2017 Duna Vista Ct ROW21-0036 JEA UG BoreOWNER:ADDRESS:CITY:STATE:ZIP:
WOLFEL JOHN JR 2017 DUNA VISTA CT ATLANTIC BEACH FL 32233
COMPANY:ADDRESS:CITY:STATE:ZIP:
JEA 21 WEST CHURCH ST JACKSONVILLE FL 32202
TYPE OF
CONSTRUCTION:
REAL ESTATE
NUMBER:ZONING:BUILDING USE
GROUP:SUBDIVISION:
169506 1624 SELVA NORTE UNIT 02
JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK:
2017 DUNA VISTA CT RIGHT OF WAY SINGLE OR TWO
FAMILY RIGHT OF WAY JEA - UG BORE $0.00
LIST OF CONDITIONS
Roll off container company must be on City approved list . Container cannot be placed on City right-of-way.
1 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL
Notes:
All runoff must remain on-site during construction.
2 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL
Notes:
Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container
cannot be placed on City right-of-way.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property
that may be found in the public records of this county, and there may be additional permits required from other
governmental entities such as water management districts, state agencies, or federal agencies.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT
IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF
COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST
INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION.
ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING
CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES .
ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY.
1 of 2Issued Date: 4/6/2021
PERMIT NUMBER
ROW21-0036
ISSUED: 4/6/2021
EXPIRES: 7/5/2021
RIGHT OF WAY PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
FEES
DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT
TOTAL:
3 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL
Notes:
Full right-of-way restoration, including sod, is required.
4 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL
Notes:
Any damage done to infrastructure must be repaired by Contractor.
5 PUBLIC WORKS AS-BUILT INFORMATIONAL
Notes:
Contractor must submit As-Built plans to City within 30 days after completion of project.
6 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL
Notes:
Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is
needed, call 247-5878.
2 of 2Issued Date: 4/6/2021
PERMIT NUMBER
ROW21-0036
ISSUED: 4/6/2021
EXPIRES: 7/5/2021
RIGHT OF WAY PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
H:\Applications & Forms\Word Documents\201801001 Right-of-Way Easement Permit Application.docx Revision Date: 10/1/18
**ALL INFORMATION
HIGHLIGHTED IN GRAY IS
REQUIRED.
RIGHT-OF-WAY / EASEMENT PERMIT APPLICATION
City of Atlantic Beach
800 Seminole Road, Atlantic Beach, FL 32233
PERMITTEE RESPONSIBLE FOR NOTIFYING 811 AND OBTAINING UTILITY LOCATES
Job Address_________________________________________________ Permit Number________________________
Contractor Information
Company______________________________________________ Qualifying Agent_____________________________
Address______________________________________ City________________________ State______ Zip___________
Phone________________________________________ Email_______________________________________________
State Certification/Registration #_______________________________________________________________________
Architect_____________________________________ Phone____________________ Email______________________
Engineer_____________________________________ Phone____________________ Email_______________________
Workers Compensation Insurer ____________________________________ OR Exempt Expiration Date __________
Permittee declares that prior to filing this application they have ascertained the location of all existing utilities, both aerial
and underground and the accurate locations are shown on the sketches.
Whenever necessary for the construction, repair, improvement, maintenance, safe and efficient operation, alteration or
relocation of all, or any portion of said street or easement as determined by the Public Works Director, any or all said poles,
wires, pipes, cables or other facilities and appurtenances authorized hereunder, shall be immediately removed from said
street or easement or reset or relocated hereon as required by the Public Works Director and at the expense of the
Permittee unless reimbursement is authorized.
All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be performed under the
supervision of ____________________________________________________________________ (Project Superintendent)
with (Company Name) ________________________________________________Phone_____________________________
All materials and equipment shall be subject to inspection by the Public Works Director.
All city property shall be restored to its original condition as far as practical, in keeping with City specifications and the
manner satisfactory to the City.
A sketch of plans covering details of this installation, as well as a copy of a recent survey shall be made a part of this permit.
