more information Common Mistakes (and How to Avoid Them)... • Poor Roof Drainage… can lead to leaks at the seams. Before installation, fix the roof deck at locations where water remains after 48 hours. • Not Priming The Deck…or metal may lead to poor adhesion and is a leading cause of problems. • Not Following Proper Storage Recommendations… Be sure rolls are stored at 55°F for 24 hours prior to application. STEP 2 - Installing Liberty™Base Sheet... nailed base or adhered base? 1. Align Base Sheets…Starting at the lowest point of the roof where there are gutter or fascia edges, extend the base sheet over and down the fascia fully behind the metal edge or gutter height, fastened along roof edge and along fascia 9” o.c. Minimum overhang is 1”. Begin with 1/2 width (19 11/16”) sheets in 2-ply systems. Use 1/3 width (13 1/8”) starter sheets in 3-ply systems and install 2nd ply (interply sheet) starting with 1/2 width (19 11/16”) sheets to maintain side lap offsets. 2. Install MA Base Sheet (Where Required)…using nails with 1” cap heads. Fasten every 9” in the lap and stagger 2 rows in the field every 18” (Figure 2-1). Cover the entire roof area. 3. Install SA Base Sheet…by aligning sheets properly before removing the release liners. Roll out sheet and let it sit or “relax” for at least 30 minutes to minimize the potential for wrinkles that can form during installation. Remove one side of the release liner at a time. 4. Overlap Following Rows of Base Sheet… horizontally (side lap) by using the line found on the base sheet. Remove release films from top and bottom half of sheet in turn, carefully rolling back into position to maintain overlap Where no line is present, overlap by 3”. Overlap vertically (end laps) by at least 6”. Make sure all end laps are at least 18” apart. 5. Roll Base Sheet Into Place (SA Base Only)… using a weighted lawn or linoleum roller. This improves adhesion to the deck and ensures properly sealed laps. NOTE:A base sheet is not required; visit www.gaf.com for more information. Common Mistakes (and How to Avoid Them)... • Not Letting The Liberty Sheets Relax… can lead to wrinkles. In colder weather, the rolls require more time to flatten and return to adequate installation temperature. • Not Rolling The Base Sheets…Is a leading cause of opening laps. Always pay close attention to laps when rolling the base sheets. NOTE:Never install wet or damaged material. Only install membrane when temperature is 45°F and rising. STEP 3 - Installing Liberty™Cap Sheet...Where Do I Begin? 1. Install Edge Flashing… over the base sheet in a 1/8” bed of cement and stagger nail with two rows of roofing nails, 3” o.c. Prime the face on the roof and allow to dry before installing cap sheet. 2. Align Cap Sheet… 1/4” from the edge at the lowest point of the roof. Roll out and position full width (39 3/8”) sheets with the selvage edge on the high side of the roof. Allow sheet to relax for at least 30 minutes prior to installing. 3. Overlap Following Rows… horizontally (Side Lap) by aligning with the bottom of the selvage edge. Vertical (End Laps) must be overlapped by at least 6” and applied in a 1/8” bed of Leak Buster™Matrix™ #201 SBS Cement. Make sure all end laps are at least 18” apart and have clipped corners (Figure 3-1). GAF recommends installing a bead of plastic cement along the step up length of the lap. 4. Remove Release Films… from top to bottom half of sheet in turn, carefully rolling back into position to maintain overlap. Remove selvage edge release film prior to installing bottom half of sheet and finishing the side lap. 5. Roll the Cap Sheet Into Place… using a minimum 50 lb weighted roller. This improves adhesion to the base sheet and ensures properly sealed laps. Common Mistakes (and How to Avoid Them)... •Not Priming the Edge Metal…can cause the cap sheet to peel away at the edges. Always prime edge metal before installing cap sheet. • Not Applying Cement at the End Laps… Can cause laps to open. All locations where sheets extend over granules must be set in cement. STEP 4 - Cleaning Up and Maintaining Your Liberty™Roof… • Remove All Tools and Materials From the Roof…and make sure there is no debris that can slow or stop the flow of water. • Dispose of Materials Properly… following all federal, state and local laws. • Inspect the Roof Annually… and remove any leaves, branches or vegetation that may be present. Look for other damage and repair if necessary. • Keep Gutters Clean…to ensure proper water flow and minimize the possibility of damaging ice dams. ©2006 GAF Materials Corporation 9/06 RESLB108 Liberty® SBS Cap Sheet (OPTIONAL) 1/4” Deep Ribbon Of LeakBusterTM Matrix # 201 SBS Cement Covering The Edge Beneath Clip Underside Corners At 45˚ Angle At All End Laps 1/8” Bed Of LeakBusterTM Matrix #201 SBS Cement 12” To 18” 6” Min 12” To 18” Figure 3-1 (End Lap) f---18" g• 0 0 0 0 0 D " LJ_ g• 0 0 " I 131/8 0 0 ,.