Loading...
33 Lewis St RES21-0242 Windows and DoorsOWNER:ADDRESS:CITY:STATE:ZIP: HILL LINDA FAYE 33 LEWIS ST ATLANTIC BEACH FL 32233-1917 COMPANY:ADDRESS:CITY:STATE:ZIP: AB&H CONSTRUCTION LLC 565 E HILLSBORO BLVD DEERFIELD BEACH FL 33441 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 172204 0000 DONNERS R/P JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 33 LEWIS ST RESIDENTIAL WINDOWS/DOORS WINDOW AND DOORS $20274.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 455-0000-322-1000 0 $155.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $77.50 STATE DBPR SURCHARGE 455-0000-208-0700 0 $3.49 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.33 TOTAL: $238.32 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 8/10/2021 PERMIT NUMBER RES21-0242 ISSUED: 8/10/2021 EXPIRES: 2/6/2022 RESIDENTIAL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 2 of 2Issued Date: 8/10/2021 PERMIT NUMBER RES21-0242 ISSUED: 8/10/2021 EXPIRES: 2/6/2022 RESIDENTIAL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 DESCRIPTION ACCOUNT QTY PAID PermitTRAK $238.32 RES21-0242 Address: 33 LEWIS ST APN: 172204 0000 $238.32 BUILDING $155.00 BUILDING PERMIT 455-0000-322-1000 0 $155.00 BUILDING PLAN REVIEW $77.50 BUILDING PLAN CHECK 455-0000-322-1001 0 $77.50 STATE SURCHARGES $5.82 STATE DBPR SURCHARGE 455-0000-208-0700 0 $3.49 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.33 TOTAL FEES PAID BY RECEIPT: R16572 $238.32 Printed: Tuesday, August 10, 2021 11:30 AM Date Paid: Tuesday, August 10, 2021 Paid By: AB&H CONSTRUCTION LLC Pay Method: CREDIT CARD 495197920 1 of 1 Cashier: CG Cash Register Receipt City of Atlantic Beach Receipt Number R16572 Final Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION RES21-0242 1 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program Applicant: Linda Hill Home: (904) 729-9468 Property: 33 LEWIS ST Atlantic Beach, FL 32233 Assessor: Mahlon Jager Applicant Number:015340 Type of Loss:Hurricane Date of Loss: 9/10/2017 12:00 AM Date Inspected: 12/31/2019 1:00 AM Price List: FLJA8X_JAN20 Restoration/Service/Remodel Estimate: 015340 RES21-0242 2 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 2 For homes being rehabilitated, the HUD Green Building Retrofit Checklist (GBR Checklist) is a Federal construction standard requiring that work performed when receiving Federal funds must meet certain energy efficiency standards, whenever feasible. All eligible repairs must be performed in line with the GBR Checklist to the extent practicable. The Scope of Work Estimate (SWE) for remaining construction was written to the applicable specifications of the GBR Checklist and Program guidelines, including considerations for HUD Housing Quality Standards, and the Rebuild Florida Program Resilient Home Construction Standards (RHCS). If the summary for SWE total, excluding any RHCS, exceeds 75% of the cost of the Program estimate to rebuild a new home, as determined by the Program, the home will be reconstructed. The Federal government requires that reconstructed homes meet the ENERGY STAR Certified Home standards and that the home meets applicable Program standards. 3 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 3 015340 015340 DESCRIPTION QNTY UNIT COST TOTAL Confirmed cause of damage: The dwelling has confirmed damage from Hurricane IRMA. CRE damages: The applicant did not make any repairs following Hurricane IRMA. SWE damages: The Damage Assessor observed damage to the ceiling in the bathroom and also bedroom 2 closet ceiling, as a result of minimal roof damage. Other: This dwelling did not flood. HQS: Smoke detectors have been added per SOP standards. RHCS: Window and door replacement have been included as dwelling was built prior to 2003 and sustained Hurricane IRMA damage. Front Elevation DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this area. Left Elevation DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this area. Rear Elevation DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this area. Right Elevation DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this area. Roof Roof DESCRIPTION QNTY UNIT COST TOTAL 4 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 4 CONTINUED - Roof DESCRIPTION QNTY UNIT COST TOTAL ------------------------------ROOFING------------------------- 1. Roofing Repair - Minimum Charge - Labor and Material 1.00 EA @ 663.09 = 663.09 ------------------------------DEMO------------------------------ 2. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA @ 515.00 = 515.00 Main Level Living Room Height: 8' Missing Wall 9' 8" X 8'Opens into KITCHEN Missing Wall 4' X 8'Opens into HALLWAY DESCRIPTION QNTY UNIT COST TOTAL ------------DOORS & WINDOWS (RHCS)--------------- 3. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA @ 495.00 = 495.00 Per RHCS 4a. Remove Exterior door - metal - insulated - Standard grade 1.00 EA @ 18.54 =18.54 4b. Exterior door - metal - insulated - Standard grade 1.00 EA @ 256.02 = 256.02 per RHCS 5. Additional charge for a retrofit exterior door 1.00 EA @ 154.35 = 154.35 per RHCS 6. Prime & paint door slab only - exterior (per side)2.00 EA @ 35.20 =70.40 per RHCS 7. Paint door/window trim & jamb - 2 coats (per side)2.00 EA @ 23.35 =46.70 per RHCS 8. Door lockset & deadbolt - exterior 1.00 EA @ 83.49 =83.49 per RHCS 9. Vinyl double hung retrofit window with low e and impact resistant 2.00 EA @ 1,200.00 = 2,400.00 glass including window screens – 9sf to 12sf Per RHCS ------------------------------ELECTRICAL---------------------------- 10a. Remove Smoke detector 1.00 EA @ 9.51 =9.51 10b. Smoke detector 1.00 EA @ 50.66 =50.66 5 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 5 Living Room Closet not accessable Height: 8' DESCRIPTION QNTY UNIT COST TOTAL No access to this room. Kitchen Height: 8' Missing Wall 9' 8" X 8'Opens into LIVING_ROOM DESCRIPTION QNTY UNIT COST TOTAL ------------DOORS & WINDOWS (RHCS)--------------- 11a. Remove Exterior door - metal - insulated - Standard grade 1.00 EA @ 18.54 =18.54 11b. Exterior door - metal - insulated - Standard grade 1.00 EA @ 256.02 = 256.02 per RHCS 12. Additional charge for a retrofit exterior door 1.00 EA @ 154.35 = 154.35 per RHCS 13. Prime & paint door slab only - exterior (per side)2.00 EA @ 35.20 =70.40 per RHCS 14. Paint door/window trim & jamb - 2 coats (per side)2.00 EA @ 23.35 =46.70 per RHCS 15. Door lockset & deadbolt - exterior 1.00 EA @ 83.49 =83.49 per RHCS 16. Vinyl double hung retrofit window with low e and impact resistant 2.00 EA @ 1,200.00 = 2,400.00 glass including window screens – 9sf to 12sf Per RHCS Hallway Height: 8' Missing Wall 4' X 8'Opens into LIVING_ROOM DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this room Hall Closet Height: 8' DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this room 6 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 6 Attic DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this room Bedroom 1 Height: 8' Missing Wall - Goes to Floor 3' 7" X 6' 8"Opens into CLOSET_1 DESCRIPTION QNTY UNIT COST TOTAL ------------DOORS & WINDOWS (RHCS)--------------- 17. Vinyl double hung retrofit window with low e and impact resistant 2.00 EA @ 1,200.00 = 2,400.00 glass including window screens – 9sf to 12sf Per RHCS ------------------------------ELECTRICAL---------------------------- 18a. Remove Smoke detector 1.00 EA @ 9.51 =9.51 18b. Smoke detector 1.00 EA @ 50.66 =50.66 Closet 1 Height: 8' Missing Wall - Goes to Floor 3' 7" X 6' 8"Opens into ROOM8 DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this room Bathroom 1 Height: 8' DESCRIPTION QNTY UNIT COST TOTAL ------------------------------GENERAL ITEMS------------------------------ 19. Final cleaning - construction - Residential 49.41 SF @ 0.21 =10.38 20. Floor protection - self-adhesive plastic film 49.41 SF @ 0.42 =20.75 