33 Lewis St RES21-0242 Windows and DoorsOWNER:ADDRESS:CITY:STATE:ZIP:
HILL LINDA FAYE 33 LEWIS ST ATLANTIC BEACH FL 32233-1917
COMPANY:ADDRESS:CITY:STATE:ZIP:
AB&H CONSTRUCTION LLC 565 E HILLSBORO BLVD DEERFIELD BEACH FL 33441
TYPE OF
CONSTRUCTION:
REAL ESTATE
NUMBER:ZONING:BUILDING USE
GROUP:SUBDIVISION:
172204 0000 DONNERS R/P
JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK:
33 LEWIS ST RESIDENTIAL
WINDOWS/DOORS WINDOW AND DOORS $20274.00
FEES
DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT
BUILDING PERMIT 455-0000-322-1000 0 $155.00
BUILDING PLAN CHECK 455-0000-322-1001 0 $77.50
STATE DBPR SURCHARGE 455-0000-208-0700 0 $3.49
STATE DCA SURCHARGE 455-0000-208-0600 0 $2.33
TOTAL: $238.32
LIST OF CONDITIONS
Roll off container company must be on City approved list . Container cannot be placed on City right-of-way.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property
that may be found in the public records of this county, and there may be additional permits required from other
governmental entities such as water management districts, state agencies, or federal agencies.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN
YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT
MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE
RECORDING YOUR NOTICE OF COMMENCEMENT.
MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION.
ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING
CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES .
ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY.
1 of 2Issued Date: 8/10/2021
PERMIT NUMBER
RES21-0242
ISSUED: 8/10/2021
EXPIRES: 2/6/2022
RESIDENTIAL PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
2 of 2Issued Date: 8/10/2021
PERMIT NUMBER
RES21-0242
ISSUED: 8/10/2021
EXPIRES: 2/6/2022
RESIDENTIAL PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
DESCRIPTION ACCOUNT QTY PAID
PermitTRAK $238.32
RES21-0242 Address: 33 LEWIS ST APN: 172204 0000 $238.32
BUILDING $155.00
BUILDING PERMIT 455-0000-322-1000 0 $155.00
BUILDING PLAN REVIEW $77.50
BUILDING PLAN CHECK 455-0000-322-1001 0 $77.50
STATE SURCHARGES $5.82
STATE DBPR SURCHARGE 455-0000-208-0700 0 $3.49
STATE DCA SURCHARGE 455-0000-208-0600 0 $2.33
TOTAL FEES PAID BY RECEIPT: R16572 $238.32
Printed: Tuesday, August 10, 2021 11:30 AM
Date Paid: Tuesday, August 10, 2021
Paid By: AB&H CONSTRUCTION LLC
Pay Method: CREDIT CARD 495197920
1 of 1
Cashier: CG
Cash Register Receipt
City of Atlantic Beach
Receipt Number
R16572
Final Plumbing
Final Electrical
Final HVAC
CC Final
Final Building*
Swimming Pool Steel
Swimming Pool Safety
Electrical Grounding & Bonding
Swimming Pool Final (Bldg)
Swimming Pool Final (PW)
Formed Columns/ Beams*
Masonry Cell Fill
Structural Steel*
OTHER:
OTHER:
OTHER:
OTHER:
OTHER:
Power Pole
Silt Fence
Piers/ Stem Walls
Underground Plumbing
Underground Electric
Foundation/ Footing
Slab**
Retaining Wall Footing
Driveway
Sewer (Building Dept)
Sewer Tap (Utilities Dept)
Rough Electric*
Rough Plumbing/ Top Out*
Rough Mechanical*
House Wrap
Wall Sheathing
Roof Sheathing
Tie-down Framing Connections
Rough Framing
Roofing In Progress
Window/Door In-Progress
Insulation Ceiling
Insulation Wall
Exterior Lath
Stucco Scratch Coat
Exterior Siding In-Progress
Brick Flashing & Ties
Early Power
Gas Rough
Gas Final*
* When all rough electric, plumbing, mechanical are complete but before any work is
covered up.
