Loading...
0 11th St CIV18-0003 COAB Permit Form with ConditionsOWNER:ADDRESS:CITY:STATE:ZIP: SELVA PRESERVE LLC 248-3 LEVY RD ATLANTIC BEACH FL 32233 COMPANY:ADDRESS:CITY:STATE:ZIP: RPC GENERAL CONTRACTORS 248 LEVY RD ATLANTIC BEACH FL 32233 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 172027 0100 SECTION LAND JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 0 11TH ST CIVIL AND SITE SINGLE OR TWO FAMILY CIVIL AND SITE SELVA PRESERVE II - RE- APPROVAL $250000.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878. 2 PUBLIC UTILITIES METER BOX SEWER CLEAN OUT INFORMATIONAL Notes: Ensure all meter boxes, sewer cleanouts and valve covers are set to grade and visible. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 3Issued Date: 5/19/2021 PERMIT NUMBER CIV18-0003 ISSUED: 5/19/2021 EXPIRES: 11/15/2021 CIVIL AND SITE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 3 PUBLIC UTILITIES RT1 SEWER CLEANOUT INFORMATIONAL Notes: A sewer cleanout must be installed at the property line. Cleanout must be covered with an RT1 concrete box with metal lid. Cleanout to be set to grade and visible. 4 PUBLIC WORKS EROSION CONTROL INSTALLATION INFORMATIONAL Notes: Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact the Inspection Line (904-247- 5814) to request an Erosion and Sediment Control Inspection prior to start of construction. 5 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction or directed to permitted SWMF. 6 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list (Advanced Disposal, Realco Recycling, Shapells, Inc., Republic Services, Donovan Dumpsters, Phillips Containers, JDog/Dennis Junk Removal, All American Roll Off, WCA Waste Corporation). Container cannot be placed on City right-of-way. 7 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration, including sod, is required. 8 PUBLIC WORKS CONSTRUCTION SITE MANAGEMENT INFORMATIONAL Notes: Provide construction site management plan, including location of silt fence, dumpster, portable toilet. Right-of-Way Permit is required if using right-of- way for construction parking. 9 PUBLIC WORKS RUNOFF INFORMATIONAL Notes: All runoff must be directed to SWMF. 10 PUBLIC WORKS ADDITIONAL COMMENTS PUBLIC WORKS INFORMATIONAL Notes: Any construction done within the City right-of-way will require a Right-of-Way Permit. 11 PUBLIC UTILITIES ADDITIONAL COMMENTS PUBLIC UTILITIES INFORMATIONAL Notes: All water services are to be poly. No male adapters at the tap/corp stop (poly connection only). Glass master composite meter boxes with touch read lid. Contractor is to supply meter couplings. All services are to be marked on the curb. RT1 sewer cleanout boxes to be set on the property line. 12 PUBLIC WORKS GRASS INFORMATIONAL Notes: Full site to be grassed. 2 of 3Issued Date: 5/19/2021 PERMIT NUMBER CIV18-0003 ISSUED: 5/19/2021 EXPIRES: 11/15/2021 CIVIL AND SITE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BLDG 2ND PLAN REVIEW FEE 455-0000-322-1006 0 $50.00 BLDG 3RD PLAN REVIEW FEE 455-0000-322-1006 0 $75.00 BLDG 4TH PLAN REVIEW FEE 455-0000-322-1006 0 $150.00 BUILDING PERMIT 455-0000-322-1000 0 $930.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $465.00 FIRE DEPARTMENT FEE 45500002080800 0 $125.00 PU REVIEW BUILDING MOD OR ROW 001-0000-329-1007 0 $25.00 PW REVIEW BUILDING MOD OR ROW 001-0000-329-1004 0 $25.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $31.80 STATE DCA SURCHARGE 455-0000-208-0600 0 $21.20 ZONING REVIEW SINGLE AND TWO FAMILY USES 001-0000-329-1003 0 $50.00 TOTAL: $1,948.00 13 PUBLIC WORKS TOPO SURVEY INFORMATIONAL Notes: Must provide a topographic (TOPO) survey with water retention for final C.O. Inspection. 14 PUBLIC WORKS REVISION INFORMATIONAL Notes: Any plan change must be submitted as a Revision to the Building Department. 15 PUBLIC WORKS ADDITIONAL COMMENTS PUBLIC WORKS INFORMATIONAL Notes: Any damage done to infrastructure must be repaired by Contractor. 16 PUBLIC WORKS UTILITY ROAD CUT INFORMATIONAL Notes: Any utility cuts in the road must be repaired using COJ Standard Detail Case X and must be overlaid 10 feet in each direction from the center of the cut. Repair must be shown on the plans. 