Loading...
1662 E Park Terr ROW21-0051 JEAOWNER:ADDRESS:CITY:STATE:ZIP: BROWN JANET A LIFE ESTATE 1662 PARK TER E ATLANTIC BEACH FL 32233-5824 COMPANY:ADDRESS:CITY:STATE:ZIP: JEA 21 WEST CHURCH ST JACKSONVILLE FL 32202 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 172020 0312 SELVA MARINA UNIT 07 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 1662 E PARK TER RIGHT OF WAY SINGLE OR TWO FAMILY RIGHT OF WAY JEA - REPAIR / RE BORE $0.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878. 2 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 7/15/2021 PERMIT NUMBER ROW21-0051 ISSUED: 7/15/2021 EXPIRES: 10/13/2021 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT TOTAL: 3 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container cannot be placed on City right-of-way. 4 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration, including sod, is required. 5 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL Notes: Any damage done to infrastructure must be repaired by Contractor. 2 of 2Issued Date: 7/15/2021 PERMIT NUMBER ROW21-0051 ISSUED: 7/15/2021 EXPIRES: 10/13/2021 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 ROW21-0051 CUE Reports Estimate Number: 48418 1662 PARK TERR E,/ DIR BORE 3" Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version:By: DONSGW MWO#/Task: 30715401 Required Date: Oracle Project #: 8006654 Estimated On: 06/28/2021 _________________________________________________________________________________________ Cost Estimate Materials JEA Contractor 1. New Material Cost (w/ sales tax)$409.31 $409.31 2. Transformer Cost (w/ sales tax)$0.00 $0.00 3. Returned Material Salvage Value $0.00 $0.00 Labor 4. Crew Time $2,731.67 $2,562.30 5. Extraordinary Costs $0.00 $0.00 JEA Overhead 6. Fringe Benefits (45.01% of lines 4 & 7)$1,395.02 $155.23 7. Engineering Costs (Variable % of line 4)$367.68 $344.89 8. Project Equipment Costs (40% of total equipment costs)$1,701.87 $0.00 9. Material Handling (7.18% of lines 1 & 2)$29.39 $29.39 10. Inspection (6.84% of line 4)$0.00 $175.26 11. Total Cost of Project $6,634.95 $3,676.38 12. Work Order Estimate (Line 11 minus line 8, 9, & 10)$4,903.69 $3,646.99 13. Billable Equipment Depreciation (60% of total equipment costs)$2,552.81 $0.00 14. Billing Estimate (Including Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7))$11,191.80 $3,899.38 15. Billing Estimate (W/O Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7) - Line 2)$11,191.80 $3,899.38 _________________________________________________________________________________________ Time Estimate Crew Hours Total Manhours 17.26 69.03 ----------------------------------------------------------------------------------------------------------------------------------- ROW21-0051 CUE Reports Estimate Number: 48418 1662 PARK TERR E,/ DIR BORE 3" Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: DONSGW MWO#/Task: 30715401 Required Date: Oracle Project #: 8006654 Estimated On: 06/28/2021 _________________________________________________________________________________________ CU Detail StationStation:01 T# 1657 PARK TERR E. DIR BORE 3" Build Transfer Remain in Place Remove DIR-BORE*3 100 HANDDIG 5 UCL9*3 1 USC*4/0T 125 UST*4/0T 3 StationStation:2 T# 1662 PARK TERR E. SET PULL BOX Build Transfer Remain in Place Remove HANDDIG 10 MSERV-BOX-C*H 1 UCL4*3 1 USS*500B 3 _____________________________________________________________________________________________________________________________ CUE Reports Estimate Number: 48418 1662 PARK TERR E,/ DIR BORE 3" Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: DONSGW MWO#/Task: 30715401 Required