Loading...
540 ROYAL PALM ROOF21-0041 revision 6-28-21 ,.1=j':f,, Building Permit Application Updated 10/9/18 a `T!''City of Atlantic Beach Building Department **ALL INFORMATION 800 Seminole Road, Atlantic Beach, FL 32233 HIGHLIGHTED IN GRAY Lwow- IS REQUIRED. Phone: (904) 247-5826 Email: Building-Dept@coab.us j� I / Job Address: 5t'10- F:ocjct.( PA(r� Permit Number: I `L��� l- OOL, ' Legal Description_ V/ ,/L/ —) - Z S 2') G. / 2/ #e/f' 0 f" P7,,, RE# / 7/Si‘• -aO Fir-y.,/ /..••-/.v, Valuation of Work(Replacement Cost)$ B$Go .`' Heated/Cooled SF Non-Heated/Cooled Uni /- 2l14.4' l a 01 / 7 • Class of Work: ❑New DAddition DAlteration ❑Repair ❑Move [Memo ❑Pool ❑Window/Door (Re.ro • Use of existing/proposed structure(s): DCommercial 'Residential • If an existing structure, is a fire sprinkler system installed?: DYes ❑No • Will tree(s)be removed in association with proposed project? ❑Yes(must submit separate Tree Removal Permit) ❑No Describe in detail the type of work to be perfor� d:t_,,,,.. F n.. d I�F1 'Ca.� fnlr,,� d, crc.- te,,,„, Gorviet-e res-oc re.. ...,� � a- 5r-ct„c., tc tc.4 G(l- F Florida Product Approval# C [ —5 2. '1 3- IQ-3c/ for multiple products use product approval form X Property Owner Information Namea r s L#r►d 1e-r Address City Tnieirc'.r e F'I.. State F1-. Zip _32 G G(, Phone '7 1 0 ^ 4 d' 2 3 E-Mail Owner or Agent(If Agent, Power of Attorney or Agency Letter Required) Contractor Information Name of Company rr)c ,c•►Nc. 120 C.c.C.c.Gt n j r.t*iackrflualifying Agent N 1 1-• �j1e..vu.i Imo- iY'c' 1-, e‘::_. c Address 2.0.5 CI ►c.,,.S r C,•r-e i .5 , t City 1JCGp1-1.4..- 11..1-State Ft . Zip 3 2'Z L. C. Office Phone 22 t -v 0 S c Job Site Contact Number State Certification/Registration# Re.- Oa 4-734Q E-Mail 7L Mc,.....h..., Q Go.•s, «.., L • n- (--- Architect Name&Phone# Engineer's Name&Phone# Workers Compensation Insurer OR Exempt xpiration Date y - -C.- 2 2 Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulating construction in this jurisdiction.I understand that a separate permit must be secured for ELECTRICAL WORK,PLUMBING,SIGNS, WELLS, POOLS,FURNACES,BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc. NOTICE: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county,and there may be additional permits required from other governmental entities such as water management districts,state agencies,or federal agencies. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. / ) 0;-;,97,---------__/7 i/ ( ignat f /,Owner Age ) (Signature of Contractor) <l: e a orn to(or . i -� 'or• e is / _ 0,ay of Si �'ed and sworn to(or ffirmed) e •re m day of r a , 2p 2/b „die,. ie, a, , �JY K.c 2-04by 44,0 :• ,. .ii,:iftlaNIEL314 tPltftilYgIN , • : WILLIAM C MEDLIN _.. �+� • : Commission#GG 917974 ; �', '”" Commission#GG 917974 �`• Expires November 4,2023 'O'#`O BorWed Din:TroyFain ]Personally Known OR '-',�••` P` Expires November 4,2023 I. ]Personally Known OR f lnwranceEib3d5-7p�g '•.,�:i�;°; B��TI�NiroyFaminsuranteoG0.3fyS1pt9 )Produced Identification -- roduced Identification _ _-- --s Type of Identification: FL- '"L- Type of Identification: ' Revision Request/Correction to Comments **ALL INFORMATION s'x`/r,- HIGHLIGHTED IN ': City of Atlantic Beach Building Department GRAY IS REQUIRED. 800 Seminole Rd, Atlantic Beach, FL 32233 v7 - , ` Phone: (904) 247-5826 Email: Building-Dept@coab.us PERMIT#:I'NQQ i " U�z I ❑ Revision to Issued Permit OR ❑ Corrections to Comments Date:l/ 2.3/ z—1 Project Address: S i 0 Ro'7 Pc im D i--, t[[ Contractor/Contact Name: Morckc,,. f..c C-1,. f cc,t\ (.41Ac(2.rJ Contact Phone: .C, ,,c-- `i 6. .Z 0 Email: .71. / ion« Ac, ,-. co rvt c J (-- , ., e Description of Proposed Revision/Corrections: CcoaP/mfr r-rlc-o.., F 1 affirm the revision/correction to comments is inclusive of the proposed changes. (printed name) • Wi oposed revision/corrections add additional square footage to original submittal? No ❑ Yes (additional s.f.to be added: ) • WWill�posed revision/corrections add additional increase in building value to original submittal? .allo ❑*Yes (additional increase in building value: $ ) (Contractor must sign if increase in valuation) *Signature of Contractor/Agent: /�`�4. 6 :7/7/-\-- ----- (Office Use Only) ❑ Approved ❑ Denied ❑ Not Applicable to Department Permit Fee Due$ Revision/Plan Review Comments Department Review Required: Building Planning&Zoning Reviewed By Tree Administrator Public Works Public Utilities Public Safety Date Fire Services Updated 10/17/18 RUBEROID® Torch Granule Membrane Updated: 5/ 1 6 GAF Quality You Can Trust...From North America's Largest Roofing Manufacturer!'" TRIPLY® APP 2 PLY SYSTEM n GAF MATERIALS "SMOOTH SURFACE" "GRAN LAR SURFACE" r CORPORATION Perlite Insulation � �Ir' Perlite _�_ nsu at on .