21. Mask the walls per square foot - plastic and tape - 4 mil 293.48 SF @ 0.19 =55.76 ------------------------------INSULATION------------------------------ 22a. Remove Blown-in insulation - 12" depth - R30 32.00 SF @ 0.84 =26.88 22b. Blown-in insulation - 12" depth - R30 32.00 SF @ 0.89 =28.48 ------------------------------WALLS & CEILINGS------------------------------ 23. Apply anti-microbial agent to the surface area 32.00 SF @ 0.27 =8.64 24. Seal stud wall for odor control 32.00 SF @ 0.67 =21.44 25. Drywall Repair - Minimum Charge - Minimum repair up to 32 SF 1.00 EA @ 313.15 = 313.15 7 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 7 CONTINUED - Bathroom 1 DESCRIPTION QNTY UNIT COST TOTAL 26. Texture drywall - machine 342.84 SF @ 0.36 = 123.42 27. Seal/prime then paint the walls and ceiling twice (3 coats)342.84 SF @ 0.98 = 335.98 ------------DOORS & WINDOWS (RHCS)--------------- 28. Vinyl double hung retrofit window with low e and impact resistant 1.00 EA @ 1,200.00 = 1,200.00 glass including window screens – 9sf to 12sf Per RHCS ------------------------------ELECTRICAL---------------------------- 29a. Remove Ground fault interrupter (GFI) outlet 1.00 EA @ 4.31 =4.31 29b. Ground fault interrupter (GFI) outlet 1.00 EA @ 29.40 =29.40 Bedroom 2 Height: 8' Missing Wall - Goes to Floor 3' 8" X 6' 8"Opens into CLOSET_2 DESCRIPTION QNTY UNIT COST TOTAL ------------DOORS & WINDOWS (RHCS)--------------- 30. Vinyl double hung retrofit window with low e and impact resistant 2.00 EA @ 1,200.00 = 2,400.00 glass including window screens – 9sf to 12sf Per RHCS ------------------------------ELECTRICAL---------------------------- 31a. Remove Smoke detector 1.00 EA @ 9.51 =9.51 31b. Smoke detector 1.00 EA @ 50.66 =50.66 Closet 2 Height: 8' Missing Wall - Goes to Floor 3' 8" X 6' 8"Opens into BEDROOM_2 DESCRIPTION QNTY UNIT COST TOTAL ------------------------------GENERAL ITEMS------------------------------ 32. Final cleaning - construction - Residential 14.30 SF @ 0.21 =3.00 33. Floor protection - self-adhesive plastic film 14.30 SF @ 0.42 =6.01 34. Mask the walls per square foot - plastic and tape - 4 mil 108.89 SF @ 0.19 =20.69 35. Detach & Reset Shelving - wire (vinyl coated)6.00 LF @ 8.35 =50.10 ------------------------------INSULATION------------------------------ 8 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 8 CONTINUED - Closet 2 DESCRIPTION QNTY UNIT COST TOTAL 36a. Remove Blown-in insulation - 12" depth - R30 14.30 SF @ 0.84 =12.01 36b. Blown-in insulation - 12" depth - R30 14.30 SF @ 0.89 =12.73 ------------------------------WALLS & CEILINGS------------------------------ 37. Apply anti-microbial agent to the ceiling 14.30 SF @ 0.27 =3.86 38. Seal stud wall for odor control 14.30 SF @ 0.67 =9.58 39. Drywall Repair - Minimum Charge - Minimum repair up to 32 SF 1.00 EA @ 313.15 = 313.15 40. Texture drywall - machine 123.19 SF @ 0.36 =44.35 41. Seal/prime then paint the walls and ceiling twice (3 coats)123.19 SF @ 0.98 = 120.73 Laundry Room Height: 8' DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this room Storage Area/Room Height: 8' DESCRIPTION QNTY UNIT COST TOTAL No storm related damage observed to this room Labor Minimums Applied DESCRIPTION QNTY UNIT COST TOTAL 42. Electrical labor minimum 1.00 EA @ 108.28 = 108.28 9 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 9 Grand Total Areas: 2,548.82 SF Walls 819.58 SF Ceiling SF Walls and Ceiling3,368.40 819.64 SF Floor 91.07 SY Flooring 316.19 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 330.69 LF Ceil. Perimeter 819.64 Floor Area 896.39 Total Area 2,590.30 Interior Wall Area 1,264.50 Exterior Wall Area 123.83 Exterior Perimeter of Walls 1,167.88 Surface Area 11.68 Number of Squares 273.40 Total Perimeter Length 33.92 Total Ridge Length 0.00 Total Hip Length Coverage Item Total % ACV Total % SWE 3,041.68 19.50%3,065.34 19.20% RHCS 12,554.00 80.50%12,901.62 80.80% Total 