Loading...
1604 Coquina Place RESO18-0036 ZRC 06.25.2018 CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800 ZONING REVIEW COMMENTS Date: 6/25/2018 Permit #: RESO18-0036 Site Address: 1604 COQUINA PL Review Status: DENIED RE#: 169561 0000 Applicant: FASANELLI CONSTRUCTION INC Property Owner: HINDER PAUL R Email: Fabio@fasanelliconstruction.com Email: Phone: 9046141999 Phone: THIS REVIEW IS ONE OF MULTIPLE DEPARTMENT REVIEWS. Revisions may not be submitted until ALL departments have completed their respective reviews. Revisions submitted MUST respond to EACH department review. Submittals that respond to only one or a few correction items will not be accepted. Correction Comments: 1. Nonconforming Structure: Section 24-85(c) prohibits the expansion or enlargement of a nonconforming structure, unless the enlargement/expansion complies with setbacks and other regulations. Enclosing the balcony does not comply with setbacks as the current setback on that side is 3.8 feet. 2. Survey: Please provide an updated certified survey prior to any revisions. The submitted survey was completed before a large addition to the house. 3. Setbacks: Please provide all setbacks to property lines on any revised plans. Resubmittal Notes: All revisions and changes shall clearly stand out from the rest of the drawing on the sheet as a revision by way of completely encircling the change with “clouding”. The revision shall also be identified as to the sequence of revision by indicating a triangle with the revision sequence number within it and located adjacent to the cloud. The revision date and revision sequence number shall also be indicated in a conspicuous location in the title block for each sheet on which a revision for that sequence occurs. For projects still in the initial review stage and permit pending, all sheets with revisions shall be inserted into each set of drawings. The original sheets must be clearly marked “VOID” but are to be left within the set of drawings. Complete new sets of drawings will not be accepted. ADDITIONAL ITEMS MAY BE REQUIRED DEPENDING UPON NEW INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.