* When all gas piping is complete and wallboard is installed but before gas is
attached to any appliance. All outlets must be capped and pipe pressurized at a
minimum of 15 lbs.
* For new living space: When all construction work including electrical, plumbing,
mechanical, exterior finish, grading, required paving and landscaping is complete
and the building is ready for occupancy, but before being occupied
Additional inspections may apply to your project if your project
contains these elements:
INSPECTIONS REQUIRED FOR BUILDING PERMITS
To verify compliance with building codes, inspections of the work authorized are required at various points of the construction.
The following inspections are typically required for residential projects:
Date: Initial: Date: Initial:
_____________________________________________________
Permit Type
____________________________________________________
Permit No.
__________________________________________________________
Job Address
____________________________________________________
Contractor
POST THIS CARD WITH PERMITS AND PERMIT
DOCUMENTATION IN FRONT OF BUILDING
Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends
Building Department Public Works/Utilities Fire Department
Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789
Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203
* When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all
electrical, plumbing and mechanical work is in place, but before concrete is poured.
* When all structural steel members are in place and all connections are complete,
but before such work is covered or concealed.
** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION
RES21-0242
1
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
Applicant: Linda Hill Home: (904) 729-9468
Property: 33 LEWIS ST
Atlantic Beach, FL 32233
Assessor: Mahlon Jager
Applicant Number:015340 Type of Loss:Hurricane
Date of Loss: 9/10/2017 12:00 AM
Date Inspected: 12/31/2019 1:00 AM
Price List: FLJA8X_JAN20
Restoration/Service/Remodel
Estimate: 015340
RES21-0242
2
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 2
For homes being rehabilitated, the HUD Green Building Retrofit Checklist (GBR Checklist) is a Federal construction standard
requiring that work performed when receiving Federal funds must meet certain energy efficiency standards, whenever feasible.
All eligible repairs must be performed in line with the GBR Checklist to the extent practicable. The Scope of Work Estimate
(SWE) for remaining construction was written to the applicable specifications of the GBR Checklist and Program guidelines,
including considerations for HUD Housing Quality Standards, and the Rebuild Florida Program Resilient Home Construction
Standards (RHCS).
If the summary for SWE total, excluding any RHCS, exceeds 75% of the cost of the Program estimate to rebuild a new home, as
determined by the Program, the home will be reconstructed. The Federal government requires that reconstructed homes meet the
ENERGY STAR Certified Home standards and that the home meets applicable Program standards.
3
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 3
015340
015340
DESCRIPTION QNTY UNIT COST TOTAL
Confirmed cause of damage: The dwelling has confirmed damage from Hurricane IRMA.
CRE damages: The applicant did not make any repairs following Hurricane IRMA.
SWE damages: The Damage Assessor observed damage to the ceiling in the bathroom and also bedroom 2 closet ceiling, as a result
of minimal roof damage.
Other: This dwelling did not flood.
HQS: Smoke detectors have been added per SOP standards.
RHCS: Window and door replacement have been included as dwelling was built prior to 2003 and sustained Hurricane IRMA
damage.
Front Elevation
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this area.
Left Elevation
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this area.
Rear Elevation
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this area.
Right Elevation
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this area.
