Loading...
2017 Duna Vista Ct ROW21-0036 JEA UG BoreOWNER:ADDRESS:CITY:STATE:ZIP: WOLFEL JOHN JR 2017 DUNA VISTA CT ATLANTIC BEACH FL 32233 COMPANY:ADDRESS:CITY:STATE:ZIP: JEA 21 WEST CHURCH ST JACKSONVILLE FL 32202 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 169506 1624 SELVA NORTE UNIT 02 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 2017 DUNA VISTA CT RIGHT OF WAY SINGLE OR TWO FAMILY RIGHT OF WAY JEA - UG BORE $0.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction. 2 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 4/6/2021 PERMIT NUMBER ROW21-0036 ISSUED: 4/6/2021 EXPIRES: 7/5/2021 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT TOTAL: 3 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration, including sod, is required. 4 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL Notes: Any damage done to infrastructure must be repaired by Contractor. 5 PUBLIC WORKS AS-BUILT INFORMATIONAL Notes: Contractor must submit As-Built plans to City within 30 days after completion of project. 6 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878. 2 of 2Issued Date: 4/6/2021 PERMIT NUMBER ROW21-0036 ISSUED: 4/6/2021 EXPIRES: 7/5/2021 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 H:\Applications & Forms\Word Documents\201801001 Right-of-Way Easement Permit Application.docx Revision Date: 10/1/18 **ALL INFORMATION HIGHLIGHTED IN GRAY IS REQUIRED. RIGHT-OF-WAY / EASEMENT PERMIT APPLICATION City of Atlantic Beach 800 Seminole Road, Atlantic Beach, FL 32233 PERMITTEE RESPONSIBLE FOR NOTIFYING 811 AND OBTAINING UTILITY LOCATES Job Address_________________________________________________ Permit Number________________________ Contractor Information Company______________________________________________ Qualifying Agent_____________________________ Address______________________________________ City________________________ State______ Zip___________ Phone________________________________________ Email_______________________________________________ State Certification/Registration #_______________________________________________________________________ Architect_____________________________________ Phone____________________ Email______________________ Engineer_____________________________________ Phone____________________ Email_______________________ Workers Compensation Insurer ____________________________________ OR Exempt Expiration Date __________ Permittee declares that prior to filing this application they have ascertained the location of all existing utilities, both aerial and underground and the accurate locations are shown on the sketches. Whenever necessary for the construction, repair, improvement, maintenance, safe and efficient operation, alteration or relocation of all, or any portion of said street or easement as determined by the Public Works Director, any or all said poles, wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be immediately removed from said street or easement or reset or relocated hereon as required by the Public Works Director and at the expense of the Permittee unless reimbursement is authorized. All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be performed under the supervision of ____________________________________________________________________ (Project Superintendent) with (Company Name) ________________________________________________Phone_____________________________ All materials and equipment shall be subject to inspection by the Public Works Director. All city property shall be restored to its original condition as far as practical, in keeping with City specifications and the manner satisfactory to the City. A sketch of plans covering details of this installation, as well as a copy of a recent survey shall be made a part of this permit. -of-way are to be included with this application. The permittee shall commence actual construction in good faith within _______ days. If the beginning date is more than 60 days from date of permit approval then permittee must review the permit with the Public Works Director to make sure no changes have occurred in the area that would affect the permitted construction. title and interest in the land to be entered upon and used by the holder, and the holder will, at all times, assume all risk of and indemnify, defend and save harmless the City of Atlantic Beach from and against any and all loss, damage and cost of expenses arising in any manner of the exercise or attempted exercises by the holder of the aforesaid rights and privileges. The Public Works Director shall be notified 24 hours prior to starting work and again immediately upon completion. _______________________________________________________________________________ Date________________________ Permittee (signed in presence of Notary Public) STATE OF FLORIDA, COUNTY OF DUVAL The foregoing instrument was acknowledged this ___________ day of ________________________________________, 20 _________, by _______________________________________________________________________, who personally appeared before me and (printed name of Permittee) acknowledged that he/she signed the instrument voluntarily for the purpose expressed in it. __________________________________________________________ [ ] Personally Known Signature of Notary Public, State of Florida [ ] Produced Identification (Type) _______________________ ________________________________________Job AddressJob Address_______________________________________________________Job Address__________________ROW21-0036 ã U å ° ã U D D D D 6 2 6 2 6 2 6 2 62 !Q % !Q% !Q% â 44 9 44 3 50 C 50 C 20 4 0 50C 2016 N.O.