-of-way are to be included with
this application.
The permittee shall commence actual construction in good faith within _______ days. If the beginning date is more than 60
days from date of permit approval then permittee must review the permit with the Public Works Director to make sure no
changes have occurred in the area that would affect the permitted construction.
title and interest in the land to be entered upon and used by the holder, and the holder will, at all times, assume all risk of
and indemnify, defend and save harmless the City of Atlantic Beach from and against any and all loss, damage and cost of
expenses arising in any manner of the exercise or attempted exercises by the holder of the aforesaid rights and privileges.
The Public Works Director shall be notified 24 hours prior to starting work and again immediately upon completion.
_______________________________________________________________________________ Date________________________
Permittee (signed in presence of Notary Public)
STATE OF FLORIDA, COUNTY OF DUVAL
The foregoing instrument was acknowledged this ___________ day of ________________________________________, 20 _________,
by _______________________________________________________________________, who personally appeared before me and
(printed name of Permittee)
acknowledged that he/she signed the instrument voluntarily for the purpose expressed in it.
__________________________________________________________ [ ] Personally Known
Signature of Notary Public, State of Florida [ ] Produced Identification (Type) _______________________
________________________________________Job AddressJob Address_______________________________________________________Job Address__________________ROW21-0036
ã U
å °
ã
U
D
D
D
D
6
2
6 2
6
2
6
2
62
!Q %
!Q%
!Q%
â
44
9
44
3
50
C
50
C
20
4
0
50C
2016
N.O.-C
20TH ST D U N A V I S T A C T
__________________
ORACLE
PROJECT #:47364 ________________________
PERMIT
N.O.:8006650 __________________
MAXIMO
WO #:30685846 _______________
DATE REL
CONST:04/01/21
____________________________________________________SUB-STA:NEPTUNE BEACH __________
CIR.
N.O.:565
____________________________________________________ENGINEER:Robert Simpson _______________
CELL
N.O.:N/A
__________
PHONE
N.O.:665-7793____________________________________________________
CUSTOMER/
LOCATION:2017 DUNA VISTA CT./ DIR BORE 3" 565 __________________
SVC
CENTER:SSSC
__________
TREE TRIMMING
REQ'D:NO
__________________ZIP CODE:N/A
ENGINEERING DESIGN
STA 1, T# 2016 DUNA VISTA CT/ DIR BORE
3" TO ELEC INSTALLED PULL BOX AT STA
2. PULL NEW 2/0URD TO THE HOUSE
MAKE UP SERVICE.
STA 2, H# 2017 DUNA VISTA CT.
***** MAKE UP NEW SERVICE, LEAVE OLD
SERVICE HOT, ELEC WILL COMPLETE
CHANGE OVER *****
STA 1 STA 2
CUE Reports
Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21
Estimate Version: By: SIMPRB
MWO#/Task: 30685846 Required Date:
Oracle Project #: 8006654 Estimated On: 03/31/2021
_________________________________________________________________________________________
Cost Estimate
Materials JEA Contractor
1. New Material Cost (w/ sales tax) $594.09 $594.09
2. Transformer Cost (w/ sales tax) $0.00 $0.00
3. Returned Material Salvage Value $0.00 $0.00
Labor
4. Crew Time $1,530.52 $1,596.68
5. Extraordinary Costs $0.00 $0.00
JEA Overhead
6. Fringe Benefits (45.01% of lines 4 & 7) $814.64 $125.76
7. Engineering Costs (Variable % of line 4) $279.40 $279.40
8. Project Equipment Costs (40% of total equipment costs) $950.27 $0.00
9. Material Handling (7.18% of lines 1 & 2) $42.66 $42.66
10. Inspection (6.84% of line 4) $0.00 $109.21