Roof
Roof
DESCRIPTION QNTY UNIT COST TOTAL
4
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 4
CONTINUED - Roof
DESCRIPTION QNTY UNIT COST TOTAL
------------------------------ROOFING-------------------------
1. Roofing Repair - Minimum Charge - Labor and Material 1.00 EA @ 663.09 = 663.09
------------------------------DEMO------------------------------
2. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA @ 515.00 = 515.00
Main Level
Living Room Height: 8'
Missing Wall 9' 8" X 8'Opens into KITCHEN
Missing Wall 4' X 8'Opens into HALLWAY
DESCRIPTION QNTY UNIT COST TOTAL
------------DOORS & WINDOWS (RHCS)---------------
3. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA @ 495.00 = 495.00
Per RHCS
4a. Remove Exterior door - metal - insulated - Standard grade 1.00 EA @ 18.54 =18.54
4b. Exterior door - metal - insulated - Standard grade 1.00 EA @ 256.02 = 256.02
per RHCS
5. Additional charge for a retrofit exterior door 1.00 EA @ 154.35 = 154.35
per RHCS
6. Prime & paint door slab only - exterior (per side)2.00 EA @ 35.20 =70.40
per RHCS
7. Paint door/window trim & jamb - 2 coats (per side)2.00 EA @ 23.35 =46.70
per RHCS
8. Door lockset & deadbolt - exterior 1.00 EA @ 83.49 =83.49
per RHCS
9. Vinyl double hung retrofit window with low e and impact resistant 2.00 EA @ 1,200.00 = 2,400.00
glass including window screens – 9sf to 12sf
Per RHCS
------------------------------ELECTRICAL----------------------------
10a. Remove Smoke detector 1.00 EA @ 9.51 =9.51
10b. Smoke detector 1.00 EA @ 50.66 =50.66
5
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 5
Living Room Closet not accessable Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
No access to this room.
Kitchen Height: 8'
Missing Wall 9' 8" X 8'Opens into LIVING_ROOM
DESCRIPTION QNTY UNIT COST TOTAL
------------DOORS & WINDOWS (RHCS)---------------
11a. Remove Exterior door - metal - insulated - Standard grade 1.00 EA @ 18.54 =18.54
11b. Exterior door - metal - insulated - Standard grade 1.00 EA @ 256.02 = 256.02
per RHCS
12. Additional charge for a retrofit exterior door 1.00 EA @ 154.35 = 154.35
per RHCS
13. Prime & paint door slab only - exterior (per side)2.00 EA @ 35.20 =70.40
per RHCS
14. Paint door/window trim & jamb - 2 coats (per side)2.00 EA @ 23.35 =46.70
per RHCS
15. Door lockset & deadbolt - exterior 1.00 EA @ 83.49 =83.49
per RHCS
16. Vinyl double hung retrofit window with low e and impact resistant 2.00 EA @ 1,200.00 = 2,400.00
glass including window screens – 9sf to 12sf
Per RHCS
Hallway Height: 8'
Missing Wall 4' X 8'Opens into LIVING_ROOM
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this room
Hall Closet Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this room
6
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 6
Attic
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this room
Bedroom 1 Height: 8'
Missing Wall - Goes to Floor 3' 7" X 6' 8"Opens into CLOSET_1
DESCRIPTION QNTY UNIT COST TOTAL
------------DOORS & WINDOWS (RHCS)---------------
17. Vinyl double hung retrofit window with low e and impact resistant 2.00 EA @ 1,200.00 = 2,400.00
glass including window screens – 9sf to 12sf
Per RHCS
------------------------------ELECTRICAL----------------------------
18a. Remove Smoke detector 1.00 EA @ 9.51 =9.51
18b. Smoke detector 1.00 EA @ 50.66 =50.66
Closet 1 Height: 8'
Missing Wall - Goes to Floor 3' 7" X 6' 8"Opens into ROOM8
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this room
Bathroom 1 Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
------------------------------GENERAL ITEMS------------------------------
19. Final cleaning - construction - Residential 49.41 SF @ 0.21 =10.38
20. Floor protection - self-adhesive plastic film 49.41 SF @ 0.42 =20.75
21. Mask the walls per square foot - plastic and tape - 4 mil 293.48 SF @ 0.19 =55.76
------------------------------INSULATION------------------------------