[•._[ /fl • 3"Min 3'Min 24*Max Side Lap . 24"Max . Side Lap 3"Min fit121i ---�---- ---�---- Side Lap SideMLfanp 12" f t_ I t 39'/e" imilla 19ele' .• TRIPLY° TRIPLY TP-4 TRIPLY° TRIPLY TP-4-G #75 Base Sheet #75 Base Sheet Substrate—Insulated decks Substrate—Insulated decks Slope—Up to 3 inches per foot. Slope—Up to 3 inches per foot. Materials Materials Perlite Insulation Perlite Insulation TRIPLY Insulation Fastening System TRIPLY Insulation Fastening System TRIPLY#75 Base Sheet TRIPLY#75 Base Sheet TRIPLY TP-4(Smooth) TRIPLY TP-4-G(Granular Surface) TRIPLY Premium Alumnium Coating General General Design and Application Instructions shall apply in addition to the Design and Application Instructions shall apply in addition to the following recommendations and specifications.For additional information following recommendations and specifications.For additional information call 1-800-766-3411 call 1-800-766-3411 Application Recommendations Application Recommendations 1. Install one ply of TRIPLY #75 Base Sheet over the perlife simultane- 1. Install one ply of TRIPLY#75 Base Sheet over the perlife simultane- ously attaching the base sheet and isulation to the deck using TRIPLY ously attaching the base sheet and isulation to the deck using TRIPLY` screws and plates.The side laps must be a minimum of 3 inches. The screws and plates.The side laps must be a minimum of 3 inches. The end laps must be a minimum of 4 inches. end laps must be a minimum of 4 inches. 2 Starting at the low point of the roof surface,set the TRIPLY TP-4 roll in 2 Starting at the low point of the roof surface,set the TRIPLY TP-4-G roll the course to be followed and unroll half the roll where practical. Position in the course to be followed and unroll half the roll where practical. the membrane to provide a minimum of 3 inch side laps and a 6 inch end Position the membrane to provide a minimum of 3 inch side laps and a 6 lap. Using the propane torch,apply the flame to the surface of the coiled inch end lap. Using the propane torch,apply the flame to the surface of portion of the roll until the surface reaches the proper application tempera- the coiled portion of the roll until the surface reaches the proper applica- ture(approximately 350'F). The side lap and the end lap areas of the pre- tion temperature(approximately 350'F). The side lap and the end lap viously applied sheet must also be heated to provide proper adhesion. areas of the previously applied sheet must also be heated to provide prop- The flame should be moved from side to side and up the side lap area of er adhesion. The plastic film must be melted off the selvage edge of gran- the previously applied sheet. Unroll the membrane while pressing onto the ule surfaced products. The flame should be moved from side to side and underlying surface.Be sure that the surface of the roll is heated sufficiently up the side lap area of the previously applied sheet. Unroll the membrane so that the texture-backed products lose their sharp definition.The genera- while pressing onto the underlying surface.Be sure that the surface of the tion of heavy smoke is an indications that the surface is being overheated. roll is heated sufficently so that it develops a sheen.The generation of When this half of the roll is secure,reroll the other half of the roll and torch heavy smoke is an indication that the surface is being overheated.When in place in the same manner. A minimum of 1/4 inch flow out of modified this half of the roll is secure,reroll the other half of the roll and torch in bitumen compound is required at all seams.Field seams should not be place the same manner.A minimum of 1/4 inch flow out of modified bitu- troweled. men compound is required at all seams.Reid seams should not be trow- 3 For smooth surfaced installation a coating is required,between 1 and 4 eled.At the 6 inch minimum end laps,sufficient heat must be applied to weeks after the installation,apply TRIPLY Premium Alumnium Roof the granule surfaced TRIPLY Membranes to cause the granules to sink into Coating at a rate of approximately 1 1/2-2 gallons per 100 square feet. The the top surface coating to assure a receptive surface for bonding to the TRIPLY Membrane surface must be clean,dry,and free of all loose dirt overlapping next roll of TRIPLY Membrane. and dust at the time of coating. Torch Safety Precaution and Recommendations Torch Safety Precautions and Recommendations See reverse side of this sheet. See reverse side of this sheet. 