17 FIRE OTHER SUBMITTAL NOTES PRIOR TO CO Notes: WILL NEED HYDRANT FLOW TEST.. WILL NOT FAIL IT. WILL HOLD FOR FLOW TEST 3 of 3Issued Date: 5/19/2021 PERMIT NUMBER CIV18-0003 ISSUED: 5/19/2021 EXPIRES: 11/15/2021 CIVIL AND SITE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 Final Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION Page 1 of 2 CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800 BULLETIN 2-18 To: All Permit Applicants. From: Dan Arlington, CBO City Building Official Date: May 9, 2018 Re: PRE-CONSTRUCTION, FORM BOARD, AND FINAL POST- CONSTRUCTION SURVEYS REQUIRED. Per COAB, Section 24-68(a), a PRE-CONSTRUCTION TOPOGRAPHICAL SURVEY and a POST- CONSTRUCTION TOPOGRAPHICAL SURVEY are required for any new development, including swimming pools. Sec. 24-68. - Stormwater, drainage, storage and treatment requirements. (a) Topography and grading. All lots and development sites shall be constructed and graded in such a manner so that the stormwater drains to the adjacent street, an existing natural element used to convey stormwater (see section 22-303, definitions: Stormwater management system), or a city drainage structure after meeting onsite storage requirements, as set forth within this section. The city shall be provided with a pre-construction topographical survey prior to the issuance of a development permit and a post-construction topographical survey prior to the issuance of a certificate of occupancy. Elevations in all topographic surveys will be referenced to NAVD 1988. Said surveys shall be signed and sealed by a licensed Florida surveyor. Except as required to meet coastal construction codes as set forth within a valid permit from the Florida Department of Environmental Protection; or as required to meet applicable flood zone or stormwater regulations as set forth herein, the elevation or topography of a development or redevelopment site shall not be altered. 1. A pre-construction topographical survey must be provided with the building permit application for any new development over 250 square feet. 2. A site survey, showing Finished Floor Elevation (FFE), Building Restriction Lines (BRL), and distances to property lines must be on site for the Slab Inspection, where any part of a proposed structure is less than 0.5 feet from any BRL. NOTE: A Form Board Elevation Certificate, signed by a licensed surveyor, may suffice, where the proposed structures are greater than 0.5 feet from all BRLs. (Blank Form Board Certificates are provided by the City) Page 2 of 2 3. A final post-construction topographical survey must be provided before the Final Inspections can be scheduled. The surveys must be original document; prepared by a licensed surveyor; signed, sealed, and dated; drawn to scale; and should be of sufficient size and clarity to indicate the location, nature, and extent of the new work and the existing structures on the site. The surveys must also show the locations and dimensions of the following: all impervious surfaces, pavers (new and previously existing, not removed by construction), setbacks, distances from lot lines, finished floor elevation, street address, site drainage patterns, and established finished grades. Where on-site stormwater retention is required, elevations must be shown to fully define the retention areas. (See COAB, Section 24-68 through 24-70 for other stormwater requirements) All elevations should reference NAVD 1988 and the elevation and location of the benchmark for the survey should be indicated. If the structure is located in a flood zone, please provide finish floor elevations for all floor levels, including garages, enclosures, and habitable spaces. Additionally, a preliminary FEMA Elevation Certificate is required before the slab is poured and a final Elevation Certificate is required before final C.O. inspection, per FEMA and NFIP Guidelines. Other features to be shown include flood zone boundary lines, base flood elevations (BFE), flood ways, the Coastal Construction Control Line (CCCL), all easements, storm water retention areas, all storm water requirements of COAB, Land Development Regulations, Sections 24-68 through 24-70 and any other development features. All fill dirt must be approved by Public Works before delivery. The pre-construction, form board, and final post-construction surveys are important documents for ensuring adequate drainage throughout neighborhoods, code compliance, and archiving this information in the permanent record. We appreciate your cooperation in this