22a. Remove Blown-in insulation - 12" depth - R30 32.00 SF @ 0.84 =26.88
22b. Blown-in insulation - 12" depth - R30 32.00 SF @ 0.89 =28.48
------------------------------WALLS & CEILINGS------------------------------
23. Apply anti-microbial agent to the surface area 32.00 SF @ 0.27 =8.64
24. Seal stud wall for odor control 32.00 SF @ 0.67 =21.44
25. Drywall Repair - Minimum Charge - Minimum repair up to 32 SF 1.00 EA @ 313.15 = 313.15
7
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 7
CONTINUED - Bathroom 1
DESCRIPTION QNTY UNIT COST TOTAL
26. Texture drywall - machine 342.84 SF @ 0.36 = 123.42
27. Seal/prime then paint the walls and ceiling twice (3 coats)342.84 SF @ 0.98 = 335.98
------------DOORS & WINDOWS (RHCS)---------------
28. Vinyl double hung retrofit window with low e and impact resistant 1.00 EA @ 1,200.00 = 1,200.00
glass including window screens – 9sf to 12sf
Per RHCS
------------------------------ELECTRICAL----------------------------
29a. Remove Ground fault interrupter (GFI) outlet 1.00 EA @ 4.31 =4.31
29b. Ground fault interrupter (GFI) outlet 1.00 EA @ 29.40 =29.40
Bedroom 2 Height: 8'
Missing Wall - Goes to Floor 3' 8" X 6' 8"Opens into CLOSET_2
DESCRIPTION QNTY UNIT COST TOTAL
------------DOORS & WINDOWS (RHCS)---------------
30. Vinyl double hung retrofit window with low e and impact resistant 2.00 EA @ 1,200.00 = 2,400.00
glass including window screens – 9sf to 12sf
Per RHCS
------------------------------ELECTRICAL----------------------------
31a. Remove Smoke detector 1.00 EA @ 9.51 =9.51
31b. Smoke detector 1.00 EA @ 50.66 =50.66
Closet 2 Height: 8'
Missing Wall - Goes to Floor 3' 8" X 6' 8"Opens into BEDROOM_2
DESCRIPTION QNTY UNIT COST TOTAL
------------------------------GENERAL ITEMS------------------------------
32. Final cleaning - construction - Residential 14.30 SF @ 0.21 =3.00
33. Floor protection - self-adhesive plastic film 14.30 SF @ 0.42 =6.01
34. Mask the walls per square foot - plastic and tape - 4 mil 108.89 SF @ 0.19 =20.69
35. Detach & Reset Shelving - wire (vinyl coated)6.00 LF @ 8.35 =50.10
------------------------------INSULATION------------------------------
8
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 8
CONTINUED - Closet 2
DESCRIPTION QNTY UNIT COST TOTAL
36a. Remove Blown-in insulation - 12" depth - R30 14.30 SF @ 0.84 =12.01
36b. Blown-in insulation - 12" depth - R30 14.30 SF @ 0.89 =12.73
------------------------------WALLS & CEILINGS------------------------------
37. Apply anti-microbial agent to the ceiling 14.30 SF @ 0.27 =3.86
38. Seal stud wall for odor control 14.30 SF @ 0.67 =9.58
39. Drywall Repair - Minimum Charge - Minimum repair up to 32 SF 1.00 EA @ 313.15 = 313.15
40. Texture drywall - machine 123.19 SF @ 0.36 =44.35
41. Seal/prime then paint the walls and ceiling twice (3 coats)123.19 SF @ 0.98 = 120.73
Laundry Room Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this room
Storage Area/Room Height: 8'
DESCRIPTION QNTY UNIT COST TOTAL
No storm related damage observed to this room
Labor Minimums Applied
DESCRIPTION QNTY UNIT COST TOTAL
42. Electrical labor minimum 1.00 EA @ 108.28 = 108.28
9
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 9
Grand Total Areas:
2,548.82 SF Walls 819.58 SF Ceiling SF Walls and Ceiling3,368.40
819.64 SF Floor 91.07 SY Flooring 316.19 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 330.69 LF Ceil. Perimeter
819.64 Floor Area 896.39 Total Area 2,590.30 Interior Wall Area
1,264.50 Exterior Wall Area 123.83 Exterior Perimeter of
Walls
1,167.88 Surface Area 11.68 Number of Squares 273.40 Total Perimeter Length
33.92 Total Ridge Length 0.00 Total Hip Length
Coverage Item Total % ACV Total %
SWE 3,041.68 19.50%3,065.34 19.20%
RHCS 12,554.00 80.50%12,901.62 80.80%
Total 15,595.68 100.00%15,966.96 100.00%
10
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 10
Summary for SWE