6 "Pre TRIPLY® Safety Precautions 111111 GAF MATERIALS CORPORATION Safety Precautions/Considerations procedures,and specifications.Call GAF Technical Services for the most Roofing is a hazardous activity. Workers must be properly trained to current GAFMC technical literature.In addition,the following steps must work in a manner to avoid falls,burns,back injuries,heat related be taken by the applicator to prevent fires,since only the applicator is in a afflictions,etc. position to prevent fires. These steps include,but are not limited to: It is the sole responsibility of the roofing applicator to enforce fire safe- Do not leave propane torches lighted and unattended.Do not place a ty precautions and to ensure safety at all times. All appropriate OSHA and lighted torch on the deck surface,insulation,membrane,or any other sur- local codes should be followed in the application of roofing. All personnel face or object other than an acceptable torch stand.Extinguish the torch involved in roofing should be properly trained in safety and fire proce- when not in use. dures. Proper clothing and equipment should be worn at all times on the Avoid holding the flame on any one area of the membrane or substrate job site. long enough for heavy smoke to be generated. We refer you to the National Roofing Contractors Associations Passport Train all personnel in GAF MATERIALS CORPORATION's recommended to Safety booklet which addresses numerous safety concerns. application techniques. National Roofing Contractors Association Train all personnel in fire prevention and extinguishing methods.Take O'Hare International Center precautions when working around combustible materials,such as gas 10255 West Higgins Rd.Suite 600 lines for HVAC units,and in the presence of solvent-based products.Use Rosemont,IL 60018-5607 caution to prevent burns and train personnel in first aid procedures. (708)299-9070 Comply with all applicable fire regulations regarding the storage and Torch Safety Information use of propane. Installation of torch-applied products creates the risk of fire,including Note: For more information on safety measures we recommend you refer smoldering fires. to the Asphalt Roofing Manufacturers Association booklet titled Torch Torch-applied products must be applied only by professional roofing Applied Roofing Dos and Donts and their video,A Guide to Safety Torch- applicators trained in proper torch application and safety procedures. On Modified Bitumen. Roofing applicators must follow GAFMCs current roofing safety Asphalt Roofing Manufacturers Association requirements,procedures and specifications,which are available from 4041 Powder Mill Road,Suite#404 GAF Technical Services,toll-free 1-800-ROOF-411. Calverton,MD.20705-3106 Procedures and equipment that will be used must comply with all (301)231-9050 applicable code requirements. Knowledge of the building construction and HVAC systems must be Specific Recommendations for Torch Applications obtained prior to installation of torch-applied products. Membrane Installation All potentially combustible and flammable aspects of the buildings use Only torches designed for installing modified bitumen roofing sheets and design that increase the risk of fire must be identified including: should be used for installing TRIPLY sheets in both field and flashing con- .deck and under deck composition(materials and accessories); structions. .insulation types; Starting at the low point of the roof surface,set the roll in the course to .cants and tapered edge strips; be followed and unroll half the roll where practical. Position the membrane .parapet wall and curb composition; to provide a minimum of 3 inch side laps and a 6 inch end lap. End laps .perimeter details; shall not occur in a continuous line and should be offset by a minimum of 3 .adjoining building materials; feet.Using the torch,apply the flame to the surface of the coiled portion of .expansion joints; the roll until the surface reaches the proper application temperature(approx- .wires and electrical conduit pipes; imately 350'F). The side lap and end lap areas of the previously applied .natural gas lines; sheet must also be heated to provide proper adhesion. The plastic film must .chemicals,grease,oil or other condensates/exhausts/spills. be melted off the selvage edge of granule surfaced products. The flame A base sheet must be used between the roofing membrane and any corn- should be moved from side to side and up the side lap area of the previously bustible materials such as wood. applied sheet. Unroll the membrane while pressing onto the underlying sur- Never apply flame directly to combustible materials or allow the flame face. BE SURE that the surface of the roll is heated sufficiently so that it to enter into hidden or protected areas