matter. DJA 5/9/2018, 10/02/2018, 2/25/19, 11/24/20 By Toni Gindlesperger at 2:37 pm, Mar 30, 2021 By Toni Gindlesperger at 2:40 pm, Mar 30, 2021 By Toni Gindlesperger at 2:41 pm, Mar 30, 2021 By Toni Gindlesperger at 2:41 pm, Mar 30, 2021 City of Atlantic Beach Mr. Steve Swann 800 Seminole Road Atlantic Beach, Florida 32233 Dear Mr. Swann, { ,' .P: , i -... .. '\ APR 1 3 2021 Enclosed please find a signed copy of the requested Assignment of Floodplain Storage Rights from Atlantic Beach Country Club to Selva Preserve, LLC. It's my understanding this is the final item needed from ABCC since Gemini was able to provide satisfactory flood compensation calculations. Please feel free to reach out to me regarding any additional questions at (904) 502-3781. c¥Q Jaime Eaton President, ABCC Cc: Alan Howard (via email) ASSIGNMENT OF FLOODPLAIN STORAGE RIGHTS THIS ASSIGNMENT OF FLOODPLAIN STORAGE RIGHTS (this "Assignment") is made and delivered as of April tZ!, 2021 by Atlantic Beach Country Club, Inc., a Florida corporation ("Club"), whose address is 1600 Selva Marina Drive, Atlantic Beach, Florida 32233, to and in favor of Selva Preserve, LLC, a Florida limited liability company ("SP"), whose address is 248 Levy Road, Atlantic Beach, Florida 32233. Recitals A. Selva Marina Country Club, Inc., a Florida corporation ("SMCC"), and SP previously entered into that certain ·Easement and Flood Plain Compensation Agreement dated October 15, 2009 (the "Easement Agreement"), pursuant to which Club agreed to provide up to 30,000 cubic yards of floodplain storage at a location to be determined by the Club. Club is the successor in title to the real prope1ty subject to the Easement Agreement. Pursuant to the Easement Agreement: SP is allowed to utilize the Club Property to fulfill its FPC Requirements; the Club granted ce1tain easement rights to SP; and SP granted ce1tain easement rights to the Club. Capitalized te1ms used herein but not otherwise defined shall have the meanings ascribed thereto in the Easement Agreement. B. The obligations of the Club to SP were fu1ther memorialized by that ce1tain Acknowledgment and Release Agreement by and between the Club and SP dated as of January 3, 2020(the "Acknowledgement"). Pursuant to the Acknowledgment, SP agreed that the Club's obligations to SP under the Easement would be satisfied by the assignment of 3,000 cubic yards of floodplain storage to SP and provision of floodplain calculations and survey. The Club has provided SP and the City of Atlantic Beach that certain repmt of floodplain storage availability and survey prepared by Gemini Engineering & Sciences, Inc. dated February 26, 2021 (the "Gemini Report"). By delivery of this Assignment, the Club will have discharged its obligations to SP under the Easement and Acknowledgment. NOW, THEREFORE, in consideration of these mutual premises and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged the Club hereby assigns ce1tain flood storage rights to SP as follows: 1. Recitals. All of the above Recitals are fully incorporated herein by this reference. 2. Assignment. Pursuant to the Gemini Repo1t, as furnished to and approved by the City of Atlantic Beach, the Club has 5,007 cubic yards of flood plain storage available on the real property owned by the Club in its cmTent configuration. The Club hereby assigns to SP 3,000 cubic yards of flood plain storage and acknowledges that, after giving effect to such assignment, the Club only has 2,007 cubic yards of flood plain storage available on its real prope1ty in its current configuration. IN WITNESS WHEREOF, the parties hereto have executed this Assignment of Flood Storage Rights as of the date first written above. CLUB: ATLANTIC BEACH COUNTRY CLUB, INC., a Florida corporation James M Lucas Digitally signed by James M Lucas DN: CN = James M Lucas, C = US, O = Unaffiliated, OU = A01410C000001715FAF24210000 1872 Reason: I am the author of this document Date: 2021.03.29 09:39:05 -04'00' By Toni Gindlesperger at 2:38 pm, Mar 30, 2021By Dan Arlington at 1:30 pm, Apr 15, 2021 By Toni Gindlesperger at 2:38 pm, Mar 30, 2021 By Toni Gindlesperger at 2:38 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:39 pm, Mar 30, 2021 By Toni Gindlesperger at 2:40 pm, Mar 30, 2021 DEPARTMENT OF HOMELAND SECURITY-FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B.NO.1660-0015 