Line Item Total 3,041.68
Material Sales Tax @ 7.000%23.66
Replacement Cost Value $3,065.34
Net Claim $3,065.34
11
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 11
Summary for RHCS
Line Item Total 12,554.00
Material Sales Tax @ 7.000%347.62
Replacement Cost Value $12,901.62
Net Claim $12,901.62
12
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 12
Recap by Room
Estimate: 015340
Area: Roof
Roof 1,178.09 7.55%
Coverage: SWE 100.00% =1,178.09
Area Subtotal: Roof 7.55%1,178.09
Coverage: SWE 100.00% =1,178.09
Area: Main Level
Living Room 3,584.67 22.99%
Coverage: SWE 1.68% =60.17
Coverage: RHCS 98.32% =3,524.50
Kitchen 3,029.50 19.43%
Coverage: RHCS 100.00% =3,029.50
Bedroom 1 2,460.17 15.77%
Coverage: SWE 2.45% =60.17
Coverage: RHCS 97.55% =2,400.00
Bathroom 1 2,178.59 13.97%
Coverage: SWE 44.92% =978.59
Coverage: RHCS 55.08% =1,200.00
Bedroom 2 2,460.17 15.77%
Coverage: SWE 2.45% =60.17
Coverage: RHCS 97.55% =2,400.00
Closet 2 596.21 3.82%
Coverage: SWE 100.00% =596.21
Area Subtotal: Main Level 91.75%14,309.31
Coverage: SWE 12.27% =1,755.31
Coverage: RHCS 87.73% =12,554.00
Labor Minimums Applied 108.28 0.69%
Coverage: SWE 100.00% =108.28
Subtotal of Areas 100.00%15,595.68
Coverage: SWE 19.50% =3,041.68
Coverage: RHCS 80.50% =12,554.00
Total 15,595.68 100.00%
13
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 13
1 Front Elevation - 1-Front
Date Taken: 12/31/2019
Taken By: Mahlon Jager
2 Left Elevation - 2-Left elevation
Date Taken: 12/31/2019
Taken By: Mahlon Jager
14
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 14
3 Left Elevation - 3-Left elevation
Date Taken: 12/31/2019
Taken By: Mahlon Jager
4 Left Elevation - 4-Left elevation
Date Taken: 12/31/2019
Taken By: Mahlon Jager
Broken window
15
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 15
5 Rear Elevation - 5-Rear elevation
Date Taken: 12/31/2019
Taken By: Mahlon Jager
6 Right Elevation - 6-Right elevation
Date Taken: 12/31/2019
Taken By: Mahlon Jager
16
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 16
7 Right Elevation - 7-Right elevation
Date Taken: 12/31/2019
Taken By: Mahlon Jager
8 Right Elevation - 8-Right elevation
Date Taken: 12/31/2019
Taken By: Mahlon Jager
17
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 17
9 Roof/Roof - 9-Roof
Date Taken: 12/31/2019
Taken By: Mahlon Jager
10 Roof/Roof - 10-Roof
Date Taken: 12/31/2019
Taken By: Mahlon Jager
18
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 18
11 Roof/Roof - 11-Roof
Date Taken: 12/31/2019
Taken By: Mahlon Jager
12 Roof/Roof - 12-Roof
Date Taken: 12/31/2019
Taken By: Mahlon Jager
19
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 19
13 Main Level/Living Room - 13-
Living Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
14 Main Level/Living Room - 14-
Living Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
20
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 20
15 Main Level/Living Room - 15-
Living Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
16 Main Level/Living Room - 16-
Living Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
21
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 21
17 Main Level/Living Room - 17-
Living Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
18 Main Level/Living Room - 18-
Living Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
22
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 22
19 Main Level/Living Room Closet
not accessable - 19-Living Room
Closet
Date Taken: 12/31/2019
Taken By: Mahlon Jager
20 Main Level/Kitchen - 20-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
23
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 23
21 Main Level/Kitchen - 21-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
22 Main Level/Kitchen - 22-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
24
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 24
