Loading...
65 W 5th St Units 65, 67 Destructive Roofing In ProDestructive Roofing In Progress Application City of Atlantic Beach Building Department 800 Seminole Road, Atlantic Beach, FL 32233 Phone: (904) 247-5826 Email: Building-Dept@coab.us Job Address: _(.Q5 ancf (o-+ 03. C3 On Str-ex_� A7HnnH n f�eacA & 32233 Permit Number: - i tir GLI= �.i -C)132 ROOFING IN PROGRESS INSPECTIONS Updated 01/13/2020 "ALL INFORMATION HIGHLIGHTED IN GRAY IS REQUIRED. A roofing in progress inspection is a required inspection per the Florida Building Code -Existing Building (FBC- EB). The purpose of the inspection is to confirm any required deck nailing has been completed and proper installation of a secondary water barrier as required by Rule 9B-0475. This required inspection was not requested by the contractor prior to completing the shingle installation for the above referenced permit, and now a Destructive Roofing In Progress inspection must be performed by removing certain portions of shingles and/or underlayment to insure compliance with state law. Not complying with this requirement ,-could affect your insurance coverage for storm damage. _ OWNER AFFIRMATION 1 understand that the contractor, for the reason listed below, was unable to acquire a PASSED roofing in progress inspection. I also understand the destructive roofing in progress inspection will require the contractor to remove and replace shingles and/or underlayment as required by the City of Atlantic Beach Building Department to verify work is in compliance with all state and local codes. l (Signature of Owner or Agent) Si ned and sworn to qr affirmed) before me this cr 1- day of 0 41 fs: - ignaturl of Notary) -- - --- Jatmb []tj Personally Known OR Notary Public f ) Produced Identification $tale of Floiflda Type of Identification: ri _ - CvmrnN HH059538 Expires IN2024 _ CONTRACTOR AFFIRMATION COMPANY:_ i du—Ts �►'t l' Uo' C ti ` -- _ — - - - ADDRESS OF PROJECT: LD6 and (D:+ s�t malf c, aA Fc REQ -EST&D BY:-=e/tai ll✓lA/b!%Z1Z4,J - CCGJ3?�a---- REASON FOR REQUEST:�✓ln�t't�IJA-o�`T£� Z�L✓a( %ian�t,iacrtivcf-R;r.r„ P�zxFc�-/a1JlL v-lrUJ A�,9 �}/ijl�,I/'.�.Lt� D�.�i-� %✓• �t0�17.d%llnldL 1/l✓C: /!J �f . Ln1N�Ul✓/37/� I, si/r r�inQ /yiuoAJ understand City of Atlantic Beach Building Department procedures as outlined in Bulletin ???. I also understand the destructive roofing in progress inspection is not part of those procedures and is an exception to the procedure. In addition, I understand that any non -code compliant work identified during this inspep. on may result in the assessment of additional re -inspection fees. Signed: _ _ Date: �_ YrZOZ/ _ AN APPROVED COPY ar7HIS APPLICATION MUST BE ON SITE AT TIME OF DESTRUCTIVE ROOFING IN PROGRESS INSPECTION.