-I 0 0 0 0 0 0 0 0 m -------------:-==--==:J n ~========::::::::::__ ____ ~ Lib~r~ SU .,, ...... •ring Roofing System Page 1 of 4 Updated 10/17/18 PRODUCT APPROVAL INFORMATION SHEET FOR THE CITY OF ATLANTIC BEACH, FLORIDA (*REQUIRED) *Project Address: _________________________________________________________________________ Permit #: ___________________________ *Owner/Project Name: _______________________________________________________________________________________________________ As required by Florida Statute 553.842 and Florida Administrative Code Rule 9B-72, please provide the information and product approval number(s) for the building components listed below as applicable to the building construction project for the permit number listed above. You should contact your product supplier if you do not know the product approval number for any of the applicable listed products. Information regarding statewide product approval may be obtained at: www.floridabuilding.org. Category/Subcategory Manufacturer Product Description Limitation of Use State # Local # A. EXTERIOR DOORS 1. Swinging 2. Sliding 3. Sectional 4. Garage Roll-Up 5. Automatic 6. Other B. WINDOWS 1. Single hung 2. Horizontal slider 3. Casement 4. Double hung 5. Fixed 6. Awning 7. Pass-through 8. Projected 9. Mullion 10. Wind breaker 11. Dual action 12. Other Page 2 of 4 Updated 10/17/18 Category/Subcategory Manufacturer Product Description Limitation of Use State # Local # C. PANEL WALL 1. Siding 2. Soffits 3. EIFS 4. Storefronts 5. Curtain walls 6. Wall louvers 7. Glass block 8. Membrane 9. Greenhouse 10. Synthetic stucco 11. Other D. ROOFING PRODUCTS 1. Asphalt shingles 2. Underlayments 3. Roofing fasteners 4. Nonstructural metal roof 5. Built-up roofing 6. Modified bitumen 7. Single ply roofing 8. Roofing tiles 9. Roofing insulation 10. Waterproofing 11. Wood shingles/shakes 12. Roofing slate 13. Liquid applied roofing 14. Cement-adhesive coats 15. Roof tile adhesive 16. Spray applied polyurethane roof 17. Other Page 3 of 4 Updated 10/17/18 Category/Subcategory Manufacturer Product Description Limitation of Use State # Local # E. SHUTTERS 1. Accordion 2. Bahama 3. Storm panels 4. Colonial 5. Roll-up 6. Equipment 7. Other F. STRUCTURAL COMPONENTS 1. Wood connector/anchor 2. Truss plates 3. Engineered lumber 4. Railing 5. Coolers-freezers 6. Concrete admixtures 7. Material 8. Insulation forms 9. Plastics 10. Deck-roof 11. Wall 12. Sheds 13. Other G. SKYLIGHTS 1. Skylight 2. Other H. NEW EXTERIOR ENVELOPE PRODUCTS 1. 2. Page 4 of 4 Updated 10/17/18 In addition to completing the above list of manufacturers, product description and State approval number for the products used on this project, the Contractor shall maintain on the job site and available to the Inspector, a legible copy of each manufacturer's printed specifications and installation instructions along with this Product Approval Sheet. I certify that this product approval list is true and correct to the best of my knowledge. I further certify that use of different components other than the ones listed in this document must be approved by the Building Official. *Contractor Name (Print Name):_________________________________ *Contractor Signature: ___________________________________________ *Company Name: __________________________________________________________________________________________________________ *Mailing Address: __________________________________________________________________________________________________________ *City: _______________________________________________ *State: ______________________ *Zip Code: _______________________________ *Telephone Number: ___________________________________ *E-mail Address: _______________________________________________________ Cell Phone Number: _____________________________________ Fax Number: _________________________________________________________ ~o-vv s~