Loading...
1021 ATLANTIC BLVD COMM21-0047 - COMcheckLTGCOMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Title: 2020 Florida Building Code, Energy Conservation Project Type:Alteration Construction Site: 961 Atlantic Blvd. Atlantic Beach, Florida 32233 Owner/Agent:Designer/Contractor: James Payne Pursuit Engineering 4910 Browns Bridge Road Cumming, Georgia 30041 678-948-6637 info@PursuitEngineering.com Project Information Energy Code: NFCU - Atlantic Village Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts 1-Common Space Types:Sales Area 3965 1.59 6304 6304Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixture Common Space Types: Sales Area (3965 sq.ft.) LED: L1A/L1B: LED Panel 40W:1 9 38 346 LED: L2A/L2B: LED Panel 33W:1 23 26 605 LED: L2C: LED Panel 33W:1 3 26 79 LED: L3A: LED Other Fixture Unit 40W:1 12 40 475 LED: L4A/L4B: LED Other Fixture Unit 60W:1 17 59 1010 LED: L5A: LED Other Fixture Unit 36W:1 3 31 94 LED: L6A/L6B: LED Other Fixture Unit 90W:1 9 89 804 LED: L6C: Other:1 2 796 1593 LED: L7: LED Undercabinet Unit 11.4W:1 3 11 34 LED: L8: Other:1 2 15 30 LED: L9: Other:1 3 26 78 5147Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2020 Florida Building Code, Energy Conservation requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Interior Lighting PASSES Project Title: Data filename: NFCU - Atlantic Village 09/10/21Report date: 81 ofPage Name - Title Signature Date Project Title: Data filename: NFCU - Atlantic Village 09/10/21Report date: 82 ofPage James Payne - Electrical designer 09/10/2021 COMcheck Software Version COMcheckWeb Exterior Lighting Compliance Certificate Project Title: 2020 Florida Building Code, Energy Conservation Project Type:Alteration Construction Site: 961 Atlantic Blvd. Atlantic Beach, Florida 32233 Owner/Agent:Designer/Contractor: James Payne Pursuit Engineering 4910 Browns Bridge Road Cumming, Georgia 30041 678-948-6637 info@PursuitEngineering.com Project Information Energy Code: NFCU - Atlantic Village 3 (Other (LZ3))Exterior Lighting Zone Allowed Exterior Lighting Power A Area/Surface Category B Quantity C Allowed Watts / D Tradable Wattage E Allowed Watts (B X C) Free standing/attached sales canopy 700 ft2 0.6 Yes 420 ATM/Night depository location (c)2 45 No 225 Illuminated area of facade wall or surface 40 ft2 0.11 No 5 Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 420 650 500 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. (c)ATM/Night depository sites have a base allowance of 180 W per site. Proposed Exterior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixture Free standing/attached sales canopy (700 ft2): Tradable Wattage LED: E1/E1A: Other:1 5 35 175 ATM/Night depository location (2 machines): Non-tradable Wattage LED: E2: LED Other Fixture Unit 36W:1 1 29 29 Illuminated area of facade wall or surface (40 ft2): Non-tradable Wattage LED: E3: LED Other Fixture Unit 36W:1 1 29 29 175Total Tradable Proposed Watts = Project Title: Data filename: NFCU - Atlantic Village 09/10/21Report date: 83 ofPage Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2020 Florida Building Code, Energy Conservation requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Exterior Lighting PASSES Project Title: Data filename: NFCU - Atlantic Village 09/10/21Report date: 84 ofPage James Payne - Electrical designer 09/10/2021 Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version COMcheckWeb Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2020 Florida Building Code, Energy Conservation Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable C103.2 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: NFCU - Atlantic Village 09/10/21Report date: 85 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.2. 2 [EL22]1 Spaces required to have light- reduction controls have a manual control that allows the occupant to reduce the connected lighting load in a reasonably uniform illumination pattern >= 50 percent. Complies Does Not Not Observable Not Applicable C405.2.1, C405.2.1. 1 [EL18]1 Occupancy sensors installed in classrooms/lecture/training rooms, conference/meeting/multipurpose rooms, copy/print rooms, lounges/breakrooms, enclosed offices, open plan office areas, restrooms, storage rooms, locker rooms, warehouse storage areas, and other spaces <= 300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 for open plan office spaces. Complies Does Not Not Observable Not Applicable C405.2.1. 2 [EL19]1 Occupancy sensors control function in warehouses: In warehouses, the lighting in aisleways and open areas is controlled with occupant sensors that automatically reduce lighting power by 50% or more when the areas are unoccupied. The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. Complies Does Not Not Observable Not Applicable C405.2.1. 3 [EL20]1 Occupant sensor control function in open plan office areas: Occupant sensor controls in open office spaces >= 300 sq.ft. have controls 1) configured so that general lighting can be controlled separately in control zones with floor areas <= 600 sq.ft. within the space, 2) automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 3) are configured so that general lighting power in each control zone is reduced by >= 80% of the full zone general lighting power within 20 minutes of all occupants leaving that control zone, and 4) are configured such that any daylight responsive control will activate space general lighting or control zone general lighting only when occupancy for the same area is detected. Complies Does Not Not Observable Not Applicable C405.2.2, C405.2.2. 1, C405.2.2. 2 [EL21]2 Each area not served by occupancy sensors (per C405.2.1) have time- switch controls and functions detailed in sections C405.2.2.1 and C405.2.2.2. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: NFCU - Atlantic Village 09/10/21Report date: 86 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL23]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. See code section C405.2.3 Daylight-responsive controls for applicable spaces, C405.2.3.1 Daylight responsive control function and section C405.2.3.2 Sidelit zone. Complies Does Not Not Observable Not Applicable C405.2.4 [EL26]1 Separate lighting control devices for specific uses installed per approved lighting plans. 1. Display and accent lighting, lighting in display cases, supplemental task lighting and lighting equipment for sale shall have occupancy sensor control. 2) Sleeping units shall have auto off controls. Complies Does Not Not Observable Not Applicable C405.2.5 [EL28]3 Manual lighting controls are in a location with ready access and where controlled lights are visible. Complies Does Not Not Observable Not Applicable C405.2.6 [EL30]3 Exterior lighting systems provided with controls complying with C405.2.6.1 through C405.2.6.4 for daylight shutoff and decorative lighting shutoff. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: NFCU - Atlantic Village 09/10/21Report date: 87 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable C405.3.2 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C405.4.2 [FI19]1 Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Exterior Lighting fixture schedule for values. C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: NFCU - Atlantic Village 09/10/21Report date: 88 ofPage