-C 20TH ST D U N A V I S T A C T __________________ ORACLE PROJECT #:47364 ________________________ PERMIT N.O.:8006650 __________________ MAXIMO WO #:30685846 _______________ DATE REL CONST:04/01/21 ____________________________________________________SUB-STA:NEPTUNE BEACH __________ CIR. N.O.:565 ____________________________________________________ENGINEER:Robert Simpson _______________ CELL N.O.:N/A __________ PHONE N.O.:665-7793____________________________________________________ CUSTOMER/ LOCATION:2017 DUNA VISTA CT./ DIR BORE 3" 565 __________________ SVC CENTER:SSSC __________ TREE TRIMMING REQ'D:NO __________________ZIP CODE:N/A ENGINEERING DESIGN STA 1, T# 2016 DUNA VISTA CT/ DIR BORE 3" TO ELEC INSTALLED PULL BOX AT STA 2. PULL NEW 2/0URD TO THE HOUSE MAKE UP SERVICE. STA 2, H# 2017 DUNA VISTA CT. ***** MAKE UP NEW SERVICE, LEAVE OLD SERVICE HOT, ELEC WILL COMPLETE CHANGE OVER ***** STA 1 STA 2 CUE Reports Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: SIMPRB MWO#/Task: 30685846 Required Date: Oracle Project #: 8006654 Estimated On: 03/31/2021 _________________________________________________________________________________________ Cost Estimate Materials JEA Contractor 1. New Material Cost (w/ sales tax) $594.09 $594.09 2. Transformer Cost (w/ sales tax) $0.00 $0.00 3. Returned Material Salvage Value $0.00 $0.00 Labor 4. Crew Time $1,530.52 $1,596.68 5. Extraordinary Costs $0.00 $0.00 JEA Overhead 6. Fringe Benefits (45.01% of lines 4 & 7) $814.64 $125.76 7. Engineering Costs (Variable % of line 4) $279.40 $279.40 8. Project Equipment Costs (40% of total equipment costs) $950.27 $0.00 9. Material Handling (7.18% of lines 1 & 2) $42.66 $42.66 10. Inspection (6.84% of line 4) $0.00 $109.21 11. Total Cost of Project $4,211.57 $2,747.79 12. Work Order Estimate (Line 11 minus line 8, 9, & 10) $3,218.65 $2,705.14 13. Billable Equipment Depreciation (60% of total equipment costs) $1,425.40 $0.00 14. Billing Estimate (Including Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7)) $6,807.27 $2,928.45 15. Billing Estimate (W/O Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7) - Line 2) $6,807.27 $2,928.45 _________________________________________________________________________________________ Time Estimate Crew Hours Total Manhours 9.67 38.68 ----------------------------------------------------------------------------------------------------------------------------------- CUE Reports Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: SIMPRB MWO#/Task: 30685846 Required Date: Oracle Project #: 8006654 Estimated On: 03/31/2021 _________________________________________________________________________________________ CU Detail StationStation:01 T# 2016 DUNA VISTA CT. DIR BORE 3" Build Transfer Remain in Place Remove DIR-BORE*3 60 HANDDIG 5 I.CODPE003 60 UCL9*3 1 USC*2/0T 70 StationStation:2 2017 DUNA VISTA CT. STUB UP AT BOX Build Transfer Remain in Place Remove HANDDIG 5 UCL4*3 1 USS*500 3 _____________________________________________________________________________________________________________________________ CUE Reports Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: SIMPRB MWO#/Task: 30685846 Required Date: Oracle Project #: 8006654 Estimated On: 03/31/2021 _________________________________________________________________________________________ Conductor, Conduit and Pipe Detail Quantities From Station To Station CU Build Transfer Remain Remove CUE Reports Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: SIMPRB MWO#/Task: 30685846 Required Date: Oracle Project #: 8006654 Estimated On: 03/31/2021 _________________________________________________________________________________________ Material Summary Item Quantity Item Number Item Description 70 CAIUS002 CABLE, 2/0 URD, UNDERGROUND SERVICE, "BLISS OR CONVERSE" XLP INSULATION, 600 VOLT, TRIPLEX 1000' MINIMUM REEL LENGTH 1 CODEP003 ELBOW, PVC, CONDUIT, 3", 45-DEGREE 36" SWEEP-RADIUS, SCH-40, WITH INTEGRAL BELL END 1 CODEP004 ELBOW, PVC, CONDUIT, 3", 90-DEGREE 36" SWEEP-RADIUS, SCH-40, WITH INTEGRAL BELL END 60 CODPE003 CONDUIT, COILABLE, 3-INCH POLYETHYLENE GRAY SDR 13.5 POWER CONDUIT, SMOOTH WALL VIRGIN HIGH-DENSITY POLY RESIN. TYPE III, CLASS C, CATEGORY 3, UV PROTECTED, GRADE P34 POLY, (SHIP TO 2325 EMERSON ST 322070 OPEN FLATBED TRUCK) (1200FT REELS) 3 SPLKT005 SPLICING AND REPAIR KIT, 600 VOLT SECONDARY, SIZE- 500 MCM CUE Reports Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: SIMPRB MWO#/Task: 30685846 Required Date: Oracle Project #: 8006654 Estimated On: 03/31/2021 _________________________________________________________________________________________ CU Summary BUILD CU Name Quantity Description DIR-BORE*3 60 DIRECTIONAL BORE 3" HANDDIG 10 NO DESCRIPTION... UCL4*3 1 INSTALLATION OF CONDUIT ELL UCL9*3 1 INSTALLATION OF CONDUIT ELL USC*2/0T 70 NO DESCRIPTION... USS*500 3 SECONDARY SPLICE CUE Reports Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: SIMPRB MWO#/Task: 30685846 Required Date: Oracle Project #: 8006654 Estimated On: 03/31/2021 _________________________________________________________________________________________ CU's with Zero for Contractor CU Name Workfunction Quantity HANDDIG INSTALL 10