23 Main Level/Kitchen - 23-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
24 Main Level/Kitchen - 24-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
25
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 25
25 Main Level/Kitchen - 25-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
26 Main Level/Kitchen - 26-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
26
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 26
27 Main Level/Kitchen - 27-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
28 Main Level/Kitchen - 28-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
27
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 27
29 Main Level/Kitchen - 29-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
30 Main Level/Kitchen - 30-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
28
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 28
31 Main Level/Kitchen - 31-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
32 Main Level/Kitchen - 32-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
29
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 29
33 Main Level/Kitchen - 33-Kitchen
Date Taken: 12/31/2019
Taken By: Mahlon Jager
34 Main Level/Hallway - 34-Hallway
Date Taken: 12/31/2019
Taken By: Mahlon Jager
30
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 30
35 Main Level/Hallway - 35-Hallway
Date Taken: 12/31/2019
Taken By: Mahlon Jager
36 Main Level/Hallway - 36-Hallway
Date Taken: 12/31/2019
Taken By: Mahlon Jager
31
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 31
37 Main Level/Hallway - 37-Hallway
Date Taken: 12/31/2019
Taken By: Mahlon Jager
38 Main Level/Hall Closet - 38-
Hallway Closet
Date Taken: 12/31/2019
Taken By: Mahlon Jager
32
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 32
39 Main Level/Hall Closet - 39-
Hallway Closet
Date Taken: 12/31/2019
Taken By: Mahlon Jager
40 Main Level/Hall Closet - 40-
Hallway Closet
Date Taken: 12/31/2019
Taken By: Mahlon Jager
33
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 33
41 Main Level/Attic - 41-Attic
Date Taken: 12/31/2019
Taken By: Mahlon Jager
42 Main Level/Attic - 42-Attic
Date Taken: 12/31/2019
Taken By: Mahlon Jager
34
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 34
43 Main Level/Attic - 43-Attic
Date Taken: 12/31/2019
Taken By: Mahlon Jager
44 Main Level/Bedroom 1 - 44-
Bedroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
35
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 35
45 Main Level/Bedroom 1 - 45-
Bedroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
46 Main Level/Bedroom 1 - 46-
Bedroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
36
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 36
47 Main Level/Bedroom 1 - 47-
Bedroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
48 Main Level/Bedroom 1 - 48-
Bedroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
37
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 37
49 Main Level/Bedroom 1 - 49-
Bedroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
50 Main Level/Closet 1 - 50-Closet 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
38
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 38
51 Main Level/Closet 1 - 51-Closet 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
52 Main Level/Closet 1 - 52-Closet 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
39
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 39
53 Main Level/Bathroom 1 - 53-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
54 Main Level/Bathroom 1 - 54-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
40
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 40
55 Main Level/Bathroom 1 - 55-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
56 Main Level/Bathroom 1 - 56-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
41
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 41