Date: Oracle Project #: 8006654 Estimated On: 06/28/2021 _________________________________________________________________________________________ Conductor, Conduit and Pipe Detail Quantities From Station To Station CU Build Transfer Remain Remove 01 2 DIR-BORE*3 100 0 0 0 01 2 USC*4/0T 125 0 0 0 CUE Reports Estimate Number: 48418 1662 PARK TERR E,/ DIR BORE 3" Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: DONSGW MWO#/Task: 30715401 Required Date: Oracle Project #: 8006654 Estimated On: 06/28/2021 _________________________________________________________________________________________ Material Summary Item Quantity Item Number Item Description 6 BOLMH007 BOLT, MACHINE, 1/2" X 1-1/2", HEX HEAD, TIN PLATED BRONZE FOR MECHANICAL CONNECTIONS ONLY(GRADE 8) 100 EACH PER BOX/BAG 1 BOXSE001 BOX, REINFORCED PLASTIC/POLYMER COMPOSITES SERVICE 17" X 30", H10-LOADING (SEE JEA TECHNICAL SPECIFICATION FOR DETAILS) SHIP ON OPEN FLATBED ONLY 125 CAIUS001 CABLE, 4/0 URD, UNDERGROUND SERVICE, "REGIS OR SWEETBRIAR" XLP INSULATION, 600 VOLT, TRIPLEX 1000' MINIMUM REEL LENGHT 3 CNNSP001 CONNECTOR, SECONDARY PEDESTAL, 4-OUTLET #10- 500-KCM 3 CNNTL001 TERMINAL LUG, ALUMINUM COMPRESSION, STACKING TYPE LUG, 4/0 STR. 1 CODEP003 ELBOW, PVC, CONDUIT, 3", 45-DEGREE 36" SWEEP-RADIUS, SCH-40, WITH INTEGRAL BELL END 1 CODEP004 ELBOW, PVC, CONDUIT, 3", 90-DEGREE 36" SWEEP-RADIUS, SCH-40, WITH INTEGRAL BELL END 6 NUTBC500 NUT, 1/2"-13, HEX, SILICON BRONZE HS, NC ASTM-B99 ***PACKAGE OF 50 OR 100 EACH*** NO SUBSTITUTE 6 WASLO023 WASHER, LOCK, SHAKE PROOF, 1/2" BOLT SIZE, BRONZE INTERNAL TEETH, TIN PLATED 100-EACH PER BOX/BAG CUE Reports Estimate Number: 48418 1662 PARK TERR E,/ DIR BORE 3" Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: DONSGW MWO#/Task: 30715401 Required Date: Oracle Project #: 8006654 Estimated On: 06/28/2021 _________________________________________________________________________________________ CU Summary BUILD CU Name Quantity Description DIR-BORE*3 100 DIRECTIONAL BORE 3" HANDDIG 15 NO DESCRIPTION... MSERV-BOX- C*H 1 POLYMER CONCRETE SERVICE BOX UCL4*3 1 INSTALLATION OF CONDUIT ELL UCL9*3 1 INSTALLATION OF CONDUIT ELL USC*4/0T 125 NO DESCRIPTION... USS*500B 3 SECONDARY SPLICE UST*4/0T 3 SEC TERM LUGS, 4/0T CUE Reports Estimate Number: 48418 1662 PARK TERR E,/ DIR BORE 3" Estimate Type: SR Contract: 069-19-HRT UG FY21 Estimate Version: By: DONSGW MWO#/Task: 30715401 Required Date: Oracle Project #: 8006654 Estimated On: 06/28/2021 _________________________________________________________________________________________ CU's with Zero for Contractor CU Name Workfunction Quantity HANDDIG INSTALL 15 MSERV-BOX- C*H INSTALL 1 ã U ã U D D ; < ; < ! Q % ! Q % ! Q % B 165 7 163 5 166 9 50B 5 0 B 50 B P A R K T E E __________________ ORACLE PROJECT #:48418 ________________________ PERMIT N.O.:8006654 __________________ MAXIMO WO #:30715401 _______________ DATE REL CONST:05/12/21 ____________________________________________________SUB-STA:NEPTUNE BEACH __________ CIR. N.O.:565 ____________________________________________________ENGINEER:Robert Simpson _______________ CELL N.O.:N/A __________ PHONE N.O.:665-7793____________________________________________________ CUSTOMER/ LOCATION:1662 PARK TERR E./ DIR BORE 3" 565 __________________ SVC CENTER:SSSC __________ TREE TRIMMING REQ'D:NO __________________ZIP CODE:N/A ENGINEERING DESIGN STA 1, T# 1657 PARK TERR E./ DIR BORE 3" AND PULL IN NEW 4/0URD, DISCONNECT/REMOVE OLD SERVICE, TO STA 2. STA 2, H# 1662 PARK TERR E./ INSTALL PULL BOX, ELEC WILL TIE IN NEW SERVICE TO THIS BOX. ***** NEW HOMES BUILD ***** STA 2 STA 1 17TH ST ROW21-0051