15,595.68 100.00%15,966.96 100.00% 10 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 10 Summary for SWE Line Item Total 3,041.68 Material Sales Tax @ 7.000%23.66 Replacement Cost Value $3,065.34 Net Claim $3,065.34 11 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 11 Summary for RHCS Line Item Total 12,554.00 Material Sales Tax @ 7.000%347.62 Replacement Cost Value $12,901.62 Net Claim $12,901.62 12 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 12 Recap by Room Estimate: 015340 Area: Roof Roof 1,178.09 7.55% Coverage: SWE 100.00% =1,178.09 Area Subtotal: Roof 7.55%1,178.09 Coverage: SWE 100.00% =1,178.09 Area: Main Level Living Room 3,584.67 22.99% Coverage: SWE 1.68% =60.17 Coverage: RHCS 98.32% =3,524.50 Kitchen 3,029.50 19.43% Coverage: RHCS 100.00% =3,029.50 Bedroom 1 2,460.17 15.77% Coverage: SWE 2.45% =60.17 Coverage: RHCS 97.55% =2,400.00 Bathroom 1 2,178.59 13.97% Coverage: SWE 44.92% =978.59 Coverage: RHCS 55.08% =1,200.00 Bedroom 2 2,460.17 15.77% Coverage: SWE 2.45% =60.17 Coverage: RHCS 97.55% =2,400.00 Closet 2 596.21 3.82% Coverage: SWE 100.00% =596.21 Area Subtotal: Main Level 91.75%14,309.31 Coverage: SWE 12.27% =1,755.31 Coverage: RHCS 87.73% =12,554.00 Labor Minimums Applied 108.28 0.69% Coverage: SWE 100.00% =108.28 Subtotal of Areas 100.00%15,595.68 Coverage: SWE 19.50% =3,041.68 Coverage: RHCS 80.50% =12,554.00 Total 15,595.68 100.00% 13 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 13 1 Front Elevation - 1-Front Date Taken: 12/31/2019 Taken By: Mahlon Jager 2 Left Elevation - 2-Left elevation Date Taken: 12/31/2019 Taken By: Mahlon Jager 14 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 14 3 Left Elevation - 3-Left elevation Date Taken: 12/31/2019 Taken By: Mahlon Jager 4 Left Elevation - 4-Left elevation Date Taken: 12/31/2019 Taken By: Mahlon Jager Broken window 15 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 15 5 Rear Elevation - 5-Rear elevation Date Taken: 12/31/2019 Taken By: Mahlon Jager 6 Right Elevation - 6-Right elevation Date Taken: 12/31/2019 Taken By: Mahlon Jager 16 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 16 7 Right Elevation - 7-Right elevation Date Taken: 12/31/2019 Taken By: Mahlon Jager 8 Right Elevation - 8-Right elevation Date Taken: 12/31/2019 Taken By: Mahlon Jager 17 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 17 9 Roof/Roof - 9-Roof Date Taken: 12/31/2019 Taken By: Mahlon Jager 10 Roof/Roof - 10-Roof Date Taken: 12/31/2019 Taken By: Mahlon Jager 18 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 18 11 Roof/Roof - 11-Roof Date Taken: 12/31/2019 Taken By: Mahlon Jager 12 Roof/Roof - 12-Roof Date Taken: 12/31/2019 Taken By: Mahlon Jager 19 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 19 13 Main Level/Living Room - 13- Living Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 14 Main Level/Living Room - 14- Living Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 20 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 20 15 Main Level/Living Room - 15- Living Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 16 Main Level/Living Room - 16- Living Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 21 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 21 17 Main Level/Living Room - 17- Living Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 18 Main Level/Living Room - 18- Living Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 22 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 22 19 Main Level/Living Room Closet not accessable - 19-Living Room Closet Date Taken: 12/31/2019 Taken By: Mahlon Jager 20 Main Level/Kitchen - 20-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 23 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 23 21 Main Level/Kitchen - 21-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 22 Main Level/Kitchen - 22-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 24 