57 Main Level/Bathroom 1 - 57-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
58 Main Level/Bathroom 1 - 58-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
42
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 42
59 Main Level/Bathroom 1 - 59-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
60 Main Level/Bathroom 1 - 60-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
43
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 43
61 Main Level/Bathroom 1 - 61-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
62 Main Level/Bathroom 1 - 62-
Bathroom 1
Date Taken: 12/31/2019
Taken By: Mahlon Jager
44
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 44
63 Main Level/Bedroom 2 - 63-
Bedroom 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
64 Main Level/Bedroom 2 - 64-
Bedroom 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
45
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 45
65 Main Level/Bedroom 2 - 65-
Bedroom 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
66 Main Level/Bedroom 2 - 66-
Bedroom 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
46
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 46
67 Main Level/Bedroom 2 - 67-
Bedroom 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
68 Main Level/Bedroom 2 - 68-
Bedroom 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
47
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 47
69 Main Level/Closet 2 - 69-Closet 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
70 Main Level/Closet 2 - 70-Closet 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
48
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 48
71 Main Level/Closet 2 - 71-Closet 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
72 Main Level/Closet 2 - 72-Closet 2
Date Taken: 12/31/2019
Taken By: Mahlon Jager
49
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 49
73 Main Level/Closet 2 - 73-Address
Date Taken: 12/31/2019
Taken By: Mahlon Jager
74 Main Level/Closet 2 - 74-Front
elevation
Date Taken: 12/31/2019
Taken By: Mahlon Jager
50
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 50
75 Main Level/Laundry Room - 75-
Laundry Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
76 Main Level/Laundry Room - 76-
Laundry Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
51
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 51
77 Main Level/Laundry Room - 77-
Laundry Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
78 Main Level/Laundry Room - 78-
Laundry Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
52
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 52
79 Main Level/Laundry Room - 79-
Laundry Room
Date Taken: 12/31/2019
Taken By: Mahlon Jager
80 Main Level/Storage Area/Room -
80-Storage Area
Date Taken: 12/31/2019
Taken By: Mahlon Jager
53
Scope of Work Estimate
Rebuild Florida Housing Repair and Replacement Program
015340 1/7/2020 Page: 53
81 Main Level/Storage Area/Room -
81-Storage Area
Date Taken: 12/31/2019
Taken By: Mahlon Jager
82 Main Level/Storage Area/Room -
82-Storage Area
Date Taken: 12/31/2019
Taken By: Mahlon Jager
54
01
5
3
4
0
1/7/2020
P
a
g
e
:
5
4
Ma
i
n
L
e
v
e
l
Li
v
i
n
g
R
o
o
m
Ki
t
c
h
e
n
Li
v
i
n
g
R
o
o
m
C
l
o
s
e
t
n
o
t
a
c
c
e
s
s
a
b
l
e
La
u
n
d
r
y
R
o
o
m
S
t
o
r
a
g
e
A
r
e
a
/
R
o
o
m
Be
d
r
o
o
m
2
Ha
l
l
w
a
y
Be
d
r
o
o
m
1
Ba
t
h
r
o
o
m
1
Cl
o
s
e
t
1
Cl
o
s
e
t
2
Ha
l
l
C
l
o
s
e
t
Fr
o
n
t
P
o
r
c
h
(
A
1
)
Main Level
1
3
'
1
0
"
10
'
10
'
6
"
1
2
'
1
0
"
14
'
8
"
14
'
8
"
16
'
7
"
17
'
3
"
3'
1
0
"
9
'
8
"
4
'
2
"
3
'
6
"
2
'
1
0
"
10
'
2
"
10
'
8
"
14
'
4
"
3
0
'
2
'
8
"
5
'
3
"
5
'
7
"
1
2
'
2
5
'
1
0
"
10
'
4
"
7'
8
"
3
'
9
"
2'
5
"
10
'
9
"
4'
2'
7
"
3
'
5
"
8'
2'
5'
1
0
"
5'
4
"
5
'
1
1
"
2
'
10
'
5
"
5
'
1
"
2
'
1
0
"
14
'
6
"
4
'
2
"
55
01
5
3
4
0
1/7/2020
P
a
g
e
:
5
5
Ro
o
f
Ro
o
f
(A
)
F
1
(B
)
F
2
Roof
33
'
1
1
"
1
7
'
3
"
1
6
'
4
"
1
7
'
3
"
1
6
'
4
"
3
2
'
8
"