11. Total Cost of Project $4,211.57 $2,747.79
12. Work Order Estimate (Line 11 minus line 8, 9, & 10) $3,218.65 $2,705.14
13. Billable Equipment Depreciation (60% of total equipment costs) $1,425.40 $0.00
14. Billing Estimate (Including Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7)) $6,807.27 $2,928.45
15. Billing Estimate (W/O Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7) - Line 2) $6,807.27 $2,928.45
_________________________________________________________________________________________
Time Estimate
Crew Hours Total Manhours
9.67 38.68
-----------------------------------------------------------------------------------------------------------------------------------
CUE Reports
Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21
Estimate Version: By: SIMPRB
MWO#/Task: 30685846 Required Date:
Oracle Project #: 8006654 Estimated On: 03/31/2021
_________________________________________________________________________________________
CU Detail
StationStation:01 T# 2016 DUNA
VISTA CT. DIR BORE 3"
Build Transfer Remain in Place Remove
DIR-BORE*3 60
HANDDIG 5
I.CODPE003 60
UCL9*3 1
USC*2/0T 70
StationStation:2 2017 DUNA VISTA
CT. STUB UP AT BOX
Build Transfer Remain in Place Remove
HANDDIG 5
UCL4*3 1
USS*500 3
_____________________________________________________________________________________________________________________________
CUE Reports
Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21
Estimate Version: By: SIMPRB
MWO#/Task: 30685846 Required Date:
Oracle Project #: 8006654 Estimated On: 03/31/2021
_________________________________________________________________________________________
Conductor, Conduit and Pipe Detail
Quantities
From Station To Station CU Build Transfer Remain Remove
CUE Reports
Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21
Estimate Version: By: SIMPRB
MWO#/Task: 30685846 Required Date:
Oracle Project #: 8006654 Estimated On: 03/31/2021
_________________________________________________________________________________________
Material Summary
Item Quantity Item Number Item Description
70 CAIUS002 CABLE, 2/0 URD, UNDERGROUND SERVICE, "BLISS OR CONVERSE"
XLP INSULATION, 600 VOLT, TRIPLEX 1000' MINIMUM REEL LENGTH
1 CODEP003 ELBOW, PVC, CONDUIT, 3", 45-DEGREE 36" SWEEP-RADIUS, SCH-40,
WITH INTEGRAL BELL END
1 CODEP004 ELBOW, PVC, CONDUIT, 3", 90-DEGREE 36" SWEEP-RADIUS, SCH-40,
WITH INTEGRAL BELL END
60 CODPE003 CONDUIT, COILABLE, 3-INCH POLYETHYLENE GRAY SDR 13.5
POWER CONDUIT, SMOOTH WALL VIRGIN HIGH-DENSITY POLY
RESIN. TYPE III, CLASS C, CATEGORY 3, UV PROTECTED, GRADE
P34 POLY, (SHIP TO 2325 EMERSON ST 322070 OPEN FLATBED
TRUCK) (1200FT REELS)
3 SPLKT005 SPLICING AND REPAIR KIT, 600 VOLT SECONDARY, SIZE- 500 MCM
CUE Reports
Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21
Estimate Version: By: SIMPRB
MWO#/Task: 30685846 Required Date:
Oracle Project #: 8006654 Estimated On: 03/31/2021
_________________________________________________________________________________________
CU Summary
BUILD
CU Name Quantity Description
DIR-BORE*3 60 DIRECTIONAL BORE 3"
HANDDIG 10 NO DESCRIPTION...
UCL4*3 1 INSTALLATION OF CONDUIT ELL
UCL9*3 1 INSTALLATION OF CONDUIT ELL
USC*2/0T 70 NO DESCRIPTION...
USS*500 3 SECONDARY SPLICE
CUE Reports
Estimate Number: 47364 2017 DUNA VISTA CT./ 3" DIR BORE Estimate Type: SR Contract: 069-19-HRT UG FY21
Estimate Version: By: SIMPRB
MWO#/Task: 30685846 Required Date:
Oracle Project #: 8006654 Estimated On: 03/31/2021
_________________________________________________________________________________________
CU's with Zero for Contractor
CU Name Workfunction Quantity
HANDDIG INSTALL 10