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 24 23 Main Level/Kitchen - 23-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 24 Main Level/Kitchen - 24-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 25 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 25 25 Main Level/Kitchen - 25-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 26 Main Level/Kitchen - 26-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 26 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 26 27 Main Level/Kitchen - 27-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 28 Main Level/Kitchen - 28-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 27 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 27 29 Main Level/Kitchen - 29-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 30 Main Level/Kitchen - 30-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 28 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 28 31 Main Level/Kitchen - 31-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 32 Main Level/Kitchen - 32-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 29 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 29 33 Main Level/Kitchen - 33-Kitchen Date Taken: 12/31/2019 Taken By: Mahlon Jager 34 Main Level/Hallway - 34-Hallway Date Taken: 12/31/2019 Taken By: Mahlon Jager 30 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 30 35 Main Level/Hallway - 35-Hallway Date Taken: 12/31/2019 Taken By: Mahlon Jager 36 Main Level/Hallway - 36-Hallway Date Taken: 12/31/2019 Taken By: Mahlon Jager 31 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 31 37 Main Level/Hallway - 37-Hallway Date Taken: 12/31/2019 Taken By: Mahlon Jager 38 Main Level/Hall Closet - 38- Hallway Closet Date Taken: 12/31/2019 Taken By: Mahlon Jager 32 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 32 39 Main Level/Hall Closet - 39- Hallway Closet Date Taken: 12/31/2019 Taken By: Mahlon Jager 40 Main Level/Hall Closet - 40- Hallway Closet Date Taken: 12/31/2019 Taken By: Mahlon Jager 33 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 33 41 Main Level/Attic - 41-Attic Date Taken: 12/31/2019 Taken By: Mahlon Jager 42 Main Level/Attic - 42-Attic Date Taken: 12/31/2019 Taken By: Mahlon Jager 34 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 34 43 Main Level/Attic - 43-Attic Date Taken: 12/31/2019 Taken By: Mahlon Jager 44 Main Level/Bedroom 1 - 44- Bedroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 35 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 35 45 Main Level/Bedroom 1 - 45- Bedroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 46 Main Level/Bedroom 1 - 46- Bedroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 36 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 36 47 Main Level/Bedroom 1 - 47- Bedroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 48 Main Level/Bedroom 1 - 48- Bedroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 37 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 37 49 Main Level/Bedroom 1 - 49- Bedroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 50 Main Level/Closet 1 - 50-Closet 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 38 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 38 51 Main Level/Closet 1 - 51-Closet 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 52 Main Level/Closet 1 - 52-Closet 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 39 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 39 53 Main Level/Bathroom 1 - 53- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 54 Main Level/Bathroom 1 - 54- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 40 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 40 55 Main Level/Bathroom 1 - 55- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 56 Main Level/Bathroom 1 - 56- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 41 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 