that may contain combustible develops a sheen and the texture-backed products lose their sharp defini- materials such as: tion. The generation of heavy smoke is an indication that the surface is .air intakes or exhaust openings; being overheated. When this half of the roll is secure,reroll the other half of •air coolers; the roll and heat weld in place in the same manner. A minimum of inch .lead flashings; flow out of modified bitumen compound is required at all seams.More than .drains; 1"flow out of modified bitumen compound may indicate excess heating of •counter flashings and coping covers; the sheet.Field seams should not be troweled. Vertical flashing seams may .collars; be troweled when desired for appearance. .flashings. At the 6 inch minimum end laps,sufficient heat must be applied to the The installation equipment must be designed for the specific use,and granule surfaced TRIPLY Membranes to cause the granules to sink into the must be in proper working order. top surface coating to assure a receptive surface for bonding to the Ventilation must always meet or exceed OSHA or NIOSH requirements. overlapping next roll of TRIPLY Membrane. A supervisor trained in torch safety must conduct external and internal Occasionally,a roll of TRIPLY membrane will contain a splice that was fire watches during application and after the torches are shut down.The fabricated as part of the manufacturing process.These splices are marked. watches shall never be less than one hour and may need to be longer.The Cut out all splices,and treat as an end lap area. watches shall be of sufficient frequency and duration based on: Note:Torch applied TRIPLY Membranes must not be installed with asphalt .weather; nor should they be used in conjunction with roofing cements. .building and roof design and composition; Surfacing .penetration types and design. Coatings or gravel surfacing are required for smooth surfaced torch applied Infrared scanning equipment must be used in the fire watch. TRIPLY Membrane installations to be guaranteed for 12 years. Apply One Class ABC fire extinguisher must be kept within 10 feet of every TRIPLY Premium Aluminum Roof Coating within 1 -4 weeks. torch operator. Reapplication of surfacing should be employed as part of a periodic mainte- The above list is not a complete set of necessary safety requirements, nance program. The frequency may vary depending on climatic conditions. 7 ® RU B E RO Ds') TORCH GRANULE MEMBRANE Description Advantages (Continued) RUBEROID®Torch Granule • Durable—Specially formulated Membrane is a tough, resilient modified asphalt for lasting modified bitumen membrane performance. manufactured to stringent GAF • RUBEROID®Torch Granule specifications. Its core is a strong, Membrane is manufactured by resilient, non-woven polyester mat GAF, a company with over 125 that is coated with weather resistant years in the roofing business. APP polymer modified asphalt. • Available in smooth surface Uses and two granular colors: black RUBEROID®Torch Granule and white. Membrane is designed for new roofing and reroofing applications as well as flashings. RUBEROID® Torch Granule Membrane is also an ideal product for repairs of Applicable Standards built-up roofing membrane or Meets ASTM D6222,Type I,Grade G other modified bitumen systems. FM Approved Advantages • System guarantees available HUD Material Release#1216A for up to 15 years; select Miami-Dade County Product Control Approved — system constructions UL/ULC Listed available with up to 20-year *See Modified Bitumen and Built-Up Roofing coverage.* Application and Specification Manual or UL guarantee Directory for specific approval. • Cost effective—The installed • cost of RUBEROID®Torch Granule Membrane is less than Product Specifications(nominal) most single-ply systems on the Roll Size 1 square market today. (106.5 gross sq.ft.)(9.8 m2) • Light weight—Installed roof Roll Length 32.3' (9.8 m) designs weigh less than 2 pounds Roll Width 39.58"(.625 m) per square foot(9.8 kg/m2). • Resilient—RUBEROID®Torch Arox. ApIpWeight 99 lb (44.9 kg) Granule Membrane polyester mat core allows it to resist splits Product and tears due to its pliability and Thickness 0.160"(4 mm) elongation characteristics. This product meets or exceeds the following ASTM D6222,Type I,Grade G,minimum requirements: -ZProperty Test Method Value Tensile Strength @ 0°F(min), lbf/in ASTM D5147 60 Elongation @ 0°F(min), % ASTM D5147 10 Low Temperature Flexibility(max), °F ASTM D5147 32 Tear Strength (min), lbf ASTM D5147 70 Dimensional Stability, (max) % ASTM D5147 <0.5 "See applicable guarantee for complete coverage and restrictions. ©2016 GAF 8/16 gaf.com • 1-800-ROOF-411