COMMUNITY ACKNOWLEDGMENT FORM Expires February 28,2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this data collection is estimated to average 1.38 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources,gathering and maintaining the needed data,and completing and submitting the form. This collection is required to obtain or retain benefits. You are not required to respond to this collection of information unless a valid OMB control number is displayed on this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to:Information Collections Management,Department of Homeland Security, Federal Emergency Management Agency,1800 South Bell Street,Arlington,VA 20598-3005,Paperwork Reduction Project(1660- 0015). NOTE:Do not send your completed form to this address. This form must be completed for requests involving the existing or proposed placement of fill(complete Section A)OR to provide acknowledgment of this request to remove a property from the SFHA which was previously located within the regulatory floodway(complete Section B). This form must be completed and signed by the official responsible for floodplain management in the community. The six digit NFIP community number and the subject property address must appear in the spaces provided below. Incomplete submissions will result in processing delays.Please refer to the MT-1 instructions for additional information about this form. Community Number: 120075 @IVa Preserve 2 Property Name or Address: A. REQUESTS INVOLVING THE PLACEMENT OF FILL As the community official responsible for floodplain management,I hereby acknowledge that we have received and reviewed this Letter of Map Revision Based on Fill(LOMR-F)or Conditional LOMR-F request. Based upon the community's review,we find the completed or proposed project meets or is designed to meet all of the community floodplain management requirements,including the requirement that no fill be placed in the regulatory floodway,and that all necessary Federal,State,and local permits have been,or in the case of a Conditional LOMR-F,will be obtained. For Conditional LOMR-F requests,the applicant has or will document Endangered Species Act(ESA)compliance to FEMA prior to issuance of the Conditional LOMR-F determination. For LOMR-F requests,I acknowledge that compliance with Sections 9 and 10 of the ESA has been achieved independently of FEMA's process.Section 9 of the ESA prohibits anyone from"taking"or harming an endangered species. If an action might harm an endangered species,a permit is required from U.S.Fish and Wildlife Service or National Marine Fisheries Service under Section 10 of the ESA. For actions authorized,funded,or being carried out by Federal or State agencies,documentation from the agency showing its compliance with Section 7(a)( 2)of the ESA will be submitted. In addition,we have determined that the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR 65.2(c),and that we have available upon request by DHS-FEMA,all analyses and documentation used to make this determination. For LOMR-F requests,we understand that this request is being forwarded to DHS- FEMA for a possible map revision. Community Comments: Community Official's Name and Title: (Please Print or Type) Telephone No. Dan Arlington, Building Official 904-247-5813 Community Name: Community Official's Signature: (required) Date: City of Atlantic Beach D1 K.--?,...‘ ikcy-rr-c A 44t!) 4zc B. PROPERTY LOCATED WITHIN THE REGULATORY FLOODWAY As the community official responsible for floodplain management,I hereby acknowledge that we have received and reviewed this request for a LOMA. We understand that this request is being forwarded to DHS-FEMA to determine if this property has been inadvertently included in the regulatory floodway. We acknowledge that no fill on this property has been or will be placed within the designated regulatory floodway. We find that the completed or proposed project meets or is designed to meet all of the community floodplain management requirements. Community Comments: Community Offi ' l's Name and Title: (Please Print or Type) Telephone No.: Dk Af -% A C -0 44 4 (--:R1o 9i)•AC.... t_k?. 104 - zit-c- ',3 _ Community Name: Community Official's Signature(required): Date: 6-v.'t OF ;-r , w+t VA-, r Z DHS-FEMA Form 086-0-26B,FEB 11 Community Acknowledgment Form MT-1 Form 3 Page 1 of 1