41 57 Main Level/Bathroom 1 - 57- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 58 Main Level/Bathroom 1 - 58- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 42 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 42 59 Main Level/Bathroom 1 - 59- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 60 Main Level/Bathroom 1 - 60- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 43 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 43 61 Main Level/Bathroom 1 - 61- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 62 Main Level/Bathroom 1 - 62- Bathroom 1 Date Taken: 12/31/2019 Taken By: Mahlon Jager 44 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 44 63 Main Level/Bedroom 2 - 63- Bedroom 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 64 Main Level/Bedroom 2 - 64- Bedroom 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 45 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 45 65 Main Level/Bedroom 2 - 65- Bedroom 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 66 Main Level/Bedroom 2 - 66- Bedroom 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 46 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 46 67 Main Level/Bedroom 2 - 67- Bedroom 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 68 Main Level/Bedroom 2 - 68- Bedroom 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 47 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 47 69 Main Level/Closet 2 - 69-Closet 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 70 Main Level/Closet 2 - 70-Closet 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 48 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 48 71 Main Level/Closet 2 - 71-Closet 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 72 Main Level/Closet 2 - 72-Closet 2 Date Taken: 12/31/2019 Taken By: Mahlon Jager 49 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 49 73 Main Level/Closet 2 - 73-Address Date Taken: 12/31/2019 Taken By: Mahlon Jager 74 Main Level/Closet 2 - 74-Front elevation Date Taken: 12/31/2019 Taken By: Mahlon Jager 50 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 50 75 Main Level/Laundry Room - 75- Laundry Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 76 Main Level/Laundry Room - 76- Laundry Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 51 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 51 77 Main Level/Laundry Room - 77- Laundry Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 78 Main Level/Laundry Room - 78- Laundry Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 52 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 52 79 Main Level/Laundry Room - 79- Laundry Room Date Taken: 12/31/2019 Taken By: Mahlon Jager 80 Main Level/Storage Area/Room - 80-Storage Area Date Taken: 12/31/2019 Taken By: Mahlon Jager 53 Scope of Work Estimate Rebuild Florida Housing Repair and Replacement Program 015340 1/7/2020 Page: 53 81 Main Level/Storage Area/Room - 81-Storage Area Date Taken: 12/31/2019 Taken By: Mahlon Jager 82 Main Level/Storage Area/Room - 82-Storage Area Date Taken: 12/31/2019 Taken By: Mahlon Jager 54 01 5 3 4 0 1/7/2020 P a g e : 5 4 Ma i n L e v e l Li v i n g R o o m Ki t c h e n Li v i n g R o o m C l o s e t n o t a c c e s s a b l e La u n d r y R o o m S t o r a g e A r e a / R o o m Be d r o o m 2 Ha l l w a y Be d r o o m 1 Ba t h r o o m 1 Cl o s e t 1 Cl o s e t 2 Ha l l C l o s e t Fr o n t P o r c h ( A 1 ) Main Level 1 3 ' 1 0 " 10 ' 10 ' 6 " 1 2 ' 1 0 " 14 ' 8 " 14 ' 8 " 16 ' 7 " 17 ' 3 " 3' 1 0 " 9 ' 8 " 4 ' 2 " 3 ' 6 " 2 ' 1 0 " 10 ' 2 " 10 ' 8 " 14 ' 4 " 3 0 ' 2 ' 8 " 5 ' 3 " 5 ' 7 " 1 2 ' 2 5 ' 1 0 " 10 ' 4 " 7' 8 " 3 ' 9 " 2' 5 " 10 ' 9 " 4' 2' 7 " 3 ' 5 " 8' 2' 5' 1 0 " 5' 4 " 5 ' 1 1 " 2 ' 10 ' 5 " 5 ' 1 " 2 ' 1 0 " 14 ' 6 " 4 ' 2 " 55 01 5 3 4 0 1/7/2020 P a g e : 5 5 Ro o f Ro o f (A ) F 1 (B ) F 2 Roof 33 ' 1 1 " 1 7 ' 3 " 1 6 ' 4 " 1 7 ' 3 " 1 6 